unit II mini project (let me know if you need any thing else from me to complete this)

  

  • Weight: 10%      of course grade
  • Grading Rubric
  • Due: Tuesday, 04/07/2020 11:59      PM (CST)

Instructions

Don't use plagiarized sources. Get Your Custom Essay on
unit II mini project (let me know if you need any thing else from me to complete this)
Just from $13/Page
Order Essay

Over the course of the next six units, you will be developing a course project. You will complete a single section of the course project in every unit by completing one section of the course project, and then you will add to it with the subsequent work in the following unit. This unit work will be in the form of unit mini projects.

Our course project will be to develop a document titled “A Permit by Rule (PBR) Evaluation for a Painting Operation” and will serve as a simulation of our work as a contract environmental engineer to an industrial organization planning a painting operation within the United States.

The Scenario:

You have contracted with an industrial organization to engineer and write a state air Permit by Rule (PBR) evaluation for a painting operation facility. According to the local state laws and U.S. Environmental Protection Agency (EPA) laws, the facility must have an air permit before construction begins. Once the facility is completed, the construction air permit will then become the operational air permit for the facility.

As a result, your client wants the air permit to automatically align the painting operation facility into operational compliance with state and federal air quality laws. Consequently, it is extremely important for you to evaluate the planned painting operation against the PBR requirements in order to meet the air permit criteria, using the state guidance document and considering the equipment and chemicals already planned for the facility operations.

You have tabulated the following information from what you have gleaned from the material SDS documents and equipment technical data sheets plan (depending on your scenario selection, each “unit” represents a single aircraft, rail tank car, or vehicle):

  

Interior Liner Coating Material

10   gallons coating/unit

2   gallons of solvent/unit

 

Unit   Lining Application

Apply   interior liners to two (2) units/day

Work   five (5) hours/day and four (4) days/week

 

Unit   Lining Curing

Cure   interior liners of two (2) units/day

Work   five (5) hours/day and four (4) days/week
 

Interior   Liner Cure

Heater   fuel source is natural gas-fired drying oven

Heater   generates 2.1 million (MM) Btu/hr at maximum 2,500 hrs/year

 

Unit   Lining Design

Cross-draft   air plenum

Unit   interior is the spray area

 

Exhaust   Fan

10,000   ft3/min (CFM)

1   exhaust fan

 

Air   Makeup Unit

5760 ft3/min   (CFM)

1 air   makeup system

 

Filter   Openings

20.0 ft2 each

Two (2)   filter openings

 

Coating   WV

VOC   content

2.8   lb/gal coating

 

Coating   VM

Coating   volume

1.0 gal

 

Water   Content

Per   gal/coating

1.0   lb/gal

 

Water   Density

Per   gal/water

8.34   lb/gal

 

Coating   VW

Water   volume

Calculation

 

Exempt-solvent   Content

Per   gal/coating

0.5   lb/gal

 

Exempt-solvent   Density

Per   gal/exempt solvent

6.64   lb/gal

 

Coating   Ves

Exempt   solvent volume

Calculation

Additionally, your state’s department of environmental quality (DEQ) has provided you the following PBR limits:

  

Potential to Emit (PTE)

100   tons VOC/year

 

Face   Velocity

100   ft/min

 

Filter   Velocity

250   ft/min

 

VOC/5-hour   period

6.0   lbs/hr

 

Short-term   Emissions

1.0   lbs/hr

 

Long-term   Emissions

1.0   tons/yr

From your first visit with your client, these are your notes and process flow sketch reflecting the intended operational design:

  • The      client has designed an interior coating spray painting system that allows      the interior of each unit to be coated.
  • The      operations will involve a stripped-down unit being brought into the      facility’s shop.
  • The      shop is a steel building with a finished concrete floor and a paint booth      for each unit.
  • The      unit will be placed in the spray booth.
  • The      booth will be opened at one end of the booth for makeup air.
  • The      exhaust air will flow through an exhaust chamber at the other end of the      unit.
  • For      each unit, once the liner application operations are completed, the forced      curing (drying) operations will immediately commence.

Instructions:

  1. Closely      read the required reading assignment from the textbook and the unit lesson      within the study guide, and consider reading the suggested reading.
  2. Select      the PBR evaluation document to be for only one of the      following: (a) an aircraft manufacturing exterior coating paint booth, (b)      a rail tank car interior lining process, or (c) a vehicle exterior coating      paint booth. You will continue with this scenario selection for the      remaining six units, to complete the entire document.
  3. Using      APA style (title page, abstract page, body with level 1 headings, and a      reference page) for a research paper, begin drafting a PBR evaluation      document. You will add to this document in every subsequent unit with      another prescribed level 1 heading, building out the entire document one      section at a time.
  4. Make      your Unit II work the first level 1 heading (center, bold) titled “General      Considerations for Operation,” and describe the scenario that is presented      above, while specifically describing the scenario that you selected      (aircraft, tank car, or vehicle). While describing your scenario, you must      include the environmental, health, and safety (EHS) implications of the      work system while pulling from the textbook as well as any other relevant      sources that are presented in the unit lesson in the study guide. In your      description of the EHS implications of the system, be sure to discuss the      natural and anthropomorphic variables causally related to outdoor air      pollution. You are required to describe the scenario in at least 200 words      (minimum). You may find it convenient to summarize the tabulated information      in your General Considerations section of the permit for future reference      throughout the rest of the course, but do not attempt to tabulate the      information in the exact order as what is presented here (to avoid a high      match in SafeAssign).
  5. Also under      the first level 1 heading, present a box and line process flow diagram      (PFD) drawing of the selected scenario. See the drawing on page 375 of the      textbook as an additional example of a PFD if you need assistance      understanding how to draw one; do not draw the same system that is      provided on that page. Do not hand-draw this, but use the “insert” and      “shapes” features within Microsoft Word to construct the PFD. Simple      labeled boxes and lines are adequate for this preliminary work, so it is      not necessary to present specific shapes in your PFD for your selected      scenario.
  6. In      your abstract section (page 2 of the document), write one or two sentences      that reflect your work for this unit. We will be adding one sentence per      unit to reflect our work as we go, with the final abstract length being      about 8 to 10 sentences long.

In following units (Units III through VII), the unit lessons will contain information related to the interior surface coating operation by means of practical mathematical calculation examples. Consequently, it is imperative that you read the unit lessons within the study guide in every unit, use the math calculation examples provided in each unit lesson, and consider the current (as well as previous) material from the textbook and the additional information cited and referenced in the study guide for every unit. This project will serve as a comprehensive demonstration of your applied learning of engineering air quality.

Your completed mini project should be a minimum of one page, not counting the title page, abstract page, and reference page. You are required to use at least one outside source, which may be your textbook. All sources used, including the textbook, must be referenced; paraphrased and quoted material must have accompanying APA citations.

Open

Quick Links

Quick Links

Page Landmarks

    Content Outline

    Keyboard Shortcuts

    Logout
    Global Menu
    Michael AdamsActivity Updates

    Home

    Help

    Top Frame Tabs

    Home
    Tab 1 of 3 (active tab)

    Notifications
    Tab 2 of 3

    My Community
    Tab 3 of 3

    Current Location

    MEE 6501-18H-5B20-S1, Advanced Air Quality Control

    Unit II

    Menu Management Options

    Course Menu:
    MEE 6501-18H-5B20-S1, Advanced Air Quality Control

    COURSE INFORMATION

    Start Here

    Announcements

    Syllabus/Schedule

    Unit I

    Unit II

    Communication Forums

    Grades

    RESOURCES

    My Library

    Math and Writing Center

    Student Resources

    Tools

    Unit II

    Content

    Unit II Intro – Atmospheric Effects

    Unit 2 goes into a deeper discussion on the topic of atmospheric effects.  The conditions that impact visibility comparing factors that produce hazy conditions and pristine air.  The topic of stratospheric ozone depletion is presented along with the topic of global warming.  Today this might be better described as a component of climate change. The unit has a discussion board and a mini project for the assessment.

    Unit II Study Guide

    Click the link above to open the unit study guide, which contains this unit’s lesson and reading assignment(s). This information is necessary in order to complete this course.

    Unit II Discussion Board

    Unit II Discussion Board Open

    Weight: 2% of course grade

    Grading Rubric
    Response Due: Saturday, 04/04/2020 11:59 PM (CST)
    Comment Due: Tuesday, 04/07/2020 11:59 PM (CST)

    Go to Unit II Discussion Board »

    Unit II Mini Project

    Unit II Mini Project Open

    Weight: 10% of course grade

    Grading Rubric
    Due: Tuesday, 04/07/2020 11:59 PM (CST)

    Instructions
    Over the course of the next six units, you will be developing a course
    project. You will complete a single section of the course project in every
    unit by completing one section of the course project, and then you will add
    to it with the subsequent work in the following unit. This unit work will
    be in the form of unit mini projects.
    Our course project will be to develop a document titled “A Permit by Rule
    (PBR) Evaluation for a Painting Operation” and will serve as a simulation of
    our work as a contract environmental engineer to an industrial organization
    planning a painting operation within the United States.
    The Scenario:
    You have contracted with an industrial organization to engineer and write
    a state air Permit by Rule (PBR) evaluation for a painting operation facility.
    According to the local state laws and U.S. Environmental Protection Agency
    (EPA) laws, the facility must have an air permit before construction begins.
    Once the facility is completed, the construction air permit will then become
    the operational air permit for the facility.
    As a result, your client wants the air permit to automatically align the
    painting operation facility into operational compliance with state and federal
    air quality laws. Consequently, it is extremely important for you to evaluate
    the planned painting operation against the PBR requirements in order to meet
    the air permit criteria, using the state guidance document and considering the
    equipment and chemicals already planned for the facility operations.
    You have tabulated the following information from what you have gleaned
    from the material SDS documents and equipment technical data sheets plan
    (depending on your scenario selection, each “unit” represents a single
    aircraft, rail tank car, or vehicle):

    Interior Liner Coating Material

    10 gallons coating/unit

    2 gallons of solvent/unit

    Unit Lining Application

    Apply interior liners to two (2) units/day

    Work five (5) hours/day and four (4) days/week

    Unit Lining Curing

    Cure interior liners of two (2) units/day

    Work five (5) hours/day and four (4) days/week

    Interior Liner Cure

    Heater fuel source is natural gas-fired drying oven

    Heater generates 2.1 million (MM) Btu/hr at maximum 2,500
    hrs/year

    Unit Lining Design

    Cross-draft air plenum

    Unit interior is the spray area

    Exhaust Fan

    10,000 ft3/min (CFM)

    1 exhaust fan

    Air Makeup Unit

    5760 ft3/min (CFM)

    1 air makeup system

    Filter Openings

    20.0 ft2 each

    Two (2) filter openings

    Coating WV

    VOC content

    2.8 lb/gal coating

    Coating VM

    Coating volume

    1.0 gal

    Water Content

    Per gal/coating

    1.0 lb/gal

    Water Density

    Per gal/water

    8.34 lb/gal

    Coating VW

    Water volume

    Calculation

    Exempt-solvent Content

    Per gal/coating

    0.5 lb/gal

    Exempt-solvent Density

    Per gal/exempt solvent

    6.64 lb/gal

    Coating Ves

    Exempt solvent volume

    Calculation

    Additionally, your state’s department of environmental quality (DEQ) has
    provided you the following PBR limits:

    Potential to Emit (PTE) 100 tons VOC/year
    Face Velocity 100 ft/min
    Filter Velocity 250 ft/min
    VOC/5-hour period 6.0 lbs/hr
    Short-term Emissions 1.0 lbs/hr
    Long-term Emissions 1.0 tons/yr

    From your first visit with your client, these are your notes and process
    flow sketch reflecting the intended operational design:
    The client has designed an interior coating spray painting system that
    allows the interior of each unit to be coated.

    The operations will involve a stripped-down unit being brought into the
    facility’s shop.
    The shop is a steel building with a finished concrete floor and a paint
    booth for each unit.
    The unit will be placed in the spray booth.
    The booth will be opened at one end of the booth for makeup air.
    The exhaust air will flow through an exhaust chamber at the other end of
    the unit.
    For each unit, once the liner application operations are completed, the
    forced curing (drying) operations will
    immediately commence.

    Instructions:
    Closely read the required reading assignment from the textbook and the
    unit lesson within the study guide, and
    consider reading the suggested
    reading.
    Select the PBR evaluation document to be for only one of the
    following: (a) an aircraft manufacturing
    exterior coating paint booth, (b) a rail tank
    car interior lining process, or (c) a vehicle exterior
    coating paint booth. You will continue with
    this scenario selection for the remaining six units,
    to complete the entire document.
    Using APA style (title page, abstract page, body with level 1 headings,
    and a reference page) for a research paper,
    begin drafting a PBR evaluation document.
    You will add to this document in every subsequent
    unit with another prescribed level 1 heading,
    building out the entire document one section at a
    time.
    Make your Unit II work the first level 1 heading (center, bold) titled
    “General Considerations for Operation,” and describe the
    scenario that is presented above, while specifically
    describing the scenario that you selected
    (aircraft, tank car, or vehicle). While describing your
    scenario, you must include the environmental,
    health, and safety (EHS) implications of the work
    system while pulling from the textbook as well
    as any other relevant sources that are presented in
    the unit lesson in the study guide. In your
    description of the EHS implications of the system,
    be sure to discuss the natural and anthropomorphic
    variables causally related to outdoor air
    pollution. You are required to describe the scenario
    in at least 200 words (minimum). You may find it
    convenient to summarize the tabulated
    information in your General Considerations section
    of the permit for future reference throughout the
    rest of the course, but do not attempt to tabulate
    the information in the exact order as what is
    presented here (to avoid a high match in
    SafeAssign).
    Also under the first level 1 heading, present a box and line process flow
    diagram (PFD) drawing of the selected
    scenario. See the drawing on page 375 of the
    textbook as an additional example of a PFD if you
    need assistance understanding how to draw one; do
    not draw the same system that is provided on
    that page. Do not hand-draw this, but use the
    “insert” and “shapes” features within Microsoft
    Word to construct the PFD. Simple labeled boxes
    and lines are adequate for this preliminary work,
    so it is not necessary to present specific
    shapes in your PFD for your selected scenario.
    In your abstract section (page 2 of the document), write one or two
    sentences that reflect your work for this unit.
    We will be adding one sentence per unit to
    reflect our work as we go, with the final abstract
    length being about 8 to 10 sentences long.

    In following units (Units III through VII), the unit lessons will
    contain information related to the interior surface coating operation by
    means of practical mathematical calculation examples. Consequently, it is
    imperative that you read the unit lessons within the study guide in every
    unit, use the math calculation examples provided in each unit lesson, and
    consider the current (as well as previous) material from the textbook
    and the additional information cited and referenced in the study guide
    for every unit. This project will serve as a comprehensive demonstration
    of your applied learning of engineering air quality.
    Your completed mini project should be a minimum of one page, not counting the
    title page, abstract page, and reference page. You are required to use at least
    one outside source, which may be your textbook. All sources used, including the
    textbook, must be referenced; paraphrased and quoted material must have
    accompanying APA citations.

    Resources

    The following resource(s) may help you with this assignment.

    Citation Guide

    CSU Online Library Research Guide

    Submit Writing Center Request

    Submit Unit II Mini Project »

    Bootstrap

    Loading…

    ×
    ###

    Close

Over the course of the next six units, you will be developing a course project. You will complete a single section of the course project in every unit by completing one section of the course project, and then you will add to it with the subsequent work in the following unit. This unit work will be in the form of unit mini projects.

Our course project will be to develop a document titled “A Permit by Rule (PBR) Evaluation for a Painting Operation” and will serve as a simulation of our work as a contract environmental engineer to an industrial organization planning a painting operation within the United States.

The Scenario:

You have contracted with an industrial organization to engineer and write a state air Permit by Rule (PBR) evaluation for a painting operation facility. According to the local state laws and U.S. Environmental Protection Agency (EPA) laws, the facility must have an air permit before construction begins. Once the facility is completed, the construction air permit will then become the operational air permit for the facility.

As a result, your client wants the air permit to automatically align the painting operation facility into operational compliance with state and federal air quality laws. Consequently, it is extremely important for you to evaluate the planned painting operation against the PBR requirements in order to meet the air permit criteria, using the state guidance document and considering the equipment and chemicals already planned for the facility operations.

You have tabulated the following information from what you have gleaned from the material SDS documents and equipment technical data sheets plan (depending on your scenario selection, each “unit” represents a single aircraft, rail tank car, or vehicle):

Work five (5) hours/day and four (4) days/week

Per gal/coating

Calculation

Interior Liner Coating Material

10 gallons coating/unit

2 gallons of solvent/unit

Unit Lining Application

Apply interior liners to two (2) units/day

Work five (5) hours/day and four (4) days/week

Unit Lining Curing

Cure interior liners of two (2) units/day

Interior Liner Cure

Heater fuel source is natural gas-fired drying oven

Heater generates 2.1 million (MM) Btu/hr at maximum 2,500 hrs/year

Unit Lining Design

Cross-draft air plenum

Unit interior is the spray area

Exhaust Fan

10,000 ft3/min (CFM)

1 exhaust fan

Air Makeup Unit

5760 ft3/min (CFM)

1 air makeup system

Filter Openings

20.0 ft2 each

Two (2) filter openings

Coating WV

VOC content

2.8 lb/gal coating

Coating VM

Coating volume

1.0 gal

Water Content

Per gal/coating

1.0 lb/gal

Water Density

Per gal/water

8.34 lb/gal

Coating VW

Water volume

Calculation

Exempt-solvent Content

0.5 lb/gal

Exempt-solvent Density

Per gal/exempt solvent

6.64 lb/gal

Coating Ves

Exempt solvent volume

Additionally, your state’s department of environmental quality (DEQ) has provided you the following PBR limits:

Potential to Emit (PTE)

100 tons VOC/year

Face Velocity

100 ft/min

Filter Velocity

250 ft/min

VOC/5-hour period

6.0 lbs/hr

Short-term Emissions

1.0 lbs/hr

Long-term Emissions

1.0 tons/yr

From your first visit with your client, these are your notes and process flow sketch reflecting the intended operational design:

· The client has designed an interior coating spray painting system that allows the interior of each unit to be coated.

· The operations will involve a stripped-down unit being brought into the facility’s shop.

· The shop is a steel building with a finished concrete floor and a paint booth for each unit.

· The unit will be placed in the spray booth.

· The booth will be opened at one end of the booth for makeup air.

· The exhaust air will flow through an exhaust chamber at the other end of the unit.

· For each unit, once the liner application operations are completed, the forced curing (drying) operations will immediately commence.

Instructions:

1. Closely read the required reading assignment from the textbook and the unit lesson within the study guide, and consider reading the suggested reading.

2. Select the PBR evaluation document to be for only one of the following: (a) an aircraft manufacturing exterior coating paint booth, (b) a rail tank car interior lining process, or (c) a vehicle exterior coating paint booth. You will continue with this scenario selection for the remaining six units, to complete the entire document.

3. Using APA style (title page, abstract page, body with level 1 headings, and a reference page) for a research paper, begin drafting a PBR evaluation document. You will add to this document in every subsequent unit with another prescribed level 1 heading, building out the entire document one section at a time.

4. Make your Unit II work the first level 1 heading (center, bold) titled “General Considerations for Operation,” and describe the scenario that is presented above, while specifically describing the scenario that you selected (aircraft, tank car, or vehicle). While describing your scenario, you must include the environmental, health, and safety (EHS) implications of the work system while pulling from the textbook as well as any other relevant sources that are presented in the unit lesson in the study guide. In your description of the EHS implications of the system, be sure to discuss the natural and anthropomorphic variables causally related to outdoor air pollution. You are required to describe the scenario in at least 200 words (minimum). You may find it convenient to summarize the tabulated information in your General Considerations section of the permit for future reference throughout the rest of the course, but do not attempt to tabulate the information in the exact order as what is presented here (to avoid a high match in SafeAssign).

5. Also under the first level 1 heading, present a box and line process flow diagram (PFD) drawing of the selected scenario. See the drawing on page 375 of the textbook as an additional example of a PFD if you need assistance understanding how to draw one; do not draw the same system that is provided on that page. Do not hand-draw this, but use the “insert” and “shapes” features within Microsoft Word to construct the PFD. Simple labeled boxes and lines are adequate for this preliminary work, so it is not necessary to present specific shapes in your PFD for your selected scenario.

6. In your abstract section (page 2 of the document), write one or two sentences that reflect your work for this unit. We will be adding one sentence per unit to reflect our work as we go, with the final abstract length being about 8 to 10 sentences long.

In following units (Units III through VII), the unit lessons will contain information related to the interior surface coating operation by means of practical mathematical calculation examples. Consequently, it is imperative that you read the unit lessons within the study guide in every unit, use the math calculation examples provided in each unit lesson, and consider the current (as well as previous) material from the textbook and the additional information cited and referenced in the study guide for every unit. This project will serve as a comprehensive demonstration of your applied learning of engineering air quality.

Your completed mini project should be a minimum of one page, not counting the title page, abstract page, and reference page. You are required to use at least one outside source, which may be your textbook. All sources used, including the textbook, must be referenced; paraphrased and quoted material must have accompanying APA citations.

MEE 6501, Advanced Air Quality Control 1

Course Learning Outcomes for Unit II

Upon completion of this unit, students should be able to:

4. Examine causes of indoor and outdoor air pollution.
4.1 Describe the environmental, health, and safety (EHS) implications of a spray booth work

system.
4.2 Develop a box and line process flow diagram (PFD) drawing of a selected scenario.
4.3 Discuss the natural and anthropogenic variables causally related to outdoor air pollution.

Course/Unit
Learning Outcomes

Learning Activity

4.1
Unit Lesson
Chapter 4, pp. 101-150
Unit II Mini Project

4.2
Unit Lesson
Chapter 4, pp. 101-150
Unit II Mini Project

4.3
Unit Lesson
Chapter 4, pp. 101-150
Unit II Mini Project

Reading Assignment

Chapter 4: Atmospheric Effects, pp. 101–150

Unit Lesson

Many times, the public has a propensity to focus on air pollution derived from anthropogenic activities such as
manufacturing, construction, mining, transportation, industrial processes (e.g., oil and gas production and
refining) or even agricultural practices. However, as environmental engineers, we must pause and closely
consider both anthropogenic and natural variables that seem to be correlated to air quality.

Phalen and Phalen (2013) list several major global natural resources that are also considered to be significant
emitters of air pollutants (e.g., particles, sulfur, oxides of nitrogen as NOx, and carbon monoxide as CO), to
include the following: dust and soil, fires and natural oxidation, lightning, volcanic eruptions, sea spray, and
even biological actions.

What Godish, Davis, and Fu (2014) aptly demonstrate throughout this unit is that most of what must be
closely monitored and considered during air quality engineering activities are actually natural precursors of
formed pollutants (such as SO2 being a natural precursor to H2SO4 as sulfuric acid) and aerosol particles
(both natural or anthropogenic). As such, much of the information in this unit will be within the context of
particle science.

Aerosols

The study of particle science, as it relates to total air quality (visibility, breathability, agronomic impacts, and
global temperatures), is quite literally a combination of applied chemistry and physics (Phalen & Phalen,
2013). Consequently, our understanding of aerosols as airborne particles is imperative in order to adequately
understand the independent variables causally related to outdoor air quality. This importance is only
enhanced when we further consider anthropogenic processes (such as our course project related to an

UNIT II STUDY GUIDE

Engineering for Outdoor Air Quality

MEE 6501, Advanced Air Quality Control 2

UNIT x STUDY GUIDE

Title

industrial painting operation) that necessarily have the potential to discharge additional aerosol particles into
our air environment.

An aerosol could be defined as a particulate material that is
suspended in a gas, and thereby dispersed in air (Godish et al.,
2014; Phalen & Phalen, 2013). This particulate material (liquids,
solids, or a combination of these two matrices) is condensed and
is consequently able to stay suspended in the gas matrix. This
provides for a mobile particulate that is able to migrate into any
areas that an unfiltered ambient gas may travel and inhabit. As
such, we may readily recognize these aerosols by different names
in the study of air quality engineering, to include aerocolloids, ash,
fumes, fogs, hazes, lapilli, mists, smogs, smokes, ultrafines, and
many other depictions of suspended particulate matter outcomes.
They all refer to what we consider to be aerodisperse systems
(Phalen & Phalen, 2013).

From a simple physics perspective, we can speciate the
differences in aerosol particles by size, shape, density, and even
specific conductance. This ability to speciate is interestingly the
name (SPECIATE) of the U.S. Environmental Protection Agency’s
(U.S. EPA) repository of volatile organic gas and particulate
matter (PM) speciation profiles of air pollution sources (U.S.
Environmental Protection Agency [U.S. EPA], 2017). By
understanding the physical characteristics among particle types
within aerosols, we can then study the behavioral potential of aerosol types that include particle aerodynamic
equivalent diameters, surface area, particle diffusion, electrical charge distributions, and particle motion in the
air (Godish et al., 2014; Phalen & Phalen, 2013).

These additional evaluations of aerosol particles afford us the opportunity to statistically predict (model) air
pollution and pollution plume movement within our environment, even while informing our engineering
strategies for coagulating, precipitating, and filtering particles from the air (Godish et al., 2014; Phalen &
Phalen, 2013). Consequently, Godish et al. (2014) are careful to demonstrate this with their discussion of
mercury (Hg) deposition as they discuss the element’s unique chemistry that affects its movement between
the atmosphere and the Earth’s surface.

Control Systems

As such, a combination of physical and chemical strategies may be employed as we engineer control systems
to mitigate outdoor air pollution, regardless of the source (anthropogenic or natural). For example, given that
elemental Hg is environmentally mobile and readily floats or suspends in water, we might reasonably
anticipate being able to simply filter out elemental Hg from a drinking water source (Godish et al., 2014; Hill &
Feigl, 1987). However, given that methylmercury (CH3Hg) tends to remain dissolved in water (Godish et al.,
2014), we could reasonably expect CH3Hg to be unable to successfully filter out CH3Hg, and consequently we
would need to consider alternative chemical approaches. As a direct application of this idea, it has been
demonstrated that one effective means of removing CH3Hg from water is to chemically coagulate the CH3Hg
particle, then physically filter the total dissolved organic material (DOM) for effective pollutant removal
(Henneberry et al., 2011).

This approach of employing both physical and chemical processes in tandem as engineering controls for air
quality is the strategic approach that is stressed throughout the textbook. As a reminder, the more we can
engineer the hazard out of the work system, the higher our success rate will be for controlling the work
system and subsequently lowering the risks to humans and the environment (Manuele, 2014). Let’s look at
another practical application of this combined approach as we consider our course project work for this unit.

In our course project, we are provided with a scenario where you are an air quality engineering consultant
tasked with conducting a preliminary permitting (“Permit by Rule” or PBR) evaluation of a painting operation’s
facility for a given state’s air permit limits. You may choose from one of three scenario options of an aircraft
manufacturing exterior coating paint booth, a rail tank car interior lining process, or a vehicle exterior coating

Aerocolloids

Smogs, Smokes

Fumes, Fogs

Ash

Hazes, Mists

Lapilli

Ultrafines

Figure 1. Common aerodisperse system terms

MEE 6501, Advanced Air Quality Control 3

UNIT x STUDY GUIDE
Title

paint booth. This becomes important when we consider states with high-concentration air quality cities. For
example, we understand that air quality in Houston, Texas, has apparently become worse over time, even
with stringent air quality control standards having been in place for over 30 years (Godish et al., 2014). As an
air quality engineer, you would first obtain a copy of the affected state’s air emissions permitting guidance
document in order to understand the permitting requirements and the steps necessary to calculate forecasted
air emissions of gases, aerosols, and particulate matter.

Within the affected state’s guidance document, we would quickly review the standards to find the typical
emission limits of 25 tons per year of the following: (a) volatile organic compounds (VOC), (b) sulfur dioxide
(SO2), (c) inhalable particulate matter (by size) or PM10, and (d) any other air contaminants. Further, we would
typically find that there is a 250 ton per year limit for CO and NOx. Finally, we would find that the affected
state will typically pose specific limits for VOC emissions per year, per (paint) facility, as well as solvents and
exempt solvents used in the operation.

Understandably, this may cause us some initial alarm at how to address and measure all of these quantitative
emission limits. Consequently, we now must first gather information from our business records, paint vendor,
and Material Safety Data Sheet (now the more current Globally Harmonized System/Safety Data Sheet or
SDS) as a starting point. Considering the chemical compounds present in every single product to be used in
the operations is precisely where we must begin. Further, we will need information related to the paint
facility’s ventilation system, coating cure heaters, and even the facility’s operational schedule anticipated for
the work system.

For our scenario, the client has provided us with all of the SDS documents, heater technical data sheets,
ventilation system technical data sheets, paint facility drawings, and a clear idea of the anticipated hours of
operation for the facility. This information is tabulated for you in the scenario. However, here is how we would
have researched, documented, and tabulated that same information from the documents provided by the
client. Let’s go through these critical steps together.

First, you would do what every safety and environmental
engineer must do. In order to fully understand a given work
system, develop a process flow diagram (PFD) of the work
system. This affords us the opportunity to clearly identify
all required materials, equipment, and direction of flow of
those materials through the equipment. When we can
effectively draw an accurate PFD of the work system, we
can then more easily anticipate transitional points of
materials exchanges (e.g., solids to liquids, or liquids to
gases and aerosols), contact and emission points, and
ultimate disposition outcomes of emissions (such as
through filters and baghouses, liquid scrubbers, flares,
straight to atmosphere through emission stacks, and so
on).

Second, you would look at the SDS information found in
section 3.0 (Composition/Information on Ingredients) of every Occupational Safety and Health Administration
(OSHA) compliant SDS document. You would notice that tabulated within this section are the ingredients,
each ingredient’s Chemical Abstract Service (CAS) number, and each ingredient’s percent by weight within
the product. You would need to note every ingredient that qualifies as a VOC and its percent by weight.
Additionally, you would need to make a note of the pounds of VOC reported on the SDS for the entire
product. This would include both the coating (paint) and any thinner or solvent.

Third, you would notice the vapor pressure, vapor density, molecular weight, British thermal unit (Btu) values,
and other physical characteristics relevant to the air permit calculations in section 9.0 (Physical and Chemical
Properties). You would make a note of these values for every product. Understanding the physical
characteristics is arguably as important as understanding the chemical characteristics when conducting air
emissions permitting.

Fourth, you would make note of any Hazardous Air Pollutants (HAPs) identified in section 15.0 (Regulatory
Information) in the document. This information will be imperative in being able to properly calculate our total

Sample process flow diagram from oil and gas industry
(Ragsac19, 2017)

MEE 6501, Advanced Air Quality Control 4

UNIT x STUDY GUIDE
Title

VOC emissions in our Unit III work. A clear quantification of VOC emissions is often the most fundamental
step for most air emissions permitting processes.

Finally, after you reviewed the SDS for every paint and thinner, you would then look to the technical data
sheets for the heaters and ventilation system, as well as the paint operation facility drawings. You would note
the relevant variables necessary to complete the VOC calculations, ventilation calculations, and forecasted
emissions calculations. The subsequent calculated values (that we will learn to work through in Units III-VII)
will ultimately be compared directly against the affected state’s emission limit values. This direct comparison
will inform us as to whether or not the painting operation will be within the PBR emission limit requirements, or
if a full-blown U.S. EPA Title V Air Permit will be required prior to the company even breaking ground on the
construction of the new facility.

Reflect on the information we have discussed related to aerosols, particle science, and atmospheric
conditions within this unit lesson, and mentally tie together the concepts of engineering air quality through
environmental controls for optimal outdoor air quality. Your clear understanding of these concepts, coupled
with the Unit I concepts, will inform your learning throughout the rest of this course. Let’s get ready to identify
our empirical data so that we can begin to quantify our risks. This is what environmental and safety
engineering is all about!

References

Godish, T., Davis, W. T., & Fu, J. S. (2014). Air quality (5th ed.). Boca Raton, FL: CRC Press.

Henneberry, Y., Kraus, T., Fleck, J. Krabbenhoft, D. Bachand, P., & Horwath, W. (2011). Removal of

inorganic mercury and methylmercury from surface waters following coagulation of dissolved organic
matter with metal-based salts. The Science of the Total Environment, 409(3), 631–637.

Hill, J., & Feigl, D. (1987). Chemistry and life: An introduction to general, organic, and biological life (3rd ed.).

New York, NY: Macmillian.

Manuele, F. A. (2014). Advanced safety management: Focusing on Z10 and serious injury prevention.

Hoboken, NJ: Wiley.

Phalen, R. F., & Phalen, R. N. (2013). Introduction to air pollution science: A public health perspective.

Burlington, MA: Jones & Bartlett Learning.

Ragsac19. (2017). Process flow diagram, (ID 92756440) [Photograph]. Retrieved from

https://www.dreamstime.com/stock-photo-process-flow-diagram-concept-many-uses-oil-gas-industry-
image92756440

U.S. Environmental Protection Agency. (2017). Air emissions modeling: SPECIATE Version 4.5 through 4.0.

Retrieved from https://www.epa.gov/air-emissions-modeling/speciate-version-45-through-40

Suggested Reading

In order to access the following resource, click the link below.

The following article provides an interesting consideration of the potential impact of anthropogenic carbon
dioxide (CO2) on total atmospheric CO2 concentrations. This becomes an extremely important discussion
point in greenhouse gas emission studies related to affected industries and municipalities, even as air quality
engineers continue to gain a better understanding of anthropogenic versus natural greenhouse gas source
implications for our planet Earth.

MacDougall, A. H., Eby, M., & Weaver, A .J. (2013). If anthropogenic CO2 emissions cease, will atmospheric

CO2 concentration continue to increase? Journal of Climate, 26(23), 9563–9576. Retrieved from
https://libraryresources.columbiasouthern.edu/login?url=http://search.ebscohost.com/login.aspx?direc
t=true&db=a9h&AN=92016220&site=eds-live&scope=site

https://libraryresources.columbiasouthern.edu/login?url=http://search.ebscohost.com/login.aspx?direct=true&db=a9h&AN=92016220&site=eds-live&scope=site

https://libraryresources.columbiasouthern.edu/login?url=http://search.ebscohost.com/login.aspx?direct=true&db=a9h&AN=92016220&site=eds-live&scope=site

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy