The TTP-4 – Project Resources and Costs

. The TTP-4 – Project Resources and Costs is due as shown in the schedule. The assignment instructions are attached. Use the weekly readings to understand the concepts and what is required for the assignment. You much Know about Microsoft Project please. I need it done with in 12 hours

References and Sources:

Don't use plagiarized sources. Get Your Custom Essay on
The TTP-4 – Project Resources and Costs
Just from $13/Page
Order Essay
  • Should use the textbook and at least 2 references from academically credible sources with APA formatted citation (in-text)
  • References list must be in APA format (single-spaced)
  • All entries in the References list must be used as in-text citations

Writing Quality:

  • Include an APA-format cover page
  • Cover page should include Project Deliverable number and title, i.e., “TEAM 7 Projecteers – ITP-2 – WBS with Durations ”

    January 2020

    Page 1 of 5

    Project Fields to Include in ITP Deliverables

    Contents

    • Tasks to include in ITP Deliverables

    Project Configuration Settings

    • ITP-1 – Project WBS with Durations

    TTP-3 – Project Schedule with Dependency Links

    • TTP-4 – Project Resources and Costs

    ITP-3 – Project Risk Assessment

    TTP-5 – Consolidated Project Management Plan

    TTP-6 – Project Execution, Tracking and Changes

    Tasks to Include in ITP Deliverables

    First, before we get to fields – Please make sure that your WBS (and .mpp file) include the following tasks
    as part of your WBS. Note that this these are necessary but far from sufficient. Many more tasks are
    needed. This also does not mean that a single task will necessarily suffice for each of these. Rather,
    include as many tasks as it takes to do the job, but please include at least the following kinds of tasks in
    addition to whatever else you were planning for your WBS:

    • Tasks regarding ordering, delivering, and receiving hardware

    • Tasks regarding ordering, delivering, and receiving software

    • Tasks regarding ordering, delivering, and receiving networking

    • Tasks regarding installing hardware

    • Tasks regarding installing software

    • Tasks regarding installing networking

    • Tasks regarding managing, controlling, and monitoring the project and the team

    • Project meetings

    To reiterate, there is a lot more to the WBS than this. However, you will find these tasks to be needed in
    later ITP deliverables. Omitting them would likely be detrimental for many assignments.

    January 2020

    Page 2 of 5

    Project Configuration Settings

    Project needs some configuring before you submit these assignments. Hint: This step will count

    towards your grade.

    NOTE: This is a one-time setup. If you follow the configuration steps for ITP -1, you do not need to

    configure Project for later assignments.

    Launch Project and open a Blank Project. Open Project Options and adjust your calendar options

    settings to look EXACTLY like this:

    Verify your scheduling options look EXACTLY like this

    Verify your calculation settings look EXACTLY like this

    January 2020

    Page 3 of 5

    ITP-1 – Project WBS with Durations

    Please ensure that your .mpp file includes at least the following fields (columns) visible in the

    left-hand table portion of the Gantt chart view or the Tracking Gantt view:

    • Indicators (white “i” in a solid blue circle, listed in the Columns list as “Indicators”) [a
    default field]

    • Task Mode

    • Name (i.e., task name) [a default field]

    • Duration [a default field]

    TTP-3 – Project Schedule with Dependency Links

    Before we get to TTP-3 fields, a note about the general structure of the TTP-3 schedule: The

    Gantt Chart and the Network Diagram should not look like waterfalls, wherein each task has

    only one predecessor and only one successor. That is not only unrealistic, but is problematic for

    most projects. There should be parallelism. This means that typical tasks should have multiple

    successors and/or predecessors.

    Please ensure that your .mpp file includes at least the following fields (columns) visible in the
    left-hand table portion of the Gantt chart view or the Tracking Gantt view:

    • All fields from ITP-1

    • Start date [a default field]

    • Finish date [a default field]

    • Predecessors [a default field]

    • Successors

    Additionally, please ensure that the Critical Tasks box in the Format tab is checked.

    TTP-4 – Project Resources and Costs

    Please ensure that your .mpp file includes at least the following fields (columns) visible in the

    left-hand table portion of the Gantt chart view or the Tracking Gantt view and also in the

    Resource Sheet view:

    • All fields from ITP-1 and TTP-3

    • Resource Name

    • Material

    • Type

    • Group

    • Standard Rate

    • Cost per Unit

    • Cost

    • Work

    January 2020

    Page 4 of 5

    ITP-3 – Project Risk Assessment

    Please ensure that your risk register spreadsheet file includes at least the following fields

    (columns):

    • WBS ID

    • Task Name or brief description

    • Task Level (see note in assignment instructions)

    • Risk Description

    • Risk Category (Risk Type)

    • Risk Probability

    • Risk Consequences (Impact)

    • Initial Risk Score (Probability * Impact)

    • Risk Handling Category

    • Risk Handling/Control Plan

    • Risk Owner (Risk Manager)

    Additional suggested fields:

    • Est. Cost of Mitigation

    • Remaining Probability after Mitigation

    • Remaining Consequences (Impact) after Handling

    • Final Risk Score

    • Current Risk Status

    • Notes and discussion

    TTP-5 – Consolidated Project Management Plan
    Please ensure that your .mpp file includes at least the following fields (columns) visible in the
    left-hand table portion of the Gantt chart view or the Tracking Gantt view:

    • All fields from ITP-3

    TTP-6 – Project Execution, Tracking and Changes
    Please ensure that your .mpp file includes at least the following fields (columns) visible in the

    left-hand table portion of the Tracking Gantt view:

    • All fields from TTP-5

    • Actual Start

    • Actual Finish

    • Actual Duration

    • Baseline Start

    • Baseline Finish

    • Baseline Duration

    January 2020

    Page 5 of 5

    On Resource Sheet view:

    • All fields from TTP-4

    • Baseline Cost

    Additional suggested fields:

    • Earned Value – EV (BCWP)

    • PV (BCWS)

    • AC (ACWP)

    • Schedule Variance (SV)

    • Cost Variance (CV)

    • Estimate at Completion (EAC)

    • Budget at Completion (BAC)

    • Schedule Performance Index (SPI)

    • Cost Performance Index (CPI)

    • Percent Complete

    TTP-4Project Resources and Costs (Team project)

    Please be sure to read the Team Contribution Assessment and Grading of Team Assignments and the
    Project Documentation Requirements sections of the ITP Master Document.

    Assignment for the TTP-4 Project Deliverables

    By now, your project team should have a well-fleshed out WBS in MS Project with a schedule and
    durations and dependencies. Start by reviewing your previous deliverable assignments and by looking at
    what the other teams have posted in the Shared Learning Environment Discussion for both the Project
    Charter and the Project Schedule with Dependency Links. Make sure to read and understand the Week 5
    readings, as they will help you be successful with this assignment.

    This assignment includes 3 Parts.

    Part 1. Adding Resources to the WBS in Microsoft Project

    In Microsoft Project, add resources to each sub-task (but not Summary Tasks) at each level of the WBS.
    When you finish assigning resources, go to the resource graph to see if any resource is over-allocated
    (working more than 8 hours a day on assigned tasks shows as a red bar). Try to resolve the over-
    allocations.

    Make sure that all the sub-tasks have at least one resource assigned. If team members work on different
    portions of this assignment, be sure to combine them so that the entire project and all its work will be
    covered.

    Part 2. Adding costs to the WBS in Microsoft Excel

    Replicate the WBS, including resource assignments, in Microsoft Excel. This is a method of cross-
    validating totals costs shown in Microsoft project. Assign costs to all resources, remembering to include
    equipment you might need (copiers, printers, carts to transport equipment), maybe facilities (such as a
    storage unit for staging equipment), and, of course the people who are doing the work. If you include a
    vendor/contractor on a contract or purchase order that has one price for the entire effort, you will
    include one contractor @ $xx,xxx.xx (contract price). Think about how you will address this contractor in
    the Resource Sheet. Remember that the contractor is not likely to charge by the hour. You must include
    everything it takes to do every task at every level.

    The spreadsheet must include a clear bottom line total of all project costs so that you and your
    stakeholders can tell whether your plan is within the project budget or not. Use Excel formulas to do the
    necessary math. You may want to determine subtotals by cost type (labor, supplies, equipment, etc.);
    and/or by person if a person is assigned to work on than one task. But you still must show the cost of
    each major task plus the total cost of the project.

    The Word document should include the sources of your costs. For example, if you used a Department of
    Labor category, the discussion should include why you used this source and the appropriate citations.

    Now return to Microsoft Project and enter all the resource costs. Compare the Excel cost totals to the

    Project cost totals. If possible, reconcile any differences. Don’t try to force-fit (add or subtract more

    costs) adjustments into Project. If you entered them according to the processes described in the Week 5

    readings, those numbers should be ok because Project’s scheduling engine calculates all cost totals. The

    first place to check would be the Excel formulas. The weekly reading document, How to Enter Resource

    Costs in Microsoft Project, also has troubleshooting tips on cost totals.

    Check the Project Fields to Include in ITP Deliverables document to ensure you have all the needed

    columns showing in the Gantt view(s) and Resource view(s).

    Part 3. Answers to Questions in Microsoft Word

    Include an APA format Cover Sheet and Executive Summary with appropriate changes in a Word
    document that answers the following questions:

    1. How did the team determine the appropriate resources? Were other similar projects used to
    help determine resources that might be needed?

    2. Was a salary website or the Department of Labor website used to help determine the hourly
    rate of the labor resources? If not, how were hourly rates determined?

    3. Were other credible sources used to help the team determine what non-labor resources might
    be required?

    4. Did the team revisit the project charter to ensure resources were consistent with the SCOPE of
    the project? This is particularly important in the case of non-project team resources. For
    example, if a server or telecom closet is to be built, do the resources include construction types
    of resources? And did the team consider appropriate mountings or furniture for the IT
    equipment in the bakery areas?

    5. Was some work was contracted out? Why or why not?

    6. What contractors or vendors might be involved in the project and what products or services
    would they provide?

    7. Were the totals by task in Excel and the MS Project (.mpp) file the same? Was the total cost of
    the project the same? If not, why not?

    Have one person on the team Submit the Microsoft Project (.mpp) file, the Excel file (.xlsx), and the

    Word file ( x) to your Assignment Folder.

    Approximate breakdown by areas include:

    o General: Structure, Format, Mechanics, Style (~2%)

    o Tasks (~15%)

    o Resources (~15%)

    o Non-labor costs (~35%)

    o Labor / human resources costs (~17%)

    o Vendor / contractor costs (~4%)

    o Roll up (~5%)

    o Other (~3%)

    o Questions and rationale (~4%)

    Rubrics and Grading for the TTP-4 Project Deliverable

    To earn 90-100% of the points available for this assignment –

    The TEAM WBS should have corrections made to durations and predecessors as a result of sharing and

    looking at fellow classmates’ MS Project team efforts and in response to comments from the instructor.

    Durations, predecessors and resources are assigned for all tasks. Resources include all people, facilities,

    supplies, materials, facilities, and contractors, etc. required to accomplish each sub-task. Anything that

    will be needed to accomplish the task is included as a resource for that task. The Resource Sheet View

    shows labor and non-labor. Non-labor resources are properly categorized as expendable material

    resources and supplies, or as non-expendable equipment and other costs. The Resources Graph shows

    no red bars for over-allocations. The accompanying Word document or text answers all questions,

    explaining how the team determined the appropriate resources, whether or not some work was

    contracted out and why, what vendors might be involved in the project and what products or services

    they would provide, and at least two academically credible resources plus the textbook are used in the

    text and included in a

    Reference page.

    The Excel worksheet should include all costs for expendable materials and supplies, non-expendable

    equipment, facilities, and contractors or vendors. All people assigned to do the work of the sub-tasks are

    identified, along with their labor rates, hours, and costs per person. Include everything it takes to do

    every task at every level. Make sure that there is a clear bottom line total of all project costs. Include

    costs for each lowest level task. Add them up for higher level roll-up summary tasks. Do not assess costs

    against such summary tasks individually except by adding up the costs of the lower level sub-tasks.

    Include subtotals by cost type (labor, supplies, equipment, etc.).

    To earn 80-89% of the points available for this assignment –

    The TEAM WBS should have corrections made to durations and predecessors as a result of sharing and
    looking at fellow classmates’ MS Project team efforts and in response to comments from the instructor.

    Durations, predecessors and resources are assigned for all tasks. Resources include the majority of

    people, facilities, supplies, materials, facilities, and contractors, etc. required to accomplish EACH task at

    EVERY level. Things that will be needed to accomplish the task are included as resources for that task.

    The RESOURCE SHEET View shows labor and non-labor. The RESOURCES GRAPH shows no more than 3

    red bars for over-allocations. The accompanying Word document or text answers most questions, with

    some discussion related to how the team determined the appropriate resources, whether or not some

    work was contracted out and why, what vendors might be involved in the project and what products or

    services they would provide, and at some reference sources are used in the text and included in a

    Reference page.

    The Excel worksheet should include the majority of costs for expendable materials and supplies, non-

    expendable equipment, facilities, and contractors or vendors. Most people assigned to do the work of

    the tasks are identified, along with their labor rates, hours, and costs per person. Include everything it

    takes to do every task at every level. Make sure that there is a clear bottom line total of all project costs.

    Include costs for each sub-task. Add them up for higher level summary tasks. Do not assess costs against

    summary tasks individually except by adding up the

    costs of the lower level sub-tasks.

    To earn 70-79% of the points available for this assignment –

    The TEAM WBS should have most corrections made to durations and predecessors as a result of sharing

    and looking at fellow classmates’ MS Project team efforts and in response to comments from the

    instructor. Durations, predecessors and resources are assigned for all tasks. Resources include people,

    facilities, supplies, materials, facilities, and contractors, etc. required to accomplish most tasks. Things

    that will be needed to accomplish the task are included as resources for that task. The RESOURCE SHEET

    View shows labor and non-labor. The RESOURCES GRAPH shows no more than 5 red bars for over-

    allocations. Some of the questions are addressed.

    The Excel worksheet should include the majority of costs for several categories such as expendable

    materials and supplies, non-expendable equipment, facilities, and contractors or vendors. Most people

    assigned to do the work of the tasks are identified, along with their labor rates, hours, and costs per

    person. Include most of what it takes to do every sub-task at every level. Make sure that there is a clear

    bottom line total of all project costs. Include costs for each lowest level sub-task. Add them up for higher

    level summary tasks. Do not assess costs against summary tasks individually except by adding up the

    costs of the lower level sub-tasks.

    To earn 60-69% of the points available for this assignment –

    Durations, predecessors and resources are assigned for most sub-tasks. Resources include people,

    facilities, supplies, materials, facilities, and contractors, etc. The Resource Sheet View shows labor and

    non-labor. The Resources Graph shows no more than 7 red bars for over-allocations.

    The Excel worksheet should include the majority of costs for categories such as expendable materials

    and supplies, non-expendable equipment, facilities, and contractors or vendors. Most people assigned

    to do the work of the tasks are identified, along with their labor rates, hours, and costs per person.

    Make sure that there is a clear bottom line total of all project costs. Include costs for each lowest level

    sub-task. Add them up for higher level roll-up summary tasks. Do not assess costs against summary tasks

    individually except by adding up the costs of the lower level sub-tasks.

    Less than 60% –

    Team efforts that do not meet the requirements will earn a zero. Team efforts that are not original work

    will earn a zero. Team efforts that do not have proper APA references and citations to any included or

    quoted work will earn at most 50%.

    Please notice that there is a STRONG incentive for ALL team members to carefully proofread team

    documents before submitting. This incentive will continue through the semester.

    What Will You Get?

    We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

    Premium Quality

    Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

    Experienced Writers

    Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

    On-Time Delivery

    Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

    24/7 Customer Support

    Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

    Complete Confidentiality

    Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

    Authentic Sources

    We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

    Moneyback Guarantee

    Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

    Order Tracking

    You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

    image

    Areas of Expertise

    Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

    Areas of Expertise

    Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

    image

    Trusted Partner of 9650+ Students for Writing

    From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

    Preferred Writer

    Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

    Grammar Check Report

    Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

    One Page Summary

    You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

    Plagiarism Report

    You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

    Free Features $66FREE

    • Most Qualified Writer $10FREE
    • Plagiarism Scan Report $10FREE
    • Unlimited Revisions $08FREE
    • Paper Formatting $05FREE
    • Cover Page $05FREE
    • Referencing & Bibliography $10FREE
    • Dedicated User Area $08FREE
    • 24/7 Order Tracking $05FREE
    • Periodic Email Alerts $05FREE
    image

    Our Services

    Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

    • On-time Delivery
    • 24/7 Order Tracking
    • Access to Authentic Sources
    Academic Writing

    We create perfect papers according to the guidelines.

    Professional Editing

    We seamlessly edit out errors from your papers.

    Thorough Proofreading

    We thoroughly read your final draft to identify errors.

    image

    Delegate Your Challenging Writing Tasks to Experienced Professionals

    Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

    Check Out Our Sample Work

    Dedication. Quality. Commitment. Punctuality

    Categories
    All samples
    Essay (any type)
    Essay (any type)
    The Value of a Nursing Degree
    Undergrad. (yrs 3-4)
    Nursing
    2
    View this sample

    It May Not Be Much, but It’s Honest Work!

    Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

    0+

    Happy Clients

    0+

    Words Written This Week

    0+

    Ongoing Orders

    0%

    Customer Satisfaction Rate
    image

    Process as Fine as Brewed Coffee

    We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

    See How We Helped 9000+ Students Achieve Success

    image

    We Analyze Your Problem and Offer Customized Writing

    We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

    • Clear elicitation of your requirements.
    • Customized writing as per your needs.

    We Mirror Your Guidelines to Deliver Quality Services

    We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

    • Proactive analysis of your writing.
    • Active communication to understand requirements.
    image
    image

    We Handle Your Writing Tasks to Ensure Excellent Grades

    We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

    • Thorough research and analysis for every order.
    • Deliverance of reliable writing service to improve your grades.
    Place an Order Start Chat Now
    image

    Order your essay today and save 30% with the discount code Happy