“MV STC Bulk Carrier” is a geared handy max bulk carrier with five holds and a DWT of 49500T (summer).
SHIPS GENERAL PARTICULARS
NAME: STC BULK CARRIER
TYPE: BULK CARRIER
DWT SUMMER:49500 T
DISPALCEMENT SUMMER:57923TONNES
DISPLACEMENT WINTER:56423TONNES
NUMBER OF HOLDS:5 (ALL CAN CARRY HEAVY ORE )
CRANES:4×30 TONNES
HEAVY WEATHER HOLD:NO 3
BALLAST PUMP CAPACITY:2x2000T/Hr
CONSUMPTION:
FO-32TONNES PER DAY
DO-2TONNES PER DAY IN PORT
FW-4TONNES PER DAY IN PORT AND AT SEA
SEA SPEED:14 KNOTS
The ship has received the voyage orders as follows:
Discharge bulk sugar SF 1.224 m3/tonnes at Jubail using 3 vacuum discharge at a rate of 250t/hr per vacuum discharge
Load maximum cargo of sulphur SF 0.87 m3/tonnes with 4 shore feeders at Sharjah.Maximum draft at Sharjha berth is 15 metres
Vessel will receive the required bunkers for the voyage at Sharjah after cargo operation.
DISTANCE FOR THE VOYAGES
Distance Dar Es Salam to Jubail is 3744 Nm
Distance Jubail to Sharjah is 373 Nm
Distance Sharjah to Summer Load Line is 3210 Nm
Distance Sharjah to Melbourne is 6490 Nm
The vessel is presently in tropical zone and will be entering the summer zone on its way to Melbourne , so cargo should ne loaded keeping in mind that the vessel should be at here summer marks an arrival at summer load line i.e zone allowance should be added to get the correct value of cargo to be loaded .
This assignment covers a detail calculation on how to get the total amount of cargo to load when vessel will be entering from one zone to other and different loadicator conditions .
ANSWER:
Gather information relating to the cargo from the IMSBC, company procedure, flag state requirements.
Check if the cargo is in group A, B, C
Sulphur is in Group B and Group C. The IMSBC states that the group B cargo of sulphur cannot be carried in bulk so we will be carrying group C sulphur cargo.
GENERAL PROCEDURES FOR PREPARATION OF HOLDS
Tool box meeting to be carried out (MCA, 2016)
Risk assessment to be carried out (MCA, 2016)
Communication to be checked between the hold ,bridge and cargo control room (MCA, 2016)
The cargo hold to be properly ventilated , gasses to be checked and a permit of work to be issued (MCA, 2016) (IMO, 2016)
Dunnages to be removed if any.
Bilges to be cleaned and dry (P&I, 2002)
Strum boxes, bilge covers, sounding pipes and thermometer pipes should be cleaned and not be defected
Bilge suction of each hold to be tried out and bilges in good order (IMO, 2016)
Bilges to be covered with burlap.
The ventilation should be tried out
Any damage in the cargo hold to be repaired (MCA, 2016)
Hatch covers and entrance to the holds to be tried out for water tightness (P&I, 2002)
Hatch track ways to be cleaned (P&I, 2002)
All lighting arrangement in holds to be checked and any damaged or not working ones to be replaced (MCA, 2016)
Fire detection & extinguishing system should be checked (STC, 2017)
A thorough hold inspection to be carried out (P&I, 2002)
Crew should wear helmets, gloves, boiler suits, dust masks and gum boots at all time during cleaning process ,safety harness to be used when working aloft in the holds (MCA, 2016)
DB tanks to be pressed to check if any leaks in the holds.
Discharging of hold washing water should be carried out in accordance with MARPOL Annex V regulation 4.1.3 & 6.1.2 (IMO, 2011)
Test entries to be logged down (STC, 2017)
Any special requirements by the terminal, owners or flag state for hold preparation should be carried out.
ADDITIONAL PREPARATION FOR SULPHUR CARGO
Fresh water washing of holds to be carried out. (P&I, 2002) (IMO, 2016)
Fire line to be rinsed using fresh water from fresh water tanks using a GS pump. Once the line is flushed make sure that the anchor wash and all fire hydrants are shut (P&I, 2002)
Holds and bilges to be completely dry before loading (IMO, 2016)
Electric equipments in holds & nearby spaces should be intrinsically safe or if not then they should be isolated (IMO, 2016)
Ventilators Spark arrestors to be inspected & repaired if required (IMO, 2016)
Bilge pumping arrangement shall be inspected for satisfactory operation
lime washing should be done on tank top and lower sections of cargo spaces (IMO, 2016)
Upper part of the hold shall have a sound coating of paint, if any paint has been pilled off then that area shall be painted (IMO, 2016)
Any loos corrosion shall be removed (IMO, 2016)
Machinery and equipments to be covered to protect it from small sulphur dust particles (IMO, 2016)
ANSWER
HAZARDS OF RAW SUGAR AND SULPHUR
RAW SUGAR
Sugar dissolve when comes in contact with water, this may result in formation of air pockets in the body of the cargo as the ship moves (IMO, 2016) (P&I, SEPT 2006)
It has a tendency of self heating/spontaneous combustion. It should be loaded well clear of places having source of ignition or heat
Sugar has the tendency to absorb order (BMTSURVEYS, NOVEMBER 2013)
Raw sugar gets contaminated (BMTSURVEYS, NOVEMBER 2013)
Shrinkage or shortage of cargo due to loss of water vapour (BMTSURVEYS, NOVEMBER 2013)
Insect may be formed in sugar which can lead to diseases (BMTSURVEYS, NOVEMBER 2013)
Sugar if melted may form sticky syrup like form (P&I, SEPT 2006)
Raw sugar has a distinct molasses smell that will spoil other cargoes (Thomas, n.d.)
Raw sugar has a higher moisture than refined (Thomas, n.d.)
SULPHUR
Flammable and may have dust explosion during loading and unloading
If catches fire emits harmful gases
It reacts with sea water and produces corrosive acids and suffocating gases
Sometime of granule sulphur behaves like grain which may result in shifting of cargo
Dry sulphur does not react with bare steel, but wet sulphur (sulphur containing free water) is potentially highly corrosive (P&I, 2002)
When sulphur is loaded, any retained free water filters to the bottom of the holds during the voyage From there it is pumped out via the bilges (P&I, 2002)
Person may get a burning sensation in eyes when loading sulphur
PRECAUTIONS WHEN LOADING AND DISCHARGING RAW SUGAR IN BULK
Should be loaded away from the source of heat. NO SMOKING near the area of loading sugar (P&I, SEPT 2006)
The ships hold should be cleaned well before loading and should be free from any odour
Proper PPE to be worn by crew at all the time
Dust clouds should not be formed during loading
Temperature and moisture contains of sugar to be monitored during loading and carriage and if required ventilation should be carried out to avoid caking
Fermentation may result in formation of CO2 gas. Holds must be ventilated before entry and atmosphere to be checked (BMTSURVEYS, NOVEMBER 2013)
Loading operation should not be carried out in case of rain
Care must be taken to make sure that hot sugar is not loaded into a bulk carrier intended to sail through cold waters to its discharging port, as change in temperature establish within a cargo can result in moisture transfer, and this in turn can cause caking of the cargo (Thomas, n.d.)
PRECAUTIONS WHEN LOADING AND DISCHARGING SULPHUR IN BULK
Smoking and hot work shall not be permitted in cargo spaces and nearby area
All spaces and storerooms adjacent to the cargo area should be properly ventilated and proper precautions should be taken when entering in cargo hold and atmosphere should be monitored
A fine spray of fresh water is used to keep the dust down
The loader should be positioned properly to avoid formation of dust clouds
Loading operation should not be carried out in case of heavy rain
Proper trimming of cargo to be done
Surface ventilation must be carried out as required during the voyage
Face mask and eye protection should be worn at all times
Lime washing of the tank top to be carried out cargo holds and bilges do be completely dry to prevent corrosion
The upper part of the hold should be painted and pilled of paint should be repainted to avoid corrosion (IMO, 2016)
Protect the machinery and equipments from small dust particles of sulphur (IMO, 2016)
If sulphur catches fire, it should be smothered with more sulphur or with a very fine spray of fresh water – not salt water (Thomas, n.d.)
There is danger of dust explosion with powdered sulphur during loading and whilst cleaning the holds of sulphur (Thomas, n.d.)
The shipper is required to provided the information regarding the cargo to be loaded as per SOLAS 1974 Chapter VI Reg 2 and the IMSBC Code section 4.2. Shipper may deliver this declaration by fax or other electronic device. In any electronic device where the signature of the declaring party cannot be transmitted full name of the declarant in capital letters must be provided on the form (STC, 2017)
Cargo information shall be confirmed in written and by suitable shipping document before loading (IMO, 2016)
Document should contain following information.
The BCSN (IMO, 2016)
The group of cargo (IMO, 2016)
IMO class of the cargo (IMO, 2016)
The UN number if applicable (IMO, 2016)
The total quantity of cargo to load (IMO, 2016)
The stowage factor (IMO, 2016)
If trimming required and the procedures for trimming (IMO, 2016)
Angle of repose (IMO, 2016)
If the cargo has a likelihood of shifting (IMO, 2016)
Moisture content certificate (IMO, 2016)
Transportable moisture limit value (IMO, 2016)
If the cargo may form a wet base (IMO, 2016)
Toxic or flammable gases emitted by the cargo (IMO, 2016)
Flammability ,toxicity, corrosiveness of the cargo (IMO, 2016)
Self heating properties of the cargo if any (IMO, 2016)
Gases emitted if in contact with water if applicable (IMO, 2016)
If the cargo has any radioactive properties (IMO, 2016)
And other information required by the national authorities (IMO, 2016)
Whether the cargo is harmful to the marine environment (IMO, 2016)
Shipper details (STC, 2017)
Transport document number (STC, 2017)
Means of transport (STC, 2017)
Place of loading (STC, 2017)
Port of discharging (STC, 2017)
Additional certificate like weathering certificate ,exemption certificate if applicable (STC, 2017)
Human health criteria data (STC, 2017)
To obtain the information require by the section 4 of IMSBC code the shipper need to get the cargo properly sampled and tested (IMO, 2016)
When water is found cargo holds loaded with bulk cargo there are a many reasons and each should be taken into account (P&I, 2017) (Thomas, n.d.)
The water may be given out by the cargo or there is a leak in hatch covers. It may have entered through any access hatch or an open sounding pipe. Water may have sipped in through a crack in the deck or the hatch coming or through a damaged ventilator (P&I, 2017) (Thomas, n.d.)
Ship staffs should have an accurate idea of the capacity of the hold bilge wells i.e. the greatest value are the sounding of the bilge when full and the approximate tonnage of water contained by the bilge when full (P&I, 2017) (Thomas, n.d.)
Aboard a ship which is well maintained the possible cause for an increased hold bilge sounding is that water has drained from the cargo into the bilge. When water is drain from the cargo there are two key requirements. The water must be pumped out of the bilge and not allowed to flood the hold, and the tonnage of water removed must be logged. It is advisable to keep a record of the tonnage of water discharged from the hold bilges, as recommended by the UN Draught Survey Code24 and in some trades it is a charter party requirement (P&I, 2017) (Thomas, n.d.)
Find Out How UKEssays.com Can Help You!
Our academic experts are ready and waiting to assist with any writing project you may have. From simple essay plans, through to full dissertations, you can guarantee we have a service perfectly matched to your needs.
View our services
When soundings are found to be rising for no reason a problem must be suspected and the hold must be investigated for a leak. The accessibility to the hold will depend upon the quantity of cargo, speed of flooding, shifting cargo and dangerous gases. If the hold can be safely entered, taking all precaution for enclosed space entry it may be possible to find an explanation for the flooding. If the hold cannot be entered, a careful exterior inspection of the compartment in search for any fitting which is improperly closed or damaged. If the sounding is found to increase whenever the vessel ships water on deck, a leak at deck level should be suspected. If the flooding continues at the same rate, or an increasing rate, at all times it suggests that the damage is below water level (P&I, 2017) (Thomas, n.d.)
FOLLOWING ACTIONS TO BE CARRIED OUT
Firstly find out the amount of water in the hold and the root cause of water ingress
Carry out a risk assessment of the situation
Check the sounding of the bilges ballast tanks ,fuel oil tanks, void spaces etc
No cargo operation to be carried out in hold No1 until total assessment of situation carried out
Stability of the ship to be checked
If entry in hold is to be done then ventilate the holds and work permit to be issued
Inform the terminal about the damage
Calculate the total amount of cargo damaged
Make a log book entry of all the events
Make sure all man holds nut bolts full tight and gasket in good condition
Check comings, booby hatch entrance and deck plaiting for leakage
Make sure all the bilge valves are properly shut
Do not allow anyone to take pictures of the hold without permission
If cargo damage is found, contact P&I correspondents and ask them to arrangement of a survey.
Following information to be given to correspondents:- name of the vessel, date of the incident ,place of the incident , cargo particulars, quantity of damaged cargo, amount of the damage, location of cargo, bill of lading no, loading port, loaded quantity ,cause of the damage, contact details of the agent – ETA/ETD of the vessel (P&ICLUBJAPAN, n.d.)
Try to control further damage by taking all possible measures for lessening of damage unless such would involve a risk to the vessel’s safety (P&ICLUBJAPAN, n.d.)
Take photos of the damaged cargo and the suspected causes (P&ICLUBJAPAN, n.d.)
Log book entries like, sea conditions, weather and wind force (P&ICLUBJAPAN, n.d.)
Sea protest should be filed at next calling port, if the damage was caused by bad weather (P&ICLUBJAPAN, n.d.)
Make sure all time delays have been logged
FOLLOWING PERSONS TO BE INFORMED
Owners
Charters and sub charters
Manager
Local agents
Vessels insurance club e.g. P&I
DPA
Technical superintendent of the ship
Terminal
Class of the vessel
OTHER REFRENCES (Swedishclub, 2013) (P&I, 2017) (WEST OF ENGLAND , n.d.)Q10 PROCEDURE FOR MAINTAINING THE CARGO LIFTING PLAN
Regular maintenance should be carried out in order to keep the equipment in good order (MCA, 2006) (MCA, 2016)
Inspection of the equipments should be carried out by a competent person. It should be carried out as required by the Regulations but in any event at least once annually (MCA, 2006) (MCA, 2016)
Check for defects like cracks, corrosion and wear and tear that could affect SWL (MCA, 2006) (MCA, 2016)
If in doubt about the equipment has , exceeding the Safe Working Load (SWL), or subjected to treatment likely to cause damage, it should be removed of service till a competent person carries out an examination (MCA, 2016) (MCA, 2006)
Regular greasing of equipments to be carried out (MCA, 2006)
The condition of all ropes and chains should be checked regularly and damaged once to be replaced .Shackles, links and rings should be renewed if damaged (MCA, 2006)
Examine the structure for any damages (MCA, 2016)
There should not be any trapped water inside the Gantries (MCA, 2016)
Limit switch, stop botton, controls and brakes to be checked on regular basis (MCA, 2016)
Maker’s specific parts to be used if any parts are to be replaced. Once any maintenance is done the equipment should be examined by a competent person before using it (MCA, 2016)
Cranes: The annual inspections and periodical thorough examination shall be carried out. Inspection and maintenance should be carried out as per the Planned Maintenance schedule (P&IUK, n.d.)
The following things shall be inspected for signs of deformation, corrosion, cracks, etc
Crane Jibs
Winch and the foundation of the winch.
Goose neck, blocks, shackles, hooks, spider bands etc
Marking on the gear should be checked and clearly visible
locking arrangements of all shackles and blocks to be inspected
lubrication of all the parts should be carried out as per the lubrication plan in plan maintenance system
All wires shall be inspected for any damages
Hydraulic systems to be inspected for proper functioning
Blocks: Annual inspection of blocks to be carried out. Responsible Ships officer should carry out periodic inspection of the blocks on a periodical basis. Carry out the inspection and maintenance as per the PMS (P&IUK, n.d.)
Following checks to be carried out
Check for free movement of sheave heads and swivel
Check grooves on sheave for wear and tear
Check if any distortion or damage on side plate.
Check for any play in the axel pin
Check that the thread of the pin is in good order .
Check split pin and
Grease nipples and markings should not be painted .
Lubrication to be carried out as per the lubrication chart
Slings:(P&IUK, n.d.)
Slings should be annually inspected
Responsible Officer should inspect it before use
Periodic inspection should be carried out a per PMS
During these inspections the following shall be checked:-
Check if any broken strands, kinks and corrosion.
Check rings, thimbles, for damages, deformity and corrosion.
Slings should not be used if any signs of damage
Lubrication as per the manufacturer’s
Check the tags on sling and compare it with the certificate. A sling without a tag should not
Wires: Wire ropes should be inspected regularly and replaced if stands broken, kinked, worn, or corroded. They should be lubricated and renewed as per the PMS
Reference (MCA, 2016) (MCA, 2006) (STC, 2017) (P&IUK, n.d.)
We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.
Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.
Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.
Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.
Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.
Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.
We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.
Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.
You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.
Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.
Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.
From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.
Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.
Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.
You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.
You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.
Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.
We create perfect papers according to the guidelines.
We seamlessly edit out errors from your papers.
We thoroughly read your final draft to identify errors.
Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!
Dedication. Quality. Commitment. Punctuality
Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.
We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.
We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.
We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.
We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.