Problem Set #11

Please, address each of the questions below, in 100-150 words (per question). Include any relevant examples and links to your sources.  

1. 1.  Define the concept of sensitivity analysis, in your own words.

2. 2.  What do we mean by a project’s incremental cash flow? 

3. 3. What are some best practices with regards to risk analysis?

Cash Flow Estimation and Risk Analysis

CHAPTER 11

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Topics
Estimating cash flows:
Relevant cash flows
Working capital treatment
Risk analysis:
Sensitivity analysis
Scenario analysis
Simulation analysis
Real options

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

The Big Picture:
Project Risk Analysis

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Proposed Project Data (1 of 2)
$200,000 cost + $10,000 shipping + $30,000 installation.
Economic life = 4 years.
Salvage value = $25,000.
MACRS 3-year class.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Proposed Project Data (2 of 2)
Annual unit sales = 1,000.
Unit sales price = $200.
Unit costs = $100.
Net working capital:
NWCt = 12%(Salest+1)
Tax rate = 25%.
Project cost of capital = 10%.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Incremental Cash Flow for a Project
Project’s incremental cash flow is:
Corporate cash flow with the project
Minus
Corporate cash flow without the project.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Treatment of Financing Costs
Should you subtract interest expense or dividends when calculating CF?
NO.
We discount project cash flows with a cost of capital that is the rate of return required by all investors (not just debtholders or stockholders), and so we should discount the total amount of cash flow available to all investors.
They are part of the costs of capital. If we subtracted them from cash flows, we would be double counting capital costs.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Sunk Costs
Suppose $100,000 had been spent last year to improve the production line site. Should this cost be included in the analysis?
NO. This is a sunk cost. Focus on incremental investment and operating cash flows.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Incremental Costs
Suppose the plant space could be leased out for $25,000 a year. Would this affect the analysis?
Yes. Accepting the project means we will not receive the $25,000. This is an opportunity cost and it should be charged to the project.
A.T. opportunity cost = $25,000 (1 – T) = $15,000 annual cost.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Externalities
If the new product line would decrease sales of the firm’s other products by $50,000 per year, would this affect the analysis?
Yes. The effects on the other projects’ CFs are “externalities.”
Net CF loss per year on other lines would be a cost to this project.
Externalities will be positive if new projects are complements to existing assets, negative if substitutes.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is an asset’s depreciable basis?
Basis = Cost
+ Shipping
+ Installation
$240,000

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Annual Depreciation Expense
Basis = $240,000
Year Depr.
Rate Depr. =
Basis (Rate) Remaining
book value
Year 1 0.3333 $79,992 $160,008
Year 2 0.4445 $106,680 $53,328
Year 3 0.1481 $35,544 $17,784
Year 4 0.0741 $17,784 $0

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Annual Sales and Costs
  Year 1 Year 2 Year 3 Year 4
Units 1,000 1,000 1,000 1,000
Unit price $200 $206 $212.18 $218.55
Unit cost $100 $103 $106.09 $109.27
Sales $200,000 $206,000 $212,180 $218,545
Costs $100,000 $103,000 $106,090 $109,273

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Why is it important to include inflation when estimating cash flows?
Nominal r > real r. The cost of capital, r, includes a premium for inflation.
Nominal CF > real CF. This is because nominal cash flows incorporate inflation.
If you discount real CF with the higher nominal r, then your NPV estimate is too low.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Inflation (Continued)
Nominal CF should be discounted with nominal r, and real CF should be discounted with real r.
It is more realistic to find the nominal CF (i.e., increase cash flow estimates with inflation) than it is to reduce the nominal r to a real r.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Net Operating Profit After
Taxes (NOPAT): Years 1 and 2
  Year 1 Year 2
Sales $200,000 $206,000
Costs $100,000 $103,000
Depreciation $79,992 $106,680
EBIT $20,008 -$3,680
Taxes (25%) $5,002 -$920
NOPAT $15,006 -$2,760

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Net Operating Profit After
Taxes (NOPAT): Years 3 and 4
  Year 3 Year 4
Sales $212,180.0 $218,545.4
−Costs $106,090.0 $109,272.7
−Depreciation $35,544.0 $17,784.0
EBIT $70,546.0 $91,488.7
−Taxes (25%) $17,636.5 $22,872.2
NOPAT $52,909.5 $68,616.5

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Operating Cash Flows =
NOPAT + Depreciation
  NOPAT + Depr. = Op. CF
Year 1 $15,006.0 $79,992.0 $94,998.0
Year 2 -$2,760.0 $106,680.0 $103,920.0
Year 3 $52,909.5 $35,544.0 $88,453.5
Year 4 $68,616.5 $17,784.0 $86,400.5

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Cash Flows Due to Investments in Net
Working Capital (NWC)
Sales NWC
(% of sales) CF Due to
Investment
in NWC
Year 0    $24,000 -$24,000
Year 1 $200,000 $24,720 -$720
Year 2 $206,000 $25,462 -$742
Year 3 $212,180 $26,225 -$763
Year 4 $218,545 $0 $26,225

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

After-Tax Salvage Cash Flow at t = 4
(1) Salvage value $25,000
(2) Book value $0
(3) Gain or loss: (1) − (2) $25,000
(4)Tax on gain or loss $6,250
(5) After-tax salvage
CF: (1) − (4) $18,750

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What if you terminate a project
before the asset is fully depreciated?
Basis = Original basis – Accum. deprec.
Taxes are based on difference between sales price and tax basis.
Cash flow
from sale = Sale
proceeds – Taxes
paid

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Example: If Sold After 3
Years for $25 ($ thousands)
Original basis = $240.
After 3 years, basis = $17.8 remaining.
Sales price = $25.
Gain or loss = $25 – $17.8 = $7.2.
Tax on sale = 0.25($7.2) = $1.80.
Cash flow = Sales price – taxes
Cash flow = $25 – $1.80 = $23.2.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Example: If Sold After 3
Years for $10 ($ thousands)
Original basis = $240.
After 3 years, basis = $17.8 remaining.
Sales price = $10.
Gain or loss = $10 – $17.8 = -$7.8.
Tax on sale = 0.25(-$7.8) = -$1.95.
Cash flow = sales price – taxes paid on sale
Cash flow = $10 – (-$1.95) = $11.95.
Sale at a loss provides a tax credit, so cash flow is larger than sales price!

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Project Cash Flows for
Year 0 through Year 2
   Year 0   Year 1   Year 2 
Initial CF −$240,000    
Op. CF   $94,998 $103,920
NOWC CF −$24,000 −$720 −$742
Salvage CF                                       
Project CF −$264,000 $94,278 $103,178

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Net Cash Flows for
Year 3 and Year 4
   Year 3   Year 4 
Initial CF    
Op. CF $88,453.5 $86,400.5
NOWC CF -$763.0 $26,225.0
Salvage CF              $18,750.0
Project CF $87,690.5 $131,375.5

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Project Net CFs Time Line
Enter CFs in CFLO register and I/YR = 10.
NPV = $62,593.
IRR = 20.1%.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is the project’s MIRR?

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Calculator Solution
Enter positive CFs in CFLO. Enter I/YR = 10. Solve for NPV = 326,592.77.
Now use TVM keys: PV = -326,592.77,
N = 4, I/YR = 10; PMT = 0; Solve for FV = 478,164.47. (This is TV of inflows)
Use TVM keys: N = 4; FV = 478,164.47;
PV = -264,000; PMT= 0; Solve for I/YR = 16.0%.
MIRR = 16.0%.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Profitability Index (PI)
PI = PV of future CF / Initial CF
PI = $326,592.77/$264,000
PI = 1.24.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is the project’s payback?
($ thousands)
Cumulative:
−264 −170 −67 21 152
Payback = 2 + $67/$88 = 2.8 years.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is the project’s discounted
payback? ($ thousands)
Payback = 3 + $27/$90 = 3.3 years.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What does “risk” mean in
capital budgeting?
Uncertainty about a project’s future profitability.
Measured by σNPV, σIRR, beta.
Will taking on the project increase the firm’s and stockholders’ risk?

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Is risk analysis based on historical data or subjective judgment?
Can sometimes use historical data, but generally cannot.
So risk analysis in capital budgeting is usually based on subjective judgments.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What three types of risk are relevant in
capital budgeting?
Stand-alone risk
Corporate risk
Market (or beta) risk

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Stand-Alone Risk
The project’s risk if it were the firm’s only asset and there were no shareholders.
Ignores both firm and shareholder diversification.
Measured by the σ or CV of NPV, IRR, or MIRR.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Probability Density

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Corporate Risk
Reflects the project’s effect on corporate earnings stability.
Considers firm’s other assets (diversification within firm).
Depends on project’s σ, and its correlation, ρ, with returns on firm’s other assets.
Measured by the project’s corporate beta.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Project X is negatively correlated to firm’s other assets, so has big diversification benefits

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Market Risk
Reflects the project’s effect on a well-diversified stock portfolio.
Takes account of stockholders’ other assets.
Depends on project’s σ and correlation with the stock market.
Measured by the project’s market beta.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

How is each type of risk used?
(1 of 2)
Market risk is theoretically best in most situations.
However, creditors, customers, suppliers, and employees are more affected by corporate risk.
Therefore, corporate risk is also relevant.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

How is each type of risk used?
(2 of 2)
Stand-alone risk is easiest to measure, more intuitive.
Core projects are highly correlated with other assets, so stand-alone risk generally reflects corporate risk.
If the project is highly correlated with the economy, stand-alone risk also reflects market risk.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is sensitivity analysis?
Shows how changes in a variable such as unit sales affect NPV or IRR.
Each variable is fixed except one. Change this one variable to see the effect on NPV or IRR.
Answers “what if” questions, e.g. “What if sales decline by 30%?”

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Sensitivity Analysis: NPV for Input
Deviations from Base Case
Dev.
From Base NPV: Unit Cost Dev. NPV: Unit Sales Dev. NPV:
Salvage Dev.
-30% $136,927 -$9,363 $58,751
-15% $99,760 $26,615 $60,672
  0% $62,593 $62,593 $62,593
15% $25,426 $98,571 $64,514
30% -$11,742 $134,548 $66,435

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Sensitivity Graph: NPV for Input
Deviations from Base Case

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Results of Sensitivity Analysis
Steeper sensitivity lines show greater risk. Small changes result in large declines in NPV.
The cost line per unit line is steepest.
Unit sales line is also steep, but not as steep as the cost per unit line.
Salvage line is flat.
Managers should focus on costs and sales demand.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What are the weaknesses of
sensitivity analysis?
Does not reflect diversification.
Says nothing about the likelihood of change in a variable, i.e. a steep sales line is not a problem if sales won’t fall.
Ignores relationships among variables.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Why is sensitivity analysis useful?
Gives some idea of stand-alone risk.
Identifies dangerous variables.
Gives some breakeven information.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is scenario analysis?
Examines several possible situations, usually worst case, most likely case, and best case.
Provides a range of possible outcomes.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Best scenario: 1,200 units @ $240
Worst scenario: 800 units @ $160
Scenario Prob. Unit Sales Unit Price NPV
Best Case 25% 1,200 $240 $227,595
Base Case 50% 1,000 $200 $62,593
Worst Case 25% 800 $160 -$63,399

Expected NPV = $72,345
Standard Deviation = 103,343
Coefficient of Var. = Std Dev / Exp. NPV = 1.43

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Are there any problems with
scenario analysis?
Only considers a few possible out-comes.
Assumes that inputs are perfectly correlated—all “bad” values occur together and all “good” values occur together.
Focuses on stand-alone risk, although subjective adjustments can be made.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is a simulation analysis?
(1 of 2)
A computerized version of scenario analysis that uses continuous probability distributions.
Computer selects values for each variable based on given probability distributions.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is a simulation analysis?
(2 of 2)
NPV and IRR are calculated.
Process is repeated many times (1,000 or more).
End result: Probability distribution of NPV and IRR based on sample of simulated values.
Generally shown graphically.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Simulation Example Assumptions
Normal distribution for unit sales:
Mean = 1,000
Standard deviation = 200
Normal distribution for unit price:
Mean = $200
Standard deviation = $30

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Simulation Process
Pick a random variable for unit sales and sale price.
Substitute these values in the spreadsheet and calculate NPV.
Repeat the process many times, saving the input variables (units and price) and the output (NPV).

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Simulation Results for 2,000 trials.
(See Ch11 Mini Case.xlsx, worksheet Monte Carlo Simulation for a simulation with 100 iterations.)
    Price Units NPV
Mean $199 $999 $60,641
Std deviation 29 211 $100,354
Maximum $255 $1,486 $325,070
Minimum $119 $463 -$142,758
Median         $64,974

Probability of NPV > 0 3.8%
Coefficient of variation 1.65

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Interpreting the Results
Inputs are consistent with specified distributions.
Units: Mean = 1,252; St. Dev. = 199.
Price: Mean = $200; St. Dev. = $30.
Mean NPV = $88,808. Low probability of negative NPV (100% – 87% = 13%).

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Histogram of Results

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What are the advantages of simulation analysis?
Reflects the probability distributions of each input.
Shows range of NPVs, the expected NPV, σNPV, and CVNPV.
Gives an intuitive graph of the risk situation.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What are the disadvantages of simulation?
(1 of 2)
Difficult to specify probability distributions and correlations.
If inputs are bad, output will be bad:
“Garbage in, garbage out.”

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What are the disadvantages of simulation?
(2 of 2)
Sensitivity, scenario, and simulation analyses do not provide a decision rule. They do not indicate whether a project’s expected return is sufficient to compensate for its risk.
Sensitivity, scenario, and simulation analyses all ignore diversification. Thus they measure only stand-alone risk, which may not be the most relevant risk in capital budgeting.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

If the firm’s average project has a CV of 0.2 to 0.4, is this a high-risk project? What type of risk is being measured?
CV from scenarios = 1.43, CV from simulation = 1.65. Both are > 0.4, this project has high risk.
CV measures a project’s stand-alone risk.
High stand-alone risk usually indicates high corporate and market risks.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

With a 3% risk adjustment, should our project be accepted?
Project r = 10% + 3% = 13%.
That’s 30% above base r.
NPV = $41,584.
Project remains acceptable after accounting for differential (higher) risk.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Should subjective risk factors be considered?
Yes. A numerical analysis may not capture all of the risk factors inherent in the project.
For example, if the project has the potential for bringing on harmful lawsuits, then it might be riskier than a standard analysis would indicate.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What is a real option?
Real options exist when managers can influence the size and risk of a project’s cash flows by taking different actions during the project’s life in response to changing market conditions.
Alert managers always look for real options in projects.
Smarter managers try to create real options.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What are some types of real options?
(1 of 2)
Investment timing options
Growth options
Expansion of existing product line
New products
New geographic markets

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Types of real options (Continued)
(2 of 2)
Abandonment options
Contraction
Temporary suspension
Flexibility options

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Bonus Depreciation in the 2017
Tax Cuts and Job Act (TCJA)
The TCJA has provisions for bonus depreciation.
Allows a company to take additional depreciation in the year that an asset is put in service.
Only applies to 2018-2026.

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Bonus Depreciation Rates for First Year that Assets Are Placed in Service
Year 2018 2019 2020 2021 2022
Rate 100% 100% 100% 100% 100%
Year 2023 2024 2025 2026 2027
Rate 80% 60% 40% 20% 0%

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Example 1: $100,000 asset in the 3-year class
put in service in 2020
    2020 2021 2022 2023
Initial basis $100,000            
Bonus % depr. 100%            
Bonus depr. $100,000            
MACRS basis: $0            
MACRS % depr. 33.33% 44.45% 14.81% 7.41%
MACRS depr. $0 $0 $0 $0
Total depr. $100,000 $0 $0 $0

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

Example 2: $100,000 asset in the 3-year class
put in service in 2023
    2020 2021 2022 2023
Initial basis $100,000            
Bonus % depr. 80%            
Bonus depr. $80,000            
MACRS basis: $20,000            
MACRS % depr. 33.33% 44.45% 14.81% 7.41%
MACRS depr. $6,666 $8,890 $2,962 $1,482
Total depr. $86,666 $8,890 $2,962 $1,482

© 2020 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy