DESIGN OF SECONDARY BIOLOGICAL TREATMENT PLANT

Abstract

TO PROVIDE A DESIGN APPRAISAL FOR INCLUSION OF A SECONDARY TREATMENT PLANT THAT IS CURRENTLY EQUIPED WIH A PRIMARY TREATMENT PLANT 

TABLE OF CONTENTS

1. INTRODUCTION

2.INTRODUCTION TO BIOLOGICAL NUTRIENT REMOVAL (BNR)

3. DESIGN DATA & PARAMETERS ASSUMED

     3.1  DESIGN FLOW Q

     3.2  PROCESSING TEMPERATURE

     3.3  INFLUENT TKN

     3.4  READILY BIODEGRADABLE CHEMICAL OXYGEN DEMAND

4.  DESIGN PROCEDURE

5.  BIOWIN MODELLING

6.  CONCLUSION

7. REFFERENCES

    APPENDEX

             Wastewater Treatment Plant Design

1.INTRODUCTION

The Coastal Wastewater treatment plant currently has a Primary Treatment Plant only. A design appraisal has been requested for a secondary treatment plant. This report is to design a draft based on the influent characteristics of the waste water and designed for the give effluent characteristics.

The accumulation of nutrients in the waste water especially nitrogen and phosphorous leads to decrease in water quality. To control and treat the waste water various treatment methods have been tested. After careful consideration of various influent parameters like BOD, COD, Ammonia-N, TSS, Total Nitrogen and Total Phosphorous etc., the “Anerobic-anoxic-aerobic (A2O)” process was employed due to its ease of working and diverse advantages.

2.Intoduction to Biological Nutrient Removal Process (BNR)

Biological Nutrient Removal Process was developed in the 1960s, it has been used since then due to is various advantages over other Chemical Process. BNR is a modification of Activated Sludge Treatment Process that incorporates an Anoxic and/or anerobic zones to enables removal of nitrogen and phosphorous from the wastewater.

“Anerobic-anoxic-aerobic” is a type of BNR which has a 3 stage Phoredox Anerobic-Anoxic-Oxic (A2O) system. The stages in this system are Anerobic system, anoxic system, and aerobic system. Each system treats a certain type of effluent. The treatment of phosphorous takes place in the anerobic stage whereas BOD gets treated in the aerobic stage by the process of nitrification. Denitrification process removes the nitrate in the anoxic stage. (Metcalf & Eddy, 2003). Any process has certain limitation, so does A2O process. Some of the limitations of the process are, i) decrease in the reduction of the removal of the Phosphorous due to recycling of RAS along with nitrate in the anerobic stage. ii) decrease in removal of Nitrogen due to internal recycling ratio (Metcalf & Eddy, 2003). iii) reduction in activity of PAOs.

Fig shows the proposed A2O process secondary treatment plant

3. Design data and Parameters assumed.

The designing of the Secondary wastewater Treatment Plant is based on the provided design data, Kinetic data and few important assumptions made. Some of the Kinetic data is incorrect so corrections had to be made to bring them in the recommended range as given in the Metcalf & Eddy, (2003).

3.1           Design Flow Q

                  To obtain the daily flow rate ‘Q’ for the give proposed capacity of       210,000 Equivalent Population (EP), an average daily consumption of 340 L/ep (Riverina Water County Council, NSW) was taken for calculation along with an 80% recovery factor. A peaking factor of 1.93 was taken (Harmon Coefficient). So, the flow rate, Q= 340 x .8 x 1.93 x 210,000 = 110,241.6 m3/day.

3.2           Processing Temperature

     Average processing temperature of 200 was set for easy calculation therefore there was no need for corrections for Kinetic coefficients.

     3.3      Influent TKN

                    The TKN value is taken in the form of NH4-N

3.3           Readily Biodegradable Chemical Oxygen Demand (rbCOD)

      A major design parameter rbCOD was not given, therefore the value   of rbCOD is assumed from Metcalf & Eddy, 2003. 15% – 25% of bCOD was taken at the end. To consider for the rbCOD consumed in anerobic stage, 25% was assigned for removal of Phosphorous removal and 10% was assigned for denitrification.   

Table containing the design data and the assumed parameters

         INFLUENT PARAMETERS

         EFFLUENT PARAMETERS

Parameter

     Unit

   Value

Parameter

     Unit

    Value

Alkalinity

mg as CaCO3/L

269

BOD

mg/L

21

COD

mg/L

201

TSS

mg/L

4

pH

7.78

Ammonia-N

mg/L

1

TSS

mg/L

98

Total N

mg/L

27

VSS

mg/L

80

Total P

mg/L

6

Ammonia-N

mg/L

34.7

Total N

mg/L

48.2

Total P

mg/L

7.63

        PARAMETER

         UNITS

    VALUE

         REMARKS

Kinetic Data

Y

g MLVSS/g BOD removed

0.60

Given data

K1

kg BOD utilized/kg VSS.day

10

Given data

Kd

day-1

0.1

Given data

Ks

mgBODµ/L

20

Given data

Kinetic Constant for Nitrifying Bacteria

µNmax

d-1 at 20°C

0.7

Given data

KN

mg NH4 + as N /L

0.7

Given data

YN

Kg VSS/ Kg NH4+ as N nitrified

0.12

Given data

Assumptions

MLSS

mg/L

2400

Given data

Water consumption/per capita

L/ep. Day

340

(Riverina Water County Council, NSW)

Recovery factor

Percentage

80

Peaking factor (Harmon coefficient)

1.93

rbCOD/bCOD

0.25

(Metcalf & Eddy)

rbCOD/bCOD

1.6

(Metcalf & Eddy)

FS (TKN peak /TKN average)

1.5

(Metcalf & Eddy)

DO

mg/L

2

(Metcalf & Eddy)

BOD/COD Ratio

0.5

 

Average process temperature

0C

           20

Ko

g/m3

0.5

(Metcalf & Eddy)

Kdn

g VSS/g VSS.d

0.08

(Metcalf & Eddy)

Fd

0.15

(Metcalf & Eddy)

Nox/TKN

0.78

(Metcalf & Eddy)

VSS/TSS

0.8

(Metcalf & Eddy)

Px,bio = Px,vss

rbCOD/NO3-N

g/g

6.6

(Metcalf & Eddy)

rbCOD/P

g/g

8

(Metcalf & Eddy)

Detention time in the anoxic tank

H

1

(Metcalf & Eddy)

4. Design Procedure

The various design data was changed to need for calculation purpose. Some of the kinetic constants were assumed. The assumed constants and other design data are mentioned in the above Table. Some of the missing data were also assumed for calculations. All these data and constants were obtained for “Metcalf & Eddy,2003”.

The design process was carried out in 3 stages. The first stage was the design for BOD and Nitrification. The second stage was for removal of Phosphorous. The third stage was designed for Denitrification process. An Activated Sludge process, single sludge bio-N removal process and an Anoxic/Aerobic process design was considered. (Metcalf & Eddy,2003).

BOD & Nitrification

The BOD and Nitrification removal process by Activated Sludge process was carried out by the following steps.

1.  The DO concentration was assumed to 2 mg/L to calculate growth rate aimed at Nitrification µn by means of Eq.1. The nitrification factor of 1.5 was taken. Design SRT was computed using Eq.3 (Metcalf & Eddy,2003).

2.  Using the Eq.4 the max Specific growth rate µm was calculated. Based on the Kinetic constants Y & K1, the effluent substrate (S) was calculated by means of Eq.5

3.  Px,bio (Biomass Production) was calculated by means of Eq.9 grounded on the ideals of A, B and C using Eqs. 6, 7, 8. The NOx was assumed to be approximately equal to 0.8 TKN (Metcalf & Eddy,2003). But the real value was calculated using the Eq. 10. The obtained value was found to be similar to that of the assumed value.

4.  The mass of VSS and TSS was calculated using Eqs. 12 and 13. The concentration of VSS was taken to be same as Px,bio as there was no info about the nbVSS. The concentration of TSS was calculated using Eq.11 presuming that VSS = 80% TSS (Metcalf & Eddy,2003).

5.    The volume of the aeration tank was figured by Eq.14 for the given MLSS. Four number of basins were assumed with a depth of 6.5m and a width ratio of 1.5 : 1(Metcalf & Eddy,2003).

Phosphorous Removal

The removal of Phosphorous takes place in the anerobic stage in the  A2O Process. The following are the procedures of the removal:

1.     The determination of the rbCOD available for the removal of Phosphorous, Eq.25 was used. The nitrate mass balance was performed at the influent using Eq.22 bearing in mind no NO3 concentration in the influent. Taking rbCOD/nitrate = 6.6, bCOD/BOD= 1.6 and rbCOD/bCOD = 0.25 equivalent rbCOD was computed (Metcalf & Eddy,2003).

2.      The P removed by Biological Phosphorous Removal was computed by Eq.26 taking 8g of rbCOD/g Phosphorous is removed BPR (Metcalf & Eddy,2003).

3.      The concentration of Phosphorous removed was calculated by Eq.29 taking that the concentration of Bio P removed and the concentration of P used for biomass growth.

Denitrification

The anoxic stage is responsible for the denitrification. A recycle stream from aerobic zone with oxygen form nitrification being removed is considered. The design process carried out is as follows;

1.      The biomass concentration was calculated by Eq.32, the volume of nitrite nursed into the anoxic tank is computed by Eq.33, Eq.34 and Eq.35. The volume of anoxic zone is computed by Eq.36 for a suitable detention time.

2.      The amount of nitrate reduced was calculated by Eq.38. when the nitrate fed is not equal to the nitrate reduced, detention times must be varied. Specific Denitrification Rate as a function of MLSS with observed were computed, the SDNR was got using Eq.39.

3.       The oxygen credit and the net oxygen needed was calculated using Eq.40 and Eq.41. The air flow rate was computed using Eq.42 and Eq.43. The equation 43 was used to convert mass flow rate to volumetric flow rate.

4.       The required alkalinity was as conc of CaCO3 was computed by Eq.46 and Eq.47. It is an important factor as some of the reactions have the propensity to change the pH which impacts the system performance.

Design of Secondary Clarifier

Secondary clarifier was needed to settle and remove the suspended solids that include the nutrients. The design is a 3-step process, defining the return sludge recycle ratio, determine the clarifier size and loading volume of solid. The area of clarifier was determined using Eq.54 as a purpose of design flowrate and supposed hydraulic application rate. The diameter of the basin was designed based on the number clarifiers. The loading volume of solids was computed based on the Eq.58. The number of clarifiers varies based on the loading rate of solids.

5.BioWin Modeling:

BioWin is simulator used in designing of a wastewater treatment process, that bonds together the biological, chemical and the process models. BioWin is used all over the world to design, advancement and enhance wastewater treatment plants of all types. The core of BioWin is an exclusive biological model which is accompanied with other process models (e.g. water chemistry models for calculation of pH, mass transfer models for oxygen modelling and other gas-liquid interactions).

Get Help With Your Essay
If you need assistance with writing your essay, our professional essay writing service is here to help!
Essay Writing Service

The Biowin modeling was used to validate the theoretical values obtained. It was found that the theoretical values satisfied curtained parameters but did not satisfy other parameter. The model was edited to obtain the required effluent parameters. Parameter like Ammonia and COD obtained by the theoretical calculations were not in the required effluent range. Hence the model was reconfigured, like the theoretical volume of the aeration tank was very less and thus Ammonia couldn’t be reduced to the required effluent range. Therefore, the volume of the Aeration tank was increased by trial and error method to achieve the effluent standards.

The kinetic constants were entered. Mixers were used to mix the influent before it was inlet into the aeration tank. Splitters with a constant of 0.6 were used to recycle the RAS back to the Aeration tank from the Clarifiers. The treated biowaste was collected as sludge and was disposed. All the given Influent parameters were reduced successfully in the Biowin model.

Changes made in the design for attaining the given range was very sensitive. Change in dimensions in the Aeration tank or the clarifiers had subtle changes in the output.

6.Conclusion

To achieve the given effluent values for the influent values an Anerobic-Anoxic-Aerobic process was adopted for the design purpose. The 3-stage process consisted of BOD removal, Nitrification, Phosphorous removal & Denitrification in addition to design of clarifiers for settling and removal of biological suspended solids. Due to insufficient data given for designing several kinetic data and certain values were assumed as per requirement.(Metcalf & Eddy 2003). A few changes were made to the obtained values from the theoretical calculations to achieve the required effluent parameters.

The anticipated effluent values were achieved based on the proposed design. The Treatment plant can be implemented based on the proposed design and will have a high success rate in removal of the influent parameters.

APPENDEX-A

ASSUMPTIONS

PARAMETERS

UNIT

VALUE

REMARKS

Depth of basin

m

6.5

(Metcalf & Eddy)

Width to depth ratio

1.5 : 1

(Metcalf & Eddy)

CS,20

mg/L

9.08

(Metcalf & Eddy)

Α

0.65

(Metcalf & Eddy)

Β

0.95

(Metcalf & Eddy)

F

0.9

(Metcalf & Eddy)

CS,TH=CS,TH=CS,20

(Metcalf & Eddy)

Fine bubble ceramic diffusers with an aeration clean water O2 transfer efficiency

35%

(Metcalf & Eddy)

Required alkalinity to transform ammonium to nitrate

g CaCO3/g NH4-N

7.14

Residual alkalinity concentration to maintain pH in range 6.8-7

g/m3

80

(Metcalf & Eddy)

Influent alkalinity

g/m3 as CaCO3

140

(Metcalf & Eddy)

Return sludge mass concentration

g/m3

8

Design MLSS XTSS concentration

g/m3

3

Hydraulic application rate

m3/m2.d

22

(Metcalf & Eddy)

Number of clarifiers

3

Phosphorus content of heterotrophic

g P/g

0.015

(Metcalf & Eddy)

Alkalinity as CaCO3 produced per NO3-N Oxidized

g/g

3.57

(Metcalf & Eddy)

APPENDEX-B

SUMMARAY OF RESULTS

PARAMETERS

UNIT

VALUE

REMARKS

BOD REMOVAL AND NITRIFICATION

Average wastewater flow

m3/d

110,241.6

1ep =340  L/day

Average BOD load

kg/d

100.5

Average TKN load

kg/d

18

Aerobic SRT

d

3.198

>7, (Metcalf & Eddy)

Aeration tanks

4

4 tanks (Metcalf & Eddy)

Aeration tank volume, each

m3

4600

Aeration Tank Length

M

31

approx. 150m per tank, (Metcalf &eddy)

Aeration Tank Width

M

15

W:D ratio 1.5, (Metcalf & Eddy)

Aeration Tank Depth

m

10

Assumed

Hydraulic retention time

h

6.5

MLSS

g/m3

2400

MLVSS

g/m3

1582.642

F/M

g/g.d

0.593

0.04-1, (Metcalf & Eddy)

BOD loading

kg BOD/m3.d

0.939

0.04-1, (Metcalf & Eddy)

Observed yield

kg TSS/kg bCOD

0.810

kg VSS/kg BOD

1.296

Oxygen required

kg/h

1393.62

Air flowrate at average wastewater flow

m3/min

396.50

RAS ratio

0.6

Clarifier hydraulic application rate

m3/m2.d

22

16-24, (Metcalf & Eddy Table 8.7)

Clarifiers

Nos

3

Diameter ,m

46

Alkalinity addition as Na(HCO3)

kg/d

27410.47

BIOLOGICAL PHOSPHOROUS REMOVAL

P used for biomass growth

g/m3

1.22

P removed

mg/L

5.7387

P content of waste sludge

%

7.146

DENITRIFICATION

Effluent NO3-N

g/m3

6

Internal recycle ratio

6.266

RAS recycle ratio

0.6

Anoxic volume

m3

6429.98

Overall SDNR

g NO3-N/g MLSS.d

0.140

Detention time

h

1.2

Alkalinity required

kg/d as CaCO3

16316.08

EFFLUENT QUALITY PARAMETERS

Effluent BOD

mg/L

19.02

Target value achieved

Effluent NH4-N

mg/L

0.17

Target value achieved

Effluent N

mg/L

15.37

Target value achieved

Effluent P

mg/L

3.92

Target value achieved

Effluent TSS

mg/L

0

Target value achieved

APPENDEX – C

NOMENCLATURE

Q: influent wastewater flowrate (m3/d)

Ko: oxygen inhibition coefficient, g/m3

µm: Maximum specific growth rate (d)

BOD: Biological oxygen demand (mg/L)

DO: Dissolved oxygen, mg/L

Fd: cell debris fraction (unitless)

TSS: Total suspended solids (mg/L)

µNmax: Maximum specific growth rate of nitrifying bacteria, g new cells/g cells . d

MLSS: mixed-liquor suspended solids, mg/L

TKN: influent TKN concentration (mg/L)

µm: Maximum specific growth rate, (d)

PX,bio: Biomass production (kg VSS/d)

Ne: effluent NH4-N concentration, mg/L

µn: Specific growth rate for nitrification (d-1)

PX,VSS: Solid production as VSS (kg/d)

Total P: Total phosphorus (mg/L)

µ: Specific growth rate  (d-1)

PX,TSS: Solid production as TSS (kg/d)

NH4-N: Ammonia as Nitrogen (mg/L)

SRT: Solid retention time (d)

Fraction VSS: fraction of VSS over TSS, unitless

Y: Heterotrophic yield coefficient (kg VSS produced/Kg BOD

FS: Safety Factor

XVSS * V: Mass of VSS (kg)

K1: Maximum specific substrate utilization rate (Kg BOD/Kg VSS.d)

So: Influent substrate concentration (mg/L)

XTSS * V: Mass of TSS (kg)

Kd: Microbial decay coefficient (d-1)

S: Effluent substrate concentration (mg/L)

V: Total volume of aeration tanks (m3)

Ks: Saturation coefficient (mg/L)

A: heterotrophic biomass, kg/day

Ƭ: Detention time (h)

YN: Nitrifier yield coefficient (Kg VSS produced/Kg NH4+ – N nitrified)

B: cell debris, kg/d

Lorg: Volumetric BOD (kg/m3.d)

Kdn: Endogenous decay coefficient for nitrifying organisms (g VSS/g VSS∙d)

C: nitrifying bacteria biomass, kg/day

Yobs,TSS: Observed yield base on TSS (g TSS/gBOD)

KN: Half-velocity constant, substrate concentration at one-half the maximum specific substrate utilization rate (g/m3)

D: Nonbiodegradable VSS in influent, kg/day

Yobs,VSS: Observed yield base on VSS (g VSS/gBOD)

rbCOD: Readily biodegradable chemical oxygen demand  (mg/L)

TSSo: influent wastewater TSS concentration (mg/L)

NOx influent: Concentration of NH4-N in the influent flow that is nitrified (mg/L)

N: nitrogen concentration, g/m3

VSSo: influent wastewater VSS concentration (mg/L)

β: Salinity-surface tension correction factor (unitless)

Xb : active biomass concentration (mg/L)

F/Mb: BOD F/M ratio based on activated biomass concentration (gBOD/g biomass .d)

F: fouling factor (unitless)

kd: endogenous decay coeff. (1/day)

NOr: nitrate removed (g/d)

CS,T,H: Oxygen saturation concentration in clean water at temperature t and altitude h (mg/L)

NOx effluent: nitrogen oxides in the effluent (mg/L)

SDNR (MLSS): specific denitrification rate referred based on MLSS (g NO3-N/g MLVSS. d)

CS,20: Dissolved oxygen saturation concentration in clean water at 20C and 1 atm or 760 mmHg (mg/L)

IR : internal recycle ratio (unitless)

R1: Oxygen credit (kg/h)

CL : operating oxygen concentration

Qanoxic : flow rate to anoxic tank (m3 /d)

Ro: Net oxygen required (kg/h)

E: diffusers oxygen transfer efficiency

NOx feed: NO3– N fed to the anoxic tank (kg/d)

AOTR: actual oxygen transfer rate under field conditions(kg O2/h)

Alk produced-denitrification: alkalinity produced in denitrification (g/m3)

Vnox: volume anoxic tank (m3)

SOTR: Standard Oxygen Transfer Rate in Tap Water at20°C and zero dissolved oxygen (kg O2/h)

NOx RAS: nitrogen oxides in the effluent in the return activated sludge (mg/L)

SDNR: Specific denitrification rate (g NO3-N /g MLVSS.d)

α: Oxygen transfer correction factor for waste (unitless)

D: diameter (m)

Qr: RAS flowrate (m3/d)

R: return activated sludge (RAS) recycle ratio (unitless)

A: total area of clarifier (m2)

Xr: Return sludge mass concentration (g/m3)

X: Mixed-liquor suspended solids (mg/L)

 

APPENDEX – D

FORMUAL USED

EQUATION

NO

FORMULA

EQUATION

NO

FORMULA

BOD REMOVAL AND NITRIFICATION

1

     =2.132 * 1.5

=3.198 d

Max Specific Growth rate 

 µm = K1 * Y

                                       =10 *0.6 = 6

Effluent  Substrate Conc (BOD Effluent)
S=Ks1+kd.SRTSRTμm–kd–1
S=201+0.1*3.1983.1986–0.1–1

S=1.47726 mg/L

Biomass Production

A (heterotopic Biomass)
A=QY(So–S(1kg103g)1+(kd)SRT
=11024106*0.6(100.5–1.47721+0.13.198

=4962.760 Kg/d

B (Cell Debris)
B=fdkdQYSO–SSRT(1kg103g)1+(kd)SRT
B=0.150.1110241.6*06100.15–1.47723.1981+0.1198

=396.772 Kg/d

C (Nitrifying Bacteria Biomass)
C=QYNOx1kg103g1+kdnSRT
C=110241.6*0.12(47.1994)1+0.13.198

=477.10325 Kg/d
PX,bio=A+B+C
PX,bio=4962.760+396.772+477.10325

=5836.6352 Kg VSS/d

Oxidation of Ammonia to Nitrate
NOx=TKN–Ne–0.12∙PX,bio/Q
NOx=48.2–1–0.12∙5836.6352/110241.6

=47.1994 g/m3

Concentration of VSS and TSS
PX,TSS=A0.85+B0.85+C0.85+D+Q∙(TSSo–VSSo)
PX,TSS=4962.7600.85+396.7720.85+477.18320.85+0+110241.6∙(98–80/1000)

=8850.97 Kg/d

Mass of VSS  and TSS
XVSS∙V=(PX,VSS)∙SRT
XVSS∙V=(5836.6352)∙3.198

=18665.55 Kg
XTSS∙V=PX,TSS∙SRT
XTSS∙V=(8850.97)∙3.198

=28305.402 Kg

Design of Aeration Tank
V=XVSS∙VMLSS
V=28305.4022400

=11793.91 m3

Assumed no of Tanks = 4

Volume of basin = V/4

=11793.91 / 4

=2948.44 m3

Assumed Depth = 6.5

Width to depth ratio = 1.5 : 1

Width = 6.5*1.5 = 9.5

=10 m

Length of the tank = Volume of tank /width * depth

=2948.44/ 10*6.5

=46 m

Detention time
τ=VQ
τ=29900110241.6

=6.5 h

Fraction of VSS
Fraction VSS=XVSS∙VXTSS∙V
Fraction VSS=18665.5528305.402

=0.659

MLVSS

MLVSS=Fraction VSS*MLSS

=0.659*2400

=1582.642 g/m3

Volumetric BOD
Lorg=Q*SOV
Lorg=110241.6*100.511793.91

=0.939 Kg/m3.d

Observed Yield based on VSS
Yobs,TSS=PX,TSSQ∙(SO–S)
Yobs,TSS=8850.97110241.6∙100.5–1.4774

=0.810 gTSS/g bCOD
Yobs,VSS=Yobs,TSS*VSSTSS
Yobs,VSS=0.63*0.816

=0.5142 g VSS/gBOD

Oxygen Demand

Ro=Q (So – S) – 1.42Px,bio + 4.33 Q (NO3)

=110241.6(100.5-1.499) – 1.42*5836.63 + 4.33*110241.6*47.1994

=1393.62 Kg/h

Mass of Alk needed as CaCO3 for nitrification 

Alk used for nitrification = 7.14g CaCO3 g NH4– N*NOx  g/m3

=7.14*47.1994

=337 g/m3 used as CaCO3

Alk to be added = Alkalinity – pH -Influent Alk + Alk used

=80 – 269 +337

=148

Alk to be added = 110241.6*148/1000

=16315.756 Kg/d as CaCO3

Na(HCO3) needed  =Alkalinity needed as CaCO3 * Equivalent amt of Na(HCO3) / Equivalent weight of CaCO3

=(163150456 +80)/ 50

=27410.47 Kg/d Na(HCO3)

Phosphorous Removal

P removal design requirement

NO3 = 27 mg/L

NO­3-N in RAS

NO­3-N in RAS = NO3­-N = Total N -NH4-N

=27-1

=26 mg/L

Nitrate mass balance at influent in the reactor

NO3-N­react = NO3 RAS * Q / Q + Qr

=(26*110241.6*0.6) / (110241.6 + (110241.6 * 0.6))

=9.75 mg/L

rbCOD available for P removal

rbCOD equivalent = NO3 react * 6.6

=9.75*6.6

=64.35 mg/L

rbCOD available for P removal

rbCOD available for P removal =rbCOD influent – rbCOD equivalent

but   rbCOD influent = 0.25(1.6*BOD)

=0.25(1.6*100.5)

=36.15 mg/L

Phosphorous removed by BPR mechanism

Bio P removal = rbCOD available for P removal / (ratio of rbCOD/BOD)

=36.15 / 8

=4.518 mg/L

P used for heterotrophic biomass synthesis in addition to phosphorous storage due to BOD

Px,bio= A + B

= 4962.760 + 477.10325

=5439.86 Kg/d

P used for biomass growth  = pH content of heterotrophic biomass  * Px,bio

=0.015 * 5439.8

=1.22 mg/L

P removed  = Bio p removed + Pused for biomass

=4.158 + 1.22

=5.7387 mg/L

P content of waste sludge

Total P in sludge = p removed * Q / 1000

=(5.7387 * 110241.6) / 1000

=632.54 Kg/d

P % = ( Total P in sludge/ Px,TSS) * 100

=(632.54 * 100) / 8850.97

= 7.146 %

Denitrification

Active biomass calculation
Xb=Q∙SRTVY∙(So–S1+kdSRT
Xb=110241.6∙3.198117930.6∙(100.5–1.49971+0.13.198

=1345.78 mg/L

Internal recycle ratio
IR=NOXNoxeffluent–1–R
IR=47.19946–1–0.6

=6.266

Amount of NO3-N to the anoxic tank

Flowrate to anoxic tank = IR * Q + R * Q

=6.266*110241.6 + 110241.6 * 0.6

=756980.93 m3/d

NOx= feed = Qanoxic  * NOx effluent

(756980.93 * 6)  / 1000

=4541.88 Kg/d

Volume of anoxic tank

Vnox = τ * Q

=0.05 * 110241.6

=6429.98 m3

SDNR

SDNR = 0.42

Amount of NO3-N that can be reduced

NOr = Vnox * SDNR * MLVSS

=6429.98 * 0.42 * 1582.642

=7094.68 kg/d

Capacity ratio

Capacity ratio = NOx / NOx feed

=7097.68 / 4541.88

=1.56  

 >T =1.4 therefore acceptable

Airflow rate
SOTR=AOTRCs,20α∙F∙(β∙CS,T,H–CL
SOTR=766.669.080.65∙0.9∙(0.95∙908–2

=1795.8 Kg/L
Air Flow Rate=SORTE*0.27*60
Air Flow Rate=1795.80.3*0.27*60

=369.50 m3/min

Alk to be added = alkalinity – pH – influent Alk + Alk used – Alk produced – denitrification

=80 – 269 -337.003

=148.003 g/m3

Mass of alkalinity needed

Mass of alk needed = Alk to be added * Q /1000

=(148.003 * 110241.6) / 1000

=16316.098 Kg/d CaCO3

Anoxic zone mixing energy

Anoxic zone mixing energy = V * Mixing energy

=6429.98 *10 / 1000

=64.29 KW

Secondary clarifier Design

Return sludge recycle ratio

RAS recycle ratio = Qr / Q

=(110241.6 * 0.6) /110241.6

=0.6

Size of clarifier

Area = Q / hydraulic application rate

=110241.6 / 22

=5010.98 m3

Area per clarifier = Area / No of clarifier

=5010.98 / 3

=1670 m3
D= 4*Areaπ
D= 4*1670π

=46.12

=46 m
A=π4*D2*3
A=π4*462*3

=4983 m3

Solid loading
Solid Loading=1+RQMLSSA
Solid Loading=1+0.6110241.6*2400)4983*24

=3.53 kg MLSS / m2 h

APPENDEX -F

BIOWIN MODEL

7.References

( ;  ‘BioWin ‘ ;  ‘Chapter 7 – Metcaf Eddy 2015’ ;  ‘Chapter 8 – Metcaf Eddy 2015’ ;  ‘Enhanced biological phosphorus removal and its modeling for the a.pdf’ ;  ‘ Finalthesis_TU  ‘ ;  ‘lagoon-pond-treatment-2011’ ;  ‘Model history’ ;  ‘Seasonal influent characterization model calibration SRT and en’ ; A.Sathasivan ; Bechmann ; Bekir Ersu et al. 2008; Council ; E MOrgenroth ; Jokela et al. 2002; Metcalf, amp & Eddy 2003; Metcalf et al. 2002; N.Banadda ; Sh.Mardani ; Stensel & Shell 1974; Tomaszewska & Mozia 2002; Zeng et al. 2010; Zeng et al. 2011) .

A.Sathasivan, ‘Biological Phosphorous Removal Process for Wastewaster Treatment’.

Bechmann, H., ‘Modeling of Wastewater Systems’.

Bekir Ersu, C., Ong, S.K., Arslankaya, E. & Brown, P. 2008, ‘Comparison of recirculation configurations for biological nutrient removal in a membrane bioreactor’, Water Research, vol. 42, no. 6,pp. 1651-63.

‘BioWin ‘.

‘Chapter 7 – Metcaf Eddy 2015’.

‘Chapter 8 – Metcaf Eddy 2015’.

Council, R.W.C., ‘Average Water Use’.

E MOrgenroth, R.K.a.P.H., ‘Process and Modelling of Hydrolysis of particulate organic matter in a Aerobic Wastewater Treatment ‘.

‘Enhanced biological phosphorus removal and its modeling for the a.pdf’.

‘ Finalthesis_TU  ‘.

Jokela, J.P.Y., Kettunen, R.H., Sormunen, K.M. & Rintala, J.A. 2002, ‘Biological nitrogen removal from municipal landfill leachate: low-cost nitrification in biofilters and laboratory scale in-situ denitrification’, Water Research, vol. 36, no. 16,pp. 4079-87.

‘lagoon-pond-treatment-2011’.

Metcalf, amp & Eddy, I. 2003, Wastewater engineering : treatment and reuse, Fourth edition / revised by George Tchobanoglous, Franklin L. Burton, H. David Stensel. Boston : McGraw-Hill, [2003] ©2003.

Metcalf, Eddy, I., Tchobanoglous, G., Burton, F. & Stensel, H.D. 2002, Wastewater Engineering: Treatment and Reuse, McGraw-Hill Education.

‘Model history’.

N.Banadda, I.N.a.R.K., ‘A Review of Modelling Approaches in Activated Sludge Systems ‘.

‘Seasonal influent characterization model calibration SRT and en’.

Sh.Mardani, A.M., M.M.Amin and M.Ghasemian, ‘Determination of Biokinetic Coefficients for Activated Sludge Process ‘.

Stensel, H.D. & Shell, G.L. 1974, ‘Two Methods of Biological Treatment Design’, Journal (Water Pollution Control Federation), vol. 46, no. 2,pp. 271-83.

Tomaszewska, M. & Mozia, S. 2002, ‘Removal of organic matter from water by PAC/UF system’, Water Research, vol. 36, no. 16,pp. 4137-43.

Zeng, W., Li, L., Yang, Y., Wang, S. & Peng, Y. 2010, ‘Nitritation and denitritation of domestic wastewater using a continuous anaerobic-anoxic-aerobic (A(2)O) process at ambient temperatures’, Bioresour Technol, vol. 101, no. 21,pp. 8074-82.

Zeng, W., Li, L., Yang, Y.Y., Wang, X.D. & Peng, Y.Z. 2011, ‘Denitrifying phosphorus removal and impact of nitrite accumulation on phosphorus removal in a continuous anaerobic-anoxic-aerobic (A2O) process treating domestic wastewater’, Enzyme Microb Technol, vol. 48, no. 2,pp. 134-42.  

 

Cite This Work
To export a reference to this article please select a referencing stye below:

UKEssays. (November 2018). Design of a Wastewater Treatment Plant. Retrieved from https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1
Copy to Clipboard
Reference Copied to Clipboard.

“Design of a Wastewater Treatment Plant.” ukessays.com. 11 2018. UKEssays. 11 2023 <https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1>.
Copy to Clipboard
Reference Copied to Clipboard.

“Design of a Wastewater Treatment Plant.” UKEssays. ukessays.com, November 2018. Web. 29 November 2023. <https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1>.
Copy to Clipboard
Reference Copied to Clipboard.

UKEssays. November 2018. Design of a Wastewater Treatment Plant. [online]. Available from: https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1 [Accessed 29 November 2023].
Copy to Clipboard
Reference Copied to Clipboard.

UKEssays. Design of a Wastewater Treatment Plant [Internet]. November 2018. [Accessed 29 November 2023]; Available from: https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1.
Copy to Clipboard
Reference Copied to Clipboard.

{{cite web|last=Answers |first=All |url=https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1 |title=Design of a Wastewater Treatment Plant |publisher=UKEssays.com |date=November 2018 |accessdate=29 November 2023 |location=Nottingham, UK}}
Copy to Clipboard
Reference Copied to Clipboard.

All Answers ltd, ‘Design of a Wastewater Treatment Plant’ (UKEssays.com, November 2023) <https://www.ukessays.com/essays/environmental-sciences/design-of-a-wastewater-treatment-plant.php?vref=1> accessed 29 November 2023
Copy to Clipboard
Reference Copied to Clipboard.

Related Services
View all

DMCA / Removal Request
If you are the original writer of this essay and no longer wish to have your work published on UKEssays.com then please:

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy