Wk 5 – Apply: Signature Assignment: Project Rollout, Post-Mortem, and Wrap-Up

 This will all be based on Lowkey Inc Project plan that is attached.

For this assignment, you will create an implementation project plan, which outlines the steps involved in implementing your project. This document is sometimes called a work-back schedule because you begin with the date that your project needs to go live, and then work back from there to determine what needs to be done when.

Don't use plagiarized sources. Get Your Custom Essay on
Wk 5 – Apply: Signature Assignment: Project Rollout, Post-Mortem, and Wrap-Up
Just from $13/Page
Order Essay

You will also conduct a post-mortem on the work you have submitted to date. Post-mortem (from the Latin for “after death,” but referring to it in the context of business) is the analysis of a project’s process and results conducted by key project stakeholders after the project has been moved into production, which means it’s functionally complete. The goal of a post-mortem is to identify what went right and what went wrong post-implementation so that project managers can apply these lessons learned to future projects.

For this three-part assignment, you will:

  • Construct a work-back schedule that presents the steps involved in implementing your project.
  • Construct a post-mortem using the template on the work you have submitted to date in this course.
  • Create updated project documents based on the results of your post-mortem.

    Review the

    Project Implementation Plan Example

    .

    Create a project implementation plan for your project based on the example document. You may use Microsoft Word or other software to create your project implementation plan.

    Complete the

    Post-Mortem

    template based on your experiences with completing the course project over the last five weeks.

    Update the project documents you have submitted thus far in the course based on your completed post-mortem.

    Submit your project implementation plan, post-mortem, and updated project documents.

    BSA/425 v1.3

    Project Plan Draft

    BSA/425 v1.3

    Page 2 of 11

    Project Plan Draft

    Fill out each of the sections below with information relevant to your project. Be sure to include the company name associated with your project.

    Lowkey Inc

    Network Technology Recommendations

    20

    Network Technology Selection Criteria

    Selection Criteria Name

    Selection Criteria

    Description

    Selection Criteria Value (Weighting in Points)

    Wide Area Network

    This ty0pe of network connects computers within a long distance

    10

    Accessibility

    The system should be easily accessible to users

    20

    security

    The technology’s integrity should not be interfered with by hackers and malicious parties

    30

    Compatibility

    It should be compatible with all the information resources that the firm uses.

    20

    20

    20

    Network Technology Recommendation

    Recommended Network Technologies

    Description

    Benefits

    Aggregate SelectionCriteria Score

    Emails

    Promotes communication cross different parties

    Facilitates communication with customers

    40

    Firewalls

    This resource safeguards the firm’s network from unauthorized access and disruptions

    Prevents fraudulent activities

    Artificial Intelligence

    Enhances the efficiency of the network

    Integrates the services and key procedures, thus improving changes adopted

    Internetworking tools

    Promotes integrated communication to attain networking goals

    Increases the efficiency of communication

    Selection Criteria Name

    Selection Criteria Description

    Selection Criteria Value (Weighting in Points)

    20

    40

    20

    20

    Network Technology Vendor Selection Criteria

    Price

    The cost of purchasing the network infrastructures

    Quality

    The efficiency and effectiveness of the technologies in attaining their goals

    Proximity

    Physical distance from the firm

    After Sales Service

    The services provided by the firm following the purchase of the systems

    Aggregate SelectionCriteria Score

    30

    20

    Network Technology Recommended Vendors

    Vendor Name

    Vendor Strengths

    Vendor Weaknesses

    Products/Services Provided to Project

    Cisco

    Cost-efficient and responsive customer care

    Highly responsive

    Encryption can safeguard the network against interceptions

    50

    Alloys

    Fast network connectivity

    Network fluctuates

    They can offer heavy network

    Oracle

    Low cost

    Highly

    expensive

    Provides a repair and maintenance software

    Network Technology

    Deployment Challenge

    s

    Deployment Challenge

    Deployment Challenge Description

    Deployment of physical over logical controls

    Physical network appliances are linked using protocols while in logical networks, there is utilization of different traffics that are agnostic to physical

    Scalable deployments

    The networks should be both automatic and scalable

    High costs

    High deployment costs is a challenge

    Inaccessibility

    Insufficient accessibility approach is a major problem

    Technology Adoption Methods

    Method Name

    Method Description

    Parallel Approach

    The adoption occurs when the new system is introduced while the old one is still in use

    Phased

    Gradually replacing small parts of the old system with the new one until it is fully implemented

    Piloting

    Using a small group of users to test the new system before it is widely adopted

    Direct Adoption

    Implementing a new system radically

    Benefits

    Cost/Benefit

    Considerations

    Costs

    Considerations

    Increased efficiency

    Personnel

    Hiring the most qualified pool of IT professionals

    Flexibility

    Organizational expenses

    Training employees to adapt to the new technology

    Cost cutting

    Cost of tools

    Seek the vendors who provide cost-effective and quality hardware and software technologies

    Access and availability

    Maintenance costs

    Repair and maintenance must be done regularly

    Database System Recommendation

    Selection Criteria Name

    Selection Criteria Description

    Selection Criteria Value (Weighting in Points)

    30

    20

    20

    20

    Database System Selection Criteria

    Operational consideration

    Ability to manage failure recovery and maintain availability

    Security

    The database’s integrity should not be tampered with

    Development consideration

    The openness of the support options

    Commercial consideration

    Its potential commercial importance and benefits

    Description

    Benefits

    Aggregate SelectionCriteria Score

    40

    10

    40

    10

    Database System Recommendation

    Recommended Database System

    Relational database management system

    Comprises multiple tables of data with rows and columns that relate to each other

    These databases are more flexible

    Hierarchical database systems

    This model resembles a tree structure, with pre-defined relationships

    Requires users to pass hierarchies to access the required data, hence secure

    Network database systems

    Supports many to many relationships

    Can promote integration of systems

    Object-oriented database systems

    Information is represented as objects

    Supports different forms of programming

    Selection Criteria Name

    Selection Criteria Description

    Selection Criteria Value (Weighting in Points)

    30

    20

    Security

    10

    40

    Database System Vendor Selection Criteria

    Usability

    User friendliness and ease of use

    Visualization and reporting

    Ease of visually analyzing and displaying data and results

    Ability to be stored securely

    Functionality

    Ability to meet business requirements

    Vendor Name

    Vendor Strengths

    Vendor Weaknesses

    Products/Services Provided to Project

    Aggregate SelectionCriteria Score

    Oracle

    30

    30

    20

    20

    Database System Recommended Vendors

    Has syntax enhancements and performance improvements

    expensive

    Multitenancy, database in-memory, and database Sharding

    Microsoft

    Ease of use and high availability

    Challenges in seamlessly integrating high volumes of corporate data

    SQL Server

    IBM

    Can accommodate big data

    Expensive

    IDM DB2

    Knack

    Provides many tools for online databases

    It is highly customized

    Knack

    Deployment Challenge

    Deployment Challenge Description

    Database System Deployment Challenges

    Data security

    The organization may lack resources for securing its database

    Performance

    The database may have harsh performance criteria

    Resource utilization

    The database may not have the best hardware available to run on

    High availability

    In case the single server goes down, the firm’s operations are paralyzed

    Technology Adoption Methods

    Method Name

    Method Description

    Method Name

    Method Description

    Parallel Approach

    The adoption occurs when the new system is introduced while the old one is still in use

    Phased

    Gradually replacing small parts of the old system with the new one until it is fully implemented

    Piloting

    Using a small group of users to test the new system before it is widely adopted

    Direct Adoption

    Implementing a new system radically

    Cost/Benefit Considerations

    Benefits

    Costs

    Considerations

    Increased efficiency

    Personnel

    Hiring the most qualified pool of IT professionals

    Flexibility

    Organizational expenses

    Training employees to adapt to the new technology

    Cost cutting

    Cost of tools

    Seek the vendors who provide cost-effective and quality hardware and software technologies

    Access and availability

    Maintenance costs

    Repair and maintenance must be done regularly

    Software Application Recommendations

    Selection Criteria Name

    Selection Criteria Description

    Selection Criteria Value (Weighting in Points)

    40

    20

    20

    Security

    20

    Software Application Selection Criteria

    Suitability

    Ability to provide appropriate set of functions

    Accuracy

    Ability to provide the right or agreed results

    Interoperability

    Ability to interact with one or more specified systems

    Ability to provide mechanisms to prevent the accidental or deliberate interference with integrity

    Description

    Benefits

    Aggregate SelectionCriteria Score

    30

    30

    20

    20

    Software Application Recommendation

    Recommended Software Application

    ERP

    Integrated software for managing and coordinating all the business activities

    It provides real-time standardization and streamlining of business processes.

    Office production software

    Producing and compiling information, such as documents and reports

    Reduces and heaps of paperwork

    CRM

    Facilitates interactions with customers

    Can be used to analyze customer trends and preferences

    MIS

    Facilitates gathering, analyzing, and disseminated data for organizational operations

    Informs company decision-making

    Selection Criteria Name

    Selection Criteria Description

    Selection Criteria Value (Weighting in Points)

    20

    20

    20

    Security

    20

    Software Application Vendor Selection Criteria

    Rates

    The vendors should not be too expensive

    Main areas of expertise

    Relevance of the software to the business functions

    Certification

    Must have local and international certification

    Should have an information security plan

    Vendor Name

    Vendor Strengths

    Vendor Weaknesses

    Products/Services Provided to Project

    Aggregate SelectionCriteria Score

    Microsoft

    20

    IBM

    20

    Oracle

    30

    20

    Software Application Recommended Vendors

    Can customize to the business’s needs

    costly

    Microsoft Office

    They install and configure them for firms

    Scalability and integration challenges

    Sterling Order Management

    Portability

    Expensive

    Oracle CRM

    SAP

    Multiple database support

    Very complex to use

    SAP ERP

    Deployment Challenge

    Deployment Challenge Description

    Software Application Deployment Challenges

    Misaligned expectations

    Project teams and stakeholders may differ on the needs and requirements of the software

    Data integrity

    Lack of an effective strategy for securing data

    Insufficient training tools

    Employees maybe insufficiently prepared tom operate the software

    Testing problems

    Lack of a testing and maintenance tool

    Technology Adoption Methods

    Method Name

    Method Description

    Parallel Approach

    The adoption occurs when the new system is introduced while the old one is still in use

    Phased

    Gradually replacing small parts of the old system with the new one until it is fully implemented

    Piloting

    Using a small group of users to test the new system before it is widely adopted

    Direct Adoption

    Implementing a new system radically

    Cost/Benefit Considerations

    Benefits

    Costs

    Considerations

    Increased efficiency

    Personnel

    Hiring the most qualified pool of IT professionals

    Flexibility

    Organizational expenses

    Training employees to adapt to the new technology

    Cost cutting

    Cost of tools

    Seek the vendors who provide cost-effective and quality hardware and software technologies

    Access and availability

    Maintenance costs

    Repair and maintenance must be done regularly

    Cloud Services Recommendations

    Selection Criteria Name

    Selection Criteria Description

    Selection Criteria Value (Weighting in Points)

    30

    40

    10

    Data security

    20

    Cloud Services Selection Criteria

    Compliance with standards

    Compliance with government and professional regulations

    Service roadmap

    Current goals and objectives of the vendors

    Terms of service

    If they do not have tough terms and conditions

    Ability to secure the data

    Description

    Benefits

    Aggregate SelectionCriteria Score

    20

    20

    IBM

    40

    20

    Cloud Services Recommendation

    Recommended Cloud Services

    Amazon

    Provides additional services, such as storage and security

    Support users to integrate with business

    Google Cloud

    Can provide free packages

    Supports all organizational functions

    Fast response to customer enquiries

    Can provide platform as a service

    Adobe

    Ideal for supporting publishing and editing

    it is a creative cloud system

    Vendor Name

    Vendor Strengths

    Vendor Weaknesses

    Products/Services Provided to Project

    Aggregate SelectionCriteria Score

    Amazon

    Provides additional services, such as storage and security

    30

    Google Cloud

    Can provide free packages

    Google Cloud

    20

    IBM

    Fast response to customer enquiries

    Expensive

    30

    Adobe

    Ideal for supporting publishing and editing

    20

    Cloud Services Recommended Vendors

    Cannot be customized

    Amazon Cloud

    Slow responsiveness to customer inquiries

    IBM Cloud

    Only ideal for media and publishing

    Adobe

    Deployment Challenge

    Deployment Challenge Description

    Data security

    Cloud Services Deployment Challenges

    Increased incidences of hacking of cloud resources

    Performance issues

    Disruptions from vendors due to maintenance

    Availability problems

    Lack of availability of services when technical issues emerge

    Data safety

    Data may be affected when the computer systems are infected by viruses

    Technology Adoption Methods

    Method Name

    Method Description

    Parallel Approach

    The adoption occurs when the new system is introduced while the old one is still in use

    Phased

    Gradually replacing small parts of the old system with the new one until it is fully implemented

    Piloting

    Using a small group of users to test the new system before it is widely adopted

    Direct Adoption

    Implementing a new system radically

    Cost/Benefit Considerations

    Benefits

    Costs

    Considerations

    Increase in efficiency

    $4000

    Installing efficient and state-of-the art hardware and software resources to speed up business transactions

    Reduction in costs

    $3000

    Eliminating heaps of paperwork

    Hiring more staff

    $10000

    Individuals who will operate or control the cloud resources

    Purchasing more computer resources

    $5000

    Devices should be purchased to support the running of the cloud computing system

    Copyright 2020 by University of Phoenix. All rights reserved.

    Copyright 2020 by University of Phoenix. All rights reserved.

    3

    Project Supporting Research

    Narek Saribekyan

    BSA 425

    Professor Stephanie Benoit-Kurtz

    3/15/2021

    Week 3

    Project Supporting Research

    Executive Summary

    The advancements in information technology have radically transformed business operations and activities. Firms are increasingly embracing such technologies to gain competitive advantage over their rivals. Lowkey Inc, for example, recognizes the need to improve its business processes and operations. Therefore, it is launching a project to introduce information system resources such as database management tools, cloud computing technologies, customer relationship management, and enterprise relationship management.

    Purpose of the Project

    The purpose of the project is to use information technology as a tool to improve the organization’s business processes. To achieve this objective, the project team members will focus on introducing three key information systems to the firm: customer relationship management systems, cloud-based solutions, and network database. The company will introduce these systems and integrate them to enable it to perform tasks such as gathering, storing, processing, and reporting data from different sources to provide information that is required to manage the process of making informed decisions. The organization has witnessed a surge in its operational costs, delays, and faulty processes. Customers also complain that their orders are taking too long to process and deliver. Therefore, the company hopes to invest in information technologies to improve its operational efficiency by cutting operational costs, speeding up business transactions, and optimizing customer experience.

    Industry Background

    Lowkey, Inc. is one of the organizations that operates within the gaming industry.This industry can be described as an environment that is characterized by intense competition as more and more players and investors scramble for the market share. Indeed, the global video game sector has grown phenomenally in the last five years, to resemble the competitive and interactive movie industry. The COVID 19 pandemic has, for instance, fueled the sector to generate more profits than movies and the North American sports combined. The revenue is expected to increase by 20 percent to 179 billion dollars by 2021, according to a survey conducted by the IDC data. This pattern makes the sector a major money maker than the global movie and North American sports, which would generate more than 75 billion in 2020. The latter industries suffered from the cruelties of the pandemic, whereas the video game sector is still projected to see a double-digit growth in 2021 after high single-digit growth in the previous two years.

    Technology Trends

    The advancements in information technologies have revolutionized the industry in which the company operates. For instance, the key players are increasingly embracing cloud technologies to drive market growth. Recent developments of could technology has transformed the idea of gaming into a reality. In it, the servers, where all the games are stored, do all the computation tasks, which include game scene rendering, game logic processing video encoding, as well as video streaming. Many firms, such as Lowkey and Onlive are increasingly recognizing the significance of this computation technology in providing commercial cloud gaming services. Such technologies can support different user devices such as console, tablets, smartphones, as well as personal computers. Moreover, many companies are adopting CRM programs to enable them to better understand customer behavior, simplify marketing and customer engagement, and perform more efficacious customer acquisition and retention. These are enabling them to reduce churn, and offer better customer services.

    Project Approach

    The project will employ the agile approach to its initiation, design, and implementation. This approach stresses on the relationship and communality of system developers and human role that is reflected in the contracts, as opposed to the institutionalized processes and development tools (Berisha-Shaqiri, 2015). In the current agile practices, this takes the form of close team relationships, and encourages project team members to work in an environment where there is cohesion and collaboration. The purpose of this methodology is to continually turn out the tested working software (Srivastava et al., 2017). This means that the new releases are generated at regular intervals. On some approaches, the developers can release hourly or daily versions, but in most cases it is often bi-monthly. More importantly, this methodology encourages cooperation and collaboration between developers and the clients, thereby meeting their needs.

    Selected Vendors

    There are various vendors who have been selected to provide and implement the proposed services. They include Oracle, IBM, and Amazon Cloud. Oracle will be selected to provide CRM services for the organization. One benefit of selecting this company for such applications is that they provide additional services such as sales, marketing, and handling of human capital. Additionally, its customer relationship management system has many features, which the company requires such as contact management, tracking interactions, scheduling reminders, email marketing, pipeline monitoring, and reporting or analytics. It also includes a helpdesk, and a system for accommodating mobile access.

    IBM and Amazon will provide database and cloud computing services respectively. One benefit of using IBM for database system is that it provides relational database management system, which the organization can utilize to support the storing, analysis, retrieval, and analysis of data. This product is often expended with the support of object-oriented elements and non-relational structures with XML. Amazon, on the other hand, will provide the company with cloud computing services. The vendor’s services have evolved and improved significantly in the last five years. Currently, it offers different cloud solutions, which give businesses of all sizes a flexible IT environment that can further be adjusted to meet their changing needs.

    Alternative Approach

    The alternative method that will be employed to implement the proposed project is the system development life cycle approach. This approach offers a process-driven model of developing and implementing information technology projects (Arrey, 2019). According to the framework, the process of developing an effective information technology tool should include planning, analysis, design, development, implementation, integration, testing, and system maintenance. This approach is important as it will help to transform the idea of a project uinto0 a functional and completely operational structure.

    Impact Analysis

    System evaluation is an important step towardsexamining the overall success of a project. In this case,for example, the main evaluationmodelthat will be used is impact assessment. This method assesses the extent to which the outcomes and impacts to the project are in line. It does so by establishing the counterfactuals, which is what would have occurred in the absence of such a project. Thus, the impact assessment will seek to create a valid control group, for which a comparison will be made to examine the project success.

    Cost-Benefit Analysis

    The feasibility of the project will be determined by undertaking a cost-benefit analysis. This process will be attained by examining whether the benefits or advantages outweigh the project’s disadvantages or limitations. As such, the strengths and weaknesses of the project will be analyzed and a cost-benefit analysis conducted.

    Financial Analysis

    150000

    Activity

    Cost ($)

    1

    Planning and requirements analysis

    10000

    2

    System design

    100000

    3

    System development and identification of vendors

    150000

    4

    Implementation

    Total

    410,000

    Risk Analysis

    The risk analysis process will focus on assessing how the project outcomes and objectives may change owing to the impact of a risk event. In this regard, the project risk analysis will undertake by assessing the potential risks and ranking them in terms of their likelihood of occurrence. Hacking and computer fraud are some of the potential risks that might occur. Once the risks are determined, they will be analyzed to ensure that appropriate steps are taken to mitigate them.

    References

    Arrey, D. A. (2019). Exploring the integration of security into software development life cycle

    (SDLC) methodology (Doctoral dissertation, Colorado Technical University).

    Berisha-Shaqiri, A. (2015). Management information system and competitive

    advantage. Mediterranean Journal of Social Sciences, 6(1), 204.

    Srivastava, A., Bhardwaj, S., &Saraswat, S. (2017, May). SCRUM model for agile

    methodology. In 2017 International Conference on Computing, Communication and

    Automation (ICCCA) (pp. 864-869). IEEE.

    2

    The Rationale for Adding the Changes

    Narek Saribekyan

    BSA 425

    Professor Stephanie Benoit-Kurtz

    3/15/2021

    Week 3

    The Rationale for Adding the Changes

    The three changes that I have incorporated into the project plan primarily focus on the vendor selection criteria for database management systems. These changes include price, quality, and the vendor’s reputation. I believe that price is important because the goal of selecting a vendor should always be to get the optimal value of the product for the lowest price or cost possible. Additionally, it is important to be concerned about vendors who submit estimates that are far below others. In this respect, one may receive less than acceptable quality for the same product. Therefore, it is important to communicate the prospects to the full extent of the company’s needs so as to receive an accurate bid.

    Apart from price, I have also considered quality of the vendor’s product. To this end, the price does not matter if the product or service is of poor quality. Whenever necessary, it is important to ask the vendors to see the samples of the database product that they are selling to customers. This means that the vendor should be ready to provide substantial reasons to believe that the product that they are offering is not defective and demonstrate it to the target customers. Moreover, if the vendor fails to explain the basic steps of operating the system, then it is important to rethink the organization’s decisions before selecting them. Finally, the vendor’s integrity and reputation are important for database selection. This is because databases contain classified organizational data, which should only be managed by reputable parties. As such, it is important to conduct a due diligence on their ethical backgrounds and previous lawsuits that might have potentially affected their integrity or reputation. In light of the above, one should undertake a thorough background check, including searching news and complaints related to the vendor in order to identify possible issues that might affect the contract.

    What Will You Get?

    We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

    Premium Quality

    Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

    Experienced Writers

    Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

    On-Time Delivery

    Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

    24/7 Customer Support

    Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

    Complete Confidentiality

    Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

    Authentic Sources

    We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

    Moneyback Guarantee

    Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

    Order Tracking

    You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

    image

    Areas of Expertise

    Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

    Areas of Expertise

    Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

    image

    Trusted Partner of 9650+ Students for Writing

    From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

    Preferred Writer

    Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

    Grammar Check Report

    Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

    One Page Summary

    You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

    Plagiarism Report

    You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

    Free Features $66FREE

    • Most Qualified Writer $10FREE
    • Plagiarism Scan Report $10FREE
    • Unlimited Revisions $08FREE
    • Paper Formatting $05FREE
    • Cover Page $05FREE
    • Referencing & Bibliography $10FREE
    • Dedicated User Area $08FREE
    • 24/7 Order Tracking $05FREE
    • Periodic Email Alerts $05FREE
    image

    Our Services

    Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

    • On-time Delivery
    • 24/7 Order Tracking
    • Access to Authentic Sources
    Academic Writing

    We create perfect papers according to the guidelines.

    Professional Editing

    We seamlessly edit out errors from your papers.

    Thorough Proofreading

    We thoroughly read your final draft to identify errors.

    image

    Delegate Your Challenging Writing Tasks to Experienced Professionals

    Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

    Check Out Our Sample Work

    Dedication. Quality. Commitment. Punctuality

    Categories
    All samples
    Essay (any type)
    Essay (any type)
    The Value of a Nursing Degree
    Undergrad. (yrs 3-4)
    Nursing
    2
    View this sample

    It May Not Be Much, but It’s Honest Work!

    Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

    0+

    Happy Clients

    0+

    Words Written This Week

    0+

    Ongoing Orders

    0%

    Customer Satisfaction Rate
    image

    Process as Fine as Brewed Coffee

    We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

    See How We Helped 9000+ Students Achieve Success

    image

    We Analyze Your Problem and Offer Customized Writing

    We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

    • Clear elicitation of your requirements.
    • Customized writing as per your needs.

    We Mirror Your Guidelines to Deliver Quality Services

    We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

    • Proactive analysis of your writing.
    • Active communication to understand requirements.
    image
    image

    We Handle Your Writing Tasks to Ensure Excellent Grades

    We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

    • Thorough research and analysis for every order.
    • Deliverance of reliable writing service to improve your grades.
    Place an Order Start Chat Now
    image

    Order your essay today and save 30% with the discount code Happy