Gateway WA: A Large Road Construction Project In Western Australia

Project Charter

Describe about A global provider of architecture, design, engineering, and construction services?

Gateway WA can be considered as one of the largest road construction projects in Western Australia (mainroads.wa.gov.au, 2015).The project is being undertaken by the Government of Western Australia. It is expected that the completion of the project will lead to enhancement of security and safety in existing transportation system of the area. Although the Main Roads WA is considered as the main stakeholder of Gateway WA project, actually the authority developed an alliance with private organizations (mainroads.wa.gov.au, 2015). The organizations which are included in this joint venture are- Georgiou, Leighton contractors, GHD, BG&E and AECOM (Gatewaywa.com.au, 2015). The construction of proposed transportation infrastructure is being undertaken in three parts. The total area which is being redeveloped is segmented into three parts-Northern area, southern area and western area. Gateway WA being a large project is divided into several tasks.  Expanded Tonkin and Leach highway, improved pedestrian facilities and designing of the area according to urban standards and public art can be considered as some of the key deliverables of Gateway WA project.

Don't use plagiarized sources. Get Your Custom Essay on
Gateway WA: A Large Road Construction Project In Western Australia
Just from $13/Page
Order Essay

 Components  of charter

Description

Analysis  of scope

·         Expansion of Tonkin Highway

·         Up gradation of Leach Highway

·         Development of Grade separated interchanges at  different intersections of network

·         Up gradation of interchange   at Tonkin/Roe Highway

·         Construction of on-ramp at Abernethy road

·         Improvement of local networks, pedestrian facilities

·         Designing landscapes

Business case  analysis

 Improving transportation infrastructure if Western Australia

 Milestones  for  project

·         Development of On ramp-December  2013

·         Temporary grade interchange at Tonkin/Horrie Miller and Kewdale road-mid 2014

·         Construction of 4 bridges  at Tonkin Highway-July 2014

·         Improvements in Kewdale-mid 2015

·         Construction   at Leach Highway and Abernethy road-2015

·         Grade separated interchange completion   at intersections –mid 2016

Identification and analysis of risks

·         Cost overrun

·         Legal issues

·         Technological issues

·         Delay  in  project completion

Estimation of budget

$ 1 billion

Analysis of stakeholders

·         Federal Government of Australia

·         Main Roads WA

·         State Government of WA

·         Georgiou,

·         Leighton contractors

·          GHD

·          BG&E

·         AECOM

Learned lessons

·         Importance of communication

·         Project planning

·         WBS development

Operating principle of teams

 Different manages were appointed for each zone. However, teams communicated with each other.

 

                                                                               Table 1: Project Charter for Gateway WA

Analysis of scope: 

According to Journal (2013) success of a project depend on the approach of executing it. Kenley (2014) opined that it is important to organize the tasks of a project to complete it successfully. However, identification of deliverables plays a major role in the process of organizing a project. Morris (2013) states that identification of project scope gives the ideas on its deliverable. It also provides information regarding the potential obstacles for successful execution of project.

Scope of the Gateway WA project includes expansion of Tonkin Highway as a six lane road, up gradation of Leach Highway according to the standards of an expressway, up gradation of Roe Highway (Gatewaywa.com.au, 2015). Successful completion of the project will also lead to development of vertical intersections at major junctions of Western Australia. Success criteria for the project completion also includes development of an on –ramp at Abernethy Road to Tonkin Highway. Tasks related to installation of advanced cycling infrastructure and local transportation development is also being conducted as a part of Gateway WA project (Gatewaywa.com.au, 2015).

 Lingard, (2010) states that analysis of business scopes leads to better identification of project deliverables. However Karrbom Gustavsson, and Gohary, (2012) also opined that business scope analysis provides us with the information regarding the need of undertaking a project. Thus the tasks of a project can be prioritized effectively using the findings of business case analysis. In case of current project the business case is analyzed by   reviewing current transportation infrastructure of Western Australia. However, the pressure on existing transportation infrastructure is also considered while analyzing the business case for Gateway WA project.

The Government of Western Australia   has initiated the project Gateway WA with the intention to improve the existing transportation facility of whole region (Gatewaywa.com.au, 2015). As the population is increasing in Western Australia, the number of vehicle is also increasing. It indicates that the roads are being more congested. Although the existing transportation facility is capable to handle the traffic, growth rate of vehicles indicates that the existing infrastructure requires being up graded immediately.  As the number of vehicles is increasing rapidly,   increasing the number of lanes in busy roads is essential to ensure uninterrupted flow of traffic. On other hand, increase in population is also leading to increase in the number of pedestrians and cyclists. It indicates that the infrastructure for pedestrian and cyclist facilities require to be upgraded to provide safety to the users. However, the project is also being undertaken for designing   the landscapes of major junctions in road network of Western Australia (Gatewaywa.com.au, 2015).

Completed tasks

Date of completion

Development of On ramp at Abernethy Road

December  2013

Gerry Archer Reserve Realignment

December 2013

Switching of traffic to temporary intersection of Tonkin Highway/Horrie Miller and Kewdale  intersection

Mid  2014

Construction  start of  four bridges

Mid 2014

Traffc Switching at Leach Highway   and Abernethy Road  intersection

August 2014

 Construction at Kewdale

Mid  2015

Construction at Leach and Abernethy  junction

By end of 2015

Construction of grade  separated interchanges

 By mid  2016

Analysis of Scope

 

                                                                                 Table 2: Milestones for Gateway WA

Gateway WA   was started in 2013. Initially it was estimated that the project will be finished by 2017.Analysis of the tasks within this project indicates that about half of the whole project has been completed. However, the current progress in project works indicates that Gateway WA can be completed within mid 2016 (Mediastatements.wa.gov.au, 2015). The tasks which are completed already ,are –development of Abernethy road on-ramp, development of temporary grade separated  interchange at  the intersection of Tonkin Highway, Kewdale  Road and Horrie Miller Drive  is also completed  in 2014 (Get The Bigger Picture, 2015).However , the tasks which are  expected  to be completed within  2015 are,  constructions in Leach Highway, Abernethy Road and Kewdale industrial  area. Permanent grade interchange development at different junctions of Tonkin Road, Kewdale Road, Horrie Miller Drive and Abernethy Road will be completed by mid 2016.

 The risks which are associated with Gateway WA project are – risks related with increase in budget, lack of funding, arising of legal issues and    technological issues.

According to Kenley (2012) most of the large infrastructure projects fail to be completed within estimated budget. As these projects are executed for a long time budget can increase due to sudden increases in price of raw materials.  On other hand Kloppenborg (2012) opined that the deliverables of infrastructure project requires being tested for several times before they become fully operational.  Budget of the project can increase if problems are found while testing new infrastructure for transportation.  The roads where construction works are going on are still being used by people. It is causing reducing the time for working in these roads. It may cause delay in project.

Kenley (2014) stated that complexity of project increases with increase in the number of stakeholders associated with it.  In the current project Federal Government and state government are responsible for funding. Apart from this, five constructors are also given with the responsibility of executing different tasks.  Although the Government agency made an alliance with these organizations and all the constructors are cooperating with each other to complete their tasks, chances of arising legal issues cannot be minimized.  Arising of legal issues among stakeholders can interrupt the progress of project and thus restrict it from being completed on time.

Although the Federal Government and state government are working jointly to raise fund, project may not be completed within the estimated budget. However it may require additional financial resources for being completed of the price if raw materials increase suddenly. Lack of fund can affect the progress.

Estimated budget of Gateway Construction is about $1 billion.  However the budget may increases as the construction is still being undertaken. As stated by Landin (2011) estimation of budget in case of large projects is difficult as large projects often fail to be completed on time. The Federal Government of Australia and the State Government are contributing jointly to raise the fund. The Federal Giver met contributed approximately $616 million to the find. On other hand the contribution of state Government is about $318 million (Gatewaywa.com.au, 2015).

Parameters

Sponsors

(Federal Government and  State Government agency-Main Roads WA)

Constructors

(Georgiou, Leighton contractors, GHD, BG&E and AECOM)

Transportation facility  users

Importance

 High

Funding  the project

High

Responsible  for  successful completion

High

 The project is  undertaken  to benefit users

Power

High

Takes all decision regarding fund

High

Takes  all decision regarding construction

Low

Cannot take part   directly in the process

Interest

High

Successful completion  will lead  to over all improvement of the area

High

Financial improvements

High

 Will  be benefited by  improved  infrastructure.

Influence

High

Decides  policies and  contracts

High

Develops  designs

Low

Not directly related with process

Impact

High

Can  modify policies

 

High

Can modify designs

Low

Not directly related with process

Urgency

 High

Lack of fund can cause delay

High

Poor quality can affect the   effectiveness of project 

Low

Not directly related with process

Legitimacy

Project Owner

Member  of  alliance

Users  will get the benefit of improved transportation system

Total

High

High

medium

Priority

Key

Key

Other

Business Case Analysis

 

                                                                    Table 3: Identification and analysis of stakeholders

Success of a project depends on the involvement of stakeholders with the process (Lau and Rowlinson, 2011). However the stakeholders can be categorized according to their influence on project (Morris, 2013). According to Lingard (2010) key stakeholders who are directly related with the process have more power to influence the process of undertaking a project. On other hand   impacts of the project are more evident in case of those stakeholders who are not directly related with project.

In this current project Main Roads WA, an agency of WA government is one of key stakeholders. Although different stakeholders are related with the project priority of stakeholders depend on how they are related with it. The Federal Government contributes a significant portion of the fund for undertaking the project. Thus the Federal Government is identified as another important stakeholder for this project. As construction is an important part of the whole process, companies which are responsible for executing construction works   are also consud4ed as key stakeholders. Other key stakeholders for Gateway project are- Georgiou, Leighton contractors GHD, BG&E and AECOM. Successful up gradation of transportation infrastructure will benefit the users. People who use the transportation facilities are considered as stakeholders for this project. However, Morris (2013) stated that large projects can be influenced by various factors and   thus it is difficult to identify all stakeholders of a project.

According to Lingard (2010) identification of main deliverable in a project is important for developing effective plans. In case of large projects , proper planning is important  for   completion  of  tasks  with in time the experience of working in Gateway WA  helped us to learn  how  small tasks  of  a large projects can be identified. We also realized the importance of identifying deliverables while developing plans. However we also learned the process of communication if several teams are working in a project. Importance of communication among teams is also realized by us.

As the project aims at improvement of transportation infrastructure and important road networks in Western Australia, the constructions are being undertaken in large Ares. However total construction are is   divided into three different zones-Western, southern and Northern area. As   five private organizations are   responsible for completing construction works, different project managers are appointed for each zone. According to Smith et al. (2013) collaboration among teams is important to complete a project successfully. However teams of each zone communicate regularly to collaborate with each other.

SI

Agenda  for communication

Structure

Time of communication

Method of communication/medium

1

Planning  for  project

Direct communication  between both members

At start of project and whenever required

Meeting/ face  to face communication

2

Developing resource  strategies

Direct communication  between both members

After development of design  and whenever required

Meeting/ face  to face communication

3

Discussion on current  work status

Reporting to team leader

After completion of each milestone

E-mail/communication over  phone

4

Identification of issues

Direct communication  between both members

Every week and whenever required

Meeting/ face  to face communication

 

                                                                                Table 4: Communication plan of our team

According to Kenley (2014) communication among teams enhances their efficiency.  In case of large project several teams work together. Communication among these teams is important to avoid interruption in project works. However Lingard (2010) opines that structure of communication varies according to the need and nature of communication. On other hand, Morris (2013) opined that scheduling of communication is important for increasing efficiency of the process.

 Table describes the communication plan used by our team. Before commence met of the project we scheduled the meetings. Apart from scheduled meetings we also communicated whenever required. In our project both the member of team communicated several times for completing our tasks. We used both push and pull methods for communication. The medium of communication also varied according to the purpose.

Milestones of the Project

Figure 1: WBS fir Gateway WA

According to Landin, (2011), development of WBS is important for identifying scopes of a project.  However the complexity of WBS increases with the increases in size of projects. As large project    comprises of several small tasks, creation of WBS ensures that the whole project is executed efficiently (Lingard, 2010). In this current project 3 tiered WBS is developed to identify each task. Development of WBS not only enabled us to identify the deliverables, but it also benefited us to understand priority of each task. The tasks related with selection of constructors, fund raining, fund allocation, designing and staffing are described. However successful completion of these tasks will lead to completion of other tasks such as project planning, construction works and alliance formation. These tasks are described in second tier of WBS. Completion of tasks mentioned in second tire will lead to successful completion of Gateway WA project.

Conclusion:

Analysis of the Gateway WA reflects the difficulties which can be faced by infrastructure development project. As the constructions are being undertaken at busy road networks, difficulties may be faced while achieving milestones. Analysis on the progress in this project indicates that all tasks can expect to be completed within time.  Although   large number of stakeholders is involved with this project, no legal issue has been raised till date. However, chances of raising such issues are not eliminated completely. Although the constructors are capable to complete their tasks efficiently, project can be restricted from being completed within estimated time if any issue raises reading quality of construction.

References

Aecom.com, (2015). About – AECOM – A global provider of architecture, design, engineering, and construction services. [online] Available at: https://www.aecom.com/About [Accessed 11 Mar. 2015].

Gatewaywa.com.au, (2015). Funding & delivery » Gateway WA. [online] Available at: https://gatewaywa.com.au/about-the-project/funding-and-delivery/ [Accessed 11 Mar. 2015].

Gatewaywa.com.au, (2015). Project scope » Gateway WA. [online] Available at: https://gatewaywa.com.au/about-the-project/project-scope/ [Accessed 11 Mar. 2015].

Georgiou.com.au, (2015). Georgiou Group – About Us. [online] Available at: https://www.georgiou.com.au/about-us.html [Accessed 11 Mar. 2015].

Get The Bigger Picture, (2015). Gateway WA. [online] Available at: https://getthebiggerpicture.wa.gov.au/gateway-wa/ [Accessed 10 Mar. 2015].

Ghd.com, (2015). History. [online] Available at: https://www.ghd.com/global/about-us/history/ [Accessed 11 Mar. 2015].

Journal, P. (2013). Agile Project Management. Hoboken: Wiley.

Karrbom Gustavsson, T. and Gohary, H. (2012). Boundary action in construction projects: new collaborative project practices. International Journal of Managing Projects in Business, 5(3), pp.364-376.

Kenley, R. (2012). Managing Change in Construction Projects: A Knowledge-based Approach. Construction Management and Economics, 30(2), pp.179-180.

Kenley, R. (2014). Productivity improvement in the construction process. Construction Management and Economics, 32(6), pp.489-494.

Kloppenborg, T. (2012). Contemporary project management. Mason, Ohio: South-Western Cengage Learning.

Landin, A. (2011). Construction Stakeholder Management. Construction Management and Economics, 29(1), pp.107-107.

Lau, E. and Rowlinson, S. (2011). The implications of trust in relationships in managing construction projects. International Journal of Managing Projects in Business, 4(4), pp.633-659.

Leighton Contractors, (2015). About us. [online] Available at: https://www.leightoncontractors.com.au/about-us/ [Accessed 11 Mar. 2015].

Leighton Contractors, (2015). Gateway WA. [online] Available at: https://www.leightoncontractors.com.au/projects/gateway-wa-perth-airport-and-freight-access-project/ [Accessed 10 Mar. 2015].

Lingard, H. (2010). Construction Safety Management. Construction Management and Economics, 28(2), pp.213-214.

mainroads.wa.gov.au, (2015). TRAFFIC SWITCH SUCCESS – Horrie Miller Drive & Tonkin Highway. [online] Available at: https://www.mainroads.wa.gov.au/Documents/Gateway%20WA%20Project%20Newsletter%20-%20June%202014.RCN-D14%5E23491194.PDF [Accessed 10 Mar. 2015].

Mediastatements.wa.gov.au, (2015). Joint Media Statement – Gateway WA passes the halfway mark. [online] Available at: https://www.mediastatements.wa.gov.au/pages/StatementDetails.aspx?listName=StatementsBarnett&StatId=9015 [Accessed 10 Mar. 2015].

Morris, P. (2013). Reconstructing project management. Chichester, England: Wiley-Blackwell.

Smith, N., Merna, T. and Jobling, P. (2013). Managing Risk in Construction Projects. Hoboken: Wiley.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy