Aims/Objectives Of The Project

Investors

Advantages Of The Project

Development Team

Results To Be Expected

Work Breakdown Structure

Milestones

Management Of Risks

Quality criteria

Cost estimation

Conclusion

References

A proper network infrastructure is extremely significant due to it being highly reliable as well as tough. The pharmaceutical company has decided to upgrade/modify its present network foundation. As a result of which, there is a need of up gradation of the network structure which will be done by changing the present hardware, new workstations, networks and services. This needs to be done in such a way that it supports both the existing demands and out future expansion plans of the company. In agreement, the plan for the project has been enclosed. It includes all details of the network structure, including the criteria’s of success that is required for the achievement of goals. As an add-on, the plan has been devised in such a way that no disruption of the present network is done while the upgrading of the network is taking place. So, the collaboration has to be done with a set of company resources, which have done work on such projects. While the upgrading is taking place, one important fact should be taken care of – there should be minimum investment from company’s side while the returns should be at a maximum level.

The main goals of the project are as follows-

  • The architecture of the network should be improved so that it allows a constant and the incessant flow of information
  • Security of data access for the user’s needs to be improved
  • Facilitation of day-to-day to operations needs to be made easier
  • The integrity of the company data needs to be maintained
  • The employees of the company need a boost in their confidence level

The interested parties of the project are-

  • Sponsors of the projects
  • Hardware retailer
  • Human resources
  • Foundation retailer

Some of the key benefits that the project will enjoy are –

  • Involvement of the customers to be increased
  • Network communications to be increased
  • Theft of data to be decreased
  • All students are allowed fair usage
  • The upgrading is aimed at the elimination of all loopholes and errors that are present within the activity system and thus, create an error free system that would help with the goal of expansion.

Industrial team

  • Analyst of the network
  • Operational engineer
  • Network Engineer

Nonindustrial team

  • Manager of functionality
  • Enrollment to increase
  • Introduction towards bigger opportunities
  • Introduction towards diversified areas of studies

Preliminary Approximation Of Costs

  • Hardware/system – $200
  • Network cable/meter – $20
  • Software
  • Manager of the project – $90/hour
  • Analyst of the network – $75/hour
  • Implementation Engineer – $70/hour
  • Network Engineer – $60/hour
  • Functional Manager of Human Resources – $80/hour
  • Estimated entire cost of project – $122,800

WBS

Task Name

1

Network Upgrade

1.1

   Plan

1.1.1

      Prepare project plan

1.1.1.1

         Analyze requirements

1.1.1.2

         Perform feasibility study

1.1.1.3

         Get sign-offs on deliverables

1.1.2

      Take backup

1.1.2.1

         Identify backup location

1.1.2.2

         Perform backup operation

1.2

   Analyze & Design

1.2.1

      Hardware sizing

1.2.1.1

         Market research for best configuration of machines

1.2.1.2

         Finalize detailed configuration of network

1.2.1.3

         Prepare bill

1.2.1.4

         Sign-off

1.2.2

      Finalize new furniture

1.2.3

      Purchase furniture

1.2.4

      Place furniture

1.2.5

      Vendor selection

1.2.5.1

         Raise tender for workstation procurement

1.2.5.2

         Prepare vendor selection criteria

1.2.5.3

         Identify vendor for workstation purchase

1.2.5.4

         Configuration & Setup

1.3

   Purchase & Store

1.3.1

      Perform quality test on selected workstations

1.3.2

      Store machines in warehouse

1.3.3

      Install

1.3.3.1

         Identify locations of machine

1.3.3.2

         Install the hardware on the identified machines

1.3.3.3

         Identify and install network server

1.3.3.4

         Locate router

1.3.3.5

         Connect machines

1.3.3.6

         Configure workstations for internet connectivity

1.3.3.7

         Update software on machines

1.3.3.8

         Test software updates

1.4

   Testing

1.4.1

      Test each machine

1.4.2

      Get signoffs

1.4.3

      Network testing

1.4.3.1

         Put the machine in the network and test

1.4.3.2

         Get signoffs

1.4.4

      Data restore

  • Preparation of project plan
  • Hardware sizing
  • Vendor selection
  • Backup
  • Raise invoice
  • Installation
  • Machine test
  • Network testing

Name of Risk

Explanation

Level of Risk

Influence

Process of Contingency/Mitigation

Job Description lacking details

Set of skills is quite vague

Low

Medium

Have an expert of the industry to review it

Allocation of resources is insufficient

Minimum limit of resources is not achieved

Low

Medium

Resources of other tasks are to be assigned here

Disapproval of client

Discrepancy between the point of view of client and project

Medium

High

Personal meetings with clients to be arranged

Client Requirements are improperly projected

Discrepancy between the point of view of client and project

Medium

High

Industry expert to review the problem

Network analyst missing

Analyst quit or on leave

Low

High

Another analyst to be hired

Documentation loss

Failure of Hard Disk Drive

Low

High

Data recovery to be done with the help of IT tools

Increase in the license fees of design tools

Discount season has ended

Low

Low

Alternate freeware tools to be sought after

Absence of Implementation engineer

Engineer quit or on leave

Low

High

-Another engineer to be hired

-Implementation engineer to be hired on a contract

-Other resources to be reassigned

Absence of Network Engineer

Engineer quit or on leave

Low

High

-Another engineer to be hired

-Implementation engineer to be hired on a contract

-Other resources to be reassigned

Standard configuration of network is lacking

Proper documentation is lacking

Low

Low

Industry expert to review the problem

Software cost is increased

License fees are increased

High

Low

Alternate freeware tools to be sought after

User disapproval

User acceptance testing faces hiccups

High

High

Personal meetings with clients to be arranged

User reviews are facing delays

Reviews are not presented on schedule

Low

High

Notifications are to be sent

A set of measurable values which are associated with quality of the product is typically referred to as product’s quality metrics. Similarly, a software’s or a system’s quality metrics could be used to determine the extent to which the system or the software meets the requirements of the business. The usage of quality metrics raises objectivity of evaluation of the product quality. The human evalution of quality is subjective therefore it’s a possible source of disagreement between the system provider and the users. Thus the measurement of these qualities should not be only prepared at the end of project but more importantly during the project’s execution.

Typically, a system’s metrics are measured in the following terms:

  • Reliability: The total amount of time the system is operational. It’s measured in percentage for instance 23 out of 24 hours i.e., 100 x 23/24.
  • Recoverability: The total amount of time the system uses to recover from a failure. This could measured in total duration it takes for the system to spring back online for instance 30 minutes to reeinitialize the system.
  • User friendliness: The amount of complications involved with the system as a setup, it’s usage and maintenance. It could be simply measured in say, the amount of time a new user takes to get accustom to the system.
  • On-Time: Another key system metric is the timed delivery of the entire project. This measurement of the project being on time is particularly important ot the management as well as the stakenholders each day by which the project goes beyond it’s scheduled delivery and funds. A key metric for this is to ensure that the entire prpoject as per terms of project management is meeting it’s initial goal timings.
  • Within Budget: All projects in IT cost money to develop, evaluate and deliver. It is therefore critical for the project managers to manage budget metrics by continously monitoring and reviewing the on-going project spending. This simply could be done by keeping a track of the projected expenditure prepared during the drafting of the plan and the actual amount being spend on the project at the given time. This thus will give a quick glance to the project manager whethere the project’s spending is on par, above or below the budget. If it’s on par or under the budget, then chances are everything is going well, however when it goes above the budget, then arrangements for additional funds has to be made. This would then either be secured by way of loans, credit from promoters etc.
  • Deliverables Tracking: Another key criteria is deliverable tracking. The main goal of starting a new IT project is to deliver new enhancements or new functionalities to the current environment. Therefore a project management metric within the IT projects is to make sure that the project deliverables would be completed by date and within it’s proposed budget. The key metric here for tracking the deliverables is to review the total progression of the tasks corresponding to delivery milestones and doing the necessary if they do not meet the required expectations.

The time-phased budgeting is the core of the cost estimation. The time-phased budgeting technique does the job of integrating the schedule of the project and also, the budget of the project. This method acts as the stepping-stone towards making the budgetary. There is no relation between budget and schedule of a project until the two are merged together. Once time-phased budgeting is done, the manager of the project gains the added capacity to further point out the time at which the occurrences of certain expenditures take place. The outflow of cash is more accurately depicted which can result in the appropriate planning being undertaken.

Activity

Estimate Date

Cash Inflow

Cash Outflow

Balance

Preparation of project plan

Thu 2/5/15

35000

2160

32840

Hardware sizing

Tue 2/17/15

4560

28280

Vendor selection

Thu 2/19/15

6100

22180

Backup

Fri 2/6/15

600

21580

Raise invoice

Thu 2/19/15

7400

14180

Installation

Mon 8/25/14

2440

11740

Machine test

Thu 9/25/14

3960

7780

Network testing

Fri 10/3/14

920

6860

Conclusion

The principles of PMBoK have been respected while the upgrading of the company’s IT infrastructure is being done and on the basis of this, the manager of the project is able to determine the requirements and exclusions that are needed to be done in the project. At the time of the up gradation, this might affect the functionality of the other departments and thus time, resources and budget are of critical importance.

References

Gulla, J. (2012, Feb). Seven Reasons IT Projects Fail.

Organizing for Project Management. (n.d.).

Duncan, W.R. (n.d) A guide to Project Management Body of Knowledge.

Hamilton, G. (n.d.). Risk management and project management go hand in hand. 

HubPages. (n.d.). Project Management Time & Cost Estimation Techniques: An Overview.

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy