Automated Power Pole Photography via Helicopters

Accurate and effective asset condition management is important to ensure the longevity of an electric distribution network, while maximising its performance and operational efficiency.[1] At present, an efficient and cost effective method to test the integrity of a network, requires the use of a human-piloted helicopter and a photographer to capture high resolution images of power poles and their subcomponents [2]. Fugro-Roames, a company which currently provides this to its customers, aims to reduce the risk and cost associated with helicopter based pole top inspection, by replacing the photographer with an automated camera gimbal to capture high resolution pictures of the network.

Figure 1.1: Power Pole Photography [1]
Automated aerial asset management in the context of this proposal refers to the use of aerial platforms, to asses specific assets in an easy and cost-efficient manner, without the need of manual involvement. Unfortunately, and as it will be discussed in Chapter 3, the project topic is a form of technology that has not been widely researched; however, various methods of aerial asset management, such as helicopters, UAVs or drones, do exist and are currently in use within the industry.
2.1 Project Outline
It is the purpose of this project to develop a Receding Horizon Planner (RHP) in order to automate power pole photography using camera gimbal system. The RHP will based on the algorithms created by Dr. Michael Kearney, which provide a solution to the photograph feasibility, photograph scheduling, and gimbal trajectory planning problems [3]. For validation, the developed planner will be tested using simulation flight data provided by Fugro-Roames. Further testing will include the implementation of the RHP into a gimbal prototype, where sensitivity analyses and assessment of the initial assumptions will be completed to determine the project’s limitations and outline recommendations for future work. A more defined project plan will be described in Chapter 4 below.
2.2 Motivation for Automated Aerial Asset Management
In order to overcome the limitations associated with conventional asset management methods, a high resolution image capture system was developed and is now used to aid in the inspection, assessment and maintenance of electric distribution networks [4]. However, the overall cost associated with this method, outweights its improved efficiency, as it involves specialized labour (photographers) and the use of helicopters to complete the required task [5]. The motivation to introduce an automated aerial asset management system, requires for the reduction of risks and overall cost associated with the current model, as well as improving the quality and selection of photographs taken.
2.3 Project Aim, Objectives & Intended Scope
Since the project, and all information available, are sponsored and provided by FugroRoames, the aims and objectives have been defined by the company’s desires for the finished product. Therefore, the aim and proposed purpose of the project is to reduce the cost and risk associated with helicopter based pole top inspection, with the use of a Receding Horizon Planner (RHP) that automates the movement and control of a camera gimbal system. Along with the proposed project aim, multiple objectives must also be met whilts completing the work required. These include improving the algorithms created by Dr. Kearney, obtaining accurate efficiency gains for the RHP, designing and building a working gimbal prototype to be used for testing, and providing sufficient ground work for actual on-site testing and implementation, with the use of a helicopter, of the RHP beyond the project. Similar to the project’s aim and objectives, the intended scope has also been shaped by the company’s desires for the final product. Therefore, the scope can be outlined as:

Don't use plagiarized sources. Get Your Custom Essay on
Automated Power Pole Photography via Helicopters
Just from $13/Page
Order Essay

Review of background information and related work
Adaptation of algorithms created by Dr. Kearney
Development of Receding Horizon Planner
Design and build of a gimbal prototype
Planner implementation and testing
Analysis of results

Sensitivity analysis
Assesment of project’s assumptions

Evaluation of project and suggestion for future work
Possible gimbal rig implementation and on-site testing

Taking into account the scope described above, it seems logical to break the project into three specific sections; planner development and testing, prototype design and testing, and thorough result analysis. The development and testing of the Receding Horizon Planner involves the improvement of existing control algorithms, to implement and verify its overall efficiency, using available and provided data. The design and testing of the gimbal prototype, which should resemble the actual gimbal rig, involves the use of the developed Receding Horizon Planner to validate and improve previously obtained results. Finally, thorough result analysis requires the breakdown of the planner and obtained results, to find how assumptions, parameters and particular components were affetcted.
Although automated aerial asset management is a form of technology that has not been widely researched, the following chapter will provide a complete review of background literature which would closely resemble the general subject matter. The review will be broken into two sections; aerial asset management, and autonomous aerial photography and gimbal control. Previous work related to these topics will be presented, reiterated and reviewed, focusing on sources related to asset management within the electric power distribution industry.
3.1 Aerial Asset Management
Aerial asset management , within the electric power distribution industry, has been implemented to replace conventional asset management and inspection methods, and provide a fast and accurate way to determine any defects that could be present.
Whitworth et al. [6], in a work sponsored by EA Tecnology, propose the use of a helicopter-mounted camera to capture and store visual information, in order to enhance the inspection of overhead power lines. In order to reduce ‘camera shake’ and partially automate the inspection process, the authors recommend the use of an acquisition system, which finds and locks the camera to the location of the powerline, followed by a recursive algorithm that tracks the powerline smoothly, despite the translation of the helicopter.
Similarly, Earp et al. [1][4] describe an aerial inspection technique, which was also developed by EA Technology, that uses high resoluion images to perform a detailed condition assessment on electrical towers within a distribution network. The authors break down the helicopter based condition assessment, which is considered an improvement from the video inspection method in [6], to include four different parts:

Pre-flight Planning: Inspection requirements, photographic sequences, camera trajectories; as well as current wind and weather conditions, natural and man-made ground feature, and the locations of the electrical towers, are all taken into account during the pre-flight planning.
Helicopter Inspection and Picture Acquisition: A high resolution digital camera is used to take a set number of images, per tower, to meet the inspection requirements. Satellite-based Global Positioning System (GPS) and moving map displays are used to georeference each photograph taken, back to the tower.
Image Processing, Analysis and Condition Assessment: Captured images are examined and given a Condition Rating (CR), typically on a scale of 1 to 4 (1 describing best condition, 4 describing worst condition). The uniformity of the assessment, determined by the individual DNO’s requirements, is ensured by this critical step and therefore requires for a detailed condition assessment criteria, application-specific workstations, and accurate in-house training programme for assessors.
Condition Based Risk Management (CBRM): A process developed by EA Technology, it combines practical and theoretical knowledge about a specific asset, along with maintenance experience, in order to define its current condition.

Taking a different approach, N. Ellis [7] investigates the use of Unmanned Aerial Vehicles (UAVs) to inspect power transition lines. The author investigated the cost, risks and overall efficiency that comes with the use of UAVs, searching for low budget automation strategies to be designed and tested. Unfortunately, due to government regulations and the high capital and operating cost of the UAV, lead the author to the conclusion that the technology is not feasible at the current time.
As outlined by most of the sources presented, the introduction of aerial asset management techniques, has made a big improvement on the inspection, assessment and maintenance of an electrical distribution network. Whilst most models present techniques that far surpass conventional inspection methods, the cost that comes with the involvement of specialized labour and helicopters, leaves little room for errors and inconsistent results. However, although the implementation of an UAV was not possible due to the introduction of new risks, the automation techniques, presented in [7], can be applied to previously discussed aerial photography techniques, and mitigate/remove any currently involved risks.
3.2 Autonomous Aerial Photography and Gimbal Control
Autonomous aerial photography and control, within the electric power distribution industry, is not a topic that has been widely researched or implemented. However, the use of a camera and aerial images to predict and control the movement of UAVs is something that is commonly discussed and will therefore, be the main focus for this section.
E. Skjong et al. [8] investigate the recent commercial availability of UAVs within Search and Rescue (SAR) and Search and Tracking (SAT) applications. The authors then focus on the development of a SAT system, which is able to steer the UAV and focus the gimbal attitude on regions and objects of interest respectively, with the use of Model Predictive Control (MPC). The overall process is made autonomous by allowing computer vision to work directly with the UAV autopilot and MPC, so objects can be simultaneously detected and tracked in an efficient manner.
Similarly, C.E. Lin and S. Yang [9] explore the use of UAVs to detect and track specific objects, with the help of aerial photography and camera gimbal control. The authors implement the use of an Inertial Measurement Unit (IMU), which consist of a gyroscope, accelerometer, and magnetometer, along with an Attitude and Heading Reference System (AHRS), to determine and ensure that the angles of the camera gimbal are in the correct reference frame. Both [8] and [9] use Global Positioning System (GPS) to determine the location of both the UAV and the target, using this relationship to implement a reliable autopilot flight control for target detection and photography.
R.J. Rajesh and C.M. Ananda [10] move away from controlling the camera gimbal, attached to a UAV, and focus on stabilizing its movement to ensure that clear photograph and/or video footage is taken. The use of Proportional-Integral-Derivative (PID) controller is recommended by the authors, to compensate for the vibrations and gust, as well as control the position of the camera by stabilizing the movement of the gimbal. Manually tuning the controller’s parameters is not recommended, as the process is considered time consuming and tedious, instead, the authors recommend the use of Particle Swarm Optimization (PSO) as the preferred algorithm to complete this task.
Uncertainty and disturbances are mentioned, but not properly investigated in [9], [8] and [10]. A. Ashok et al. [11] investigate the external disturbances that affect the UAVs, as well as the dynamic and parametric uncertainties that arise in the mathematical autonomous model when subjected to a number of operating conditions. The authors reiterate previous approaches taken to design a robust control system, including the use of a PID controller for linear [12] and linearized [13] models, as well as the use of a Linear Quadratic Gaussian (LQG) controller [14] in the presence of uncertainties, before the Uncertainty and Disturbance Estimation (UDE) method is chosen to synthesize the required controller.
The control of a camera gimbal, as outlined by most of the sources above, is necessary in order to ensure the accuracy of photographs or video that is captured by the UAV. Although the use of conventional control methods is described above, only [8] focuses on the use of MPC, which is closely related to the project, to ensure that the UAV is able to detect and track objects efficiently and simultaneously.
A clear representation of the project’s tasks, has been outlined as a comprehensive project plan from the first to the final day of employment at Fugro-Roames. A visual representation and description of the plan is used to illustrate the timeline of the project, including all achievable milestones, which are related to the aims, objectives and intended scope of the project, discussed in section 1.2.
4.1 Visual Representation of Project Plan
The use of a modified GANTT chart was implemented to showcase the proposed flow of the project, from the first to the last day of employment. The timeline is hence separated into 24 weeks that are broken into 5 days, in the same manner as the business week format, where the project milestones and their corresponding tasks are allocated a precise number of days in which work is scheduled to take place.
Green solid bars represent the project’s milestones, where red solid bars indicate their respective tasks. The progress of the overall project is tracked by the completion of every achievable milestone, which can only be completed by first completing their respective sub tasks. Completed milestones are shown with a blue line through the green bar, and completed tasks are shown with a yellow line through the red bar.
Weeks 1 to 12, as shown in Figure 4.1, represent the core work to be completed, as Milestones 3-5 directly relate to the aims, objectives and intended scope of the project. Weeks 13 to 22, as shown in Figure 4.2, outline the analysis and completion of the final pieces of assessment, including the thesis report and demonstration, which require the content from previous milestones to be completed. Weeks 23 to 24, also shown in Figure 3.2, outline a possible Milestone that can be completed until the final day of employment at Fugro-Roames. This milestone does not affect the previous pieces of assessment; however, it will provide the company with important information that could prove vital to the future of the project.

4.2 Milestone & Task Breakdown
Milestone 1: Project Scope
The project scope is necessary to determine the project’s main objectives, and will therefore guide the work to be completed throughout the semester. To ensure all expectations are met, and the appropriate time is given to all project milestones, an agreement between academic and industry supervisors is necessary.

Task

ID

Days Description

Project evaluation

1.1

5

Evaluate the requirements of the project, including potential goals and outcomes. Collect all necessary information to present during the supervisor meeting.

Supervisor meeting

1.2

1

Meet with the project’s academic and industry supervisors to discuss the project scope, and agree on the due dates for all pieces of assessment.

Scope confirmation & agreement

1.3

2

Compile a detailed scope which highlights the project’s objectives, as discussed during the supervisor meeting.

Resources

Workspace with an available computer
Availability from both supervisors to organize a meeting

Milestone Hazards and Risks
Milestone 1 is essential to the project. Any delay could be considered a minor, but possible risk, as it affects the progress of the overall project. If this issue becomes bigger, and the project scope cannot be defined, then it can be classified as a major risk and mitigation strategies should be taken immediately.
Clear communication between all parties involved, can reduce and remove the possibility of the identified risks from occurring.
Milestone 2: Project Proposal
The project proposal is the first piece of assessment, which must be completed as part of the responsibilities for completing the project placement. The report highlights the work from Milestone 1, as it expands on the agreed aims and objectives, outlines the background information related to the project’s main topics, and presents a visual and a clear representation of the project plan. A detailed OH&S risk assessment, which analyses the potential risk involved with the project’s practical work, and any potential equipment used, will also be included in the proposal.

Task

ID

Days Description

Research of relevant material

2.1

5

Find background information and prior art related to the project’s main topic.

Project outline and intended scope

2.2

4

Expand on the project’s scope decided in Task 1, expanding on the project’s aims and objectives.

Background and related work

2.3

3

Summarize and expand on the material obtained from Task 2.1.

Project plan summary

2.4

3

Provide a detailed project plan, with logically ordered tasks and their respective milestones.

OH&S risk assessment

2.5

2

Compile an OH&S risk assessment, which highlights the project’s practical work and equipment used.

Drafting and submission

2.5

5

Assemble the proposal’s individual sections, review the written report and submit via
Turnitin.

Resources

Completion of Milestone 1
Confirmation of university assessment due dates
OH&S risk assessments, regarding the use and control of the gimbal rig

Milestone Hazards and Risks
The project proposal relies mostly on individual and previously completed work, however, certain sections require resources which are not readily available. The most significant obstacles, which would require mitigation, are the confirmation of all university assessment due dates and the risk assessments completed for the gimbal rig, which might be used during the project.
Clear and constant communication with the university’s course coordinator, as well as the personnel in charge of the gimbal rig, is essential to mitigate and prevent any issues that could affect the completion of the project proposal.

Milestone 3: Receding Horizon Planner
Milestone 3 is the first milestone that uses the algorithms created by Dr. Kearney to develop an on-line planner that controls the photograph scheduling plan and the movement of the gimbal throughout the event horizon. The completed Receding Horizon Planner will involve the use of a low level controller, an upper level planner, and an event monitor, to be used in Milestones 4→7.

Task

ID

Days Description

Algorithm testing and improvement

3.1

5

Improve the current photograph feasibility algorithm, and test its efficiency.

Model predictive control research

3.2

5

Find related material to be used when designing the Receding Horizon Controller.

Lower level controller design & implementation

3.3

5

The gimbal and camera are robustly controlled by the photograph scheduling algorithm chosen by the upper level planner.

Upper level planner design & implementation

3.4

5

Implemented the improved algorithm from Task 3.1 to generate a plan that the system will follow over a prediction horizon.

Event monitor design & implementation

3.5

4

Connect the results from Tasks 3.3 and 3.4 so that the plan is implemented and changed after certain events occur.

Resources

Programming and modelling software
Access to the project’s repository and previous work

Milestone Hazards and Risks
The progress of Milestone 3 could be significantly affected, if access to the necessary repositories and previous work is delayed. As previous algorithms are necessary to the development of the Receding Horizon Planner, the completion of the project would be significantly impacted.
Clear communication with the right personnel can help mitigate this issue before it affect the timeline and progress of the project.

Milestone 4: Planner Analysis and Improvement
Rigorous testing of the developed Receding Horizon Planner is required to find the necessary efficiency gains, so the planner can be implemented on the project’s physical equipment. Data obtained from Fugro Roames, as well as the analysis and reiteration of the testing completed, will be completed to improve the found controller gains.

Task

ID

Days Description

Test current and new
scenarios

4.1

4

Implement the Receding Horizon Planner on several simulated scenarios, using data received from Fugro Roames.

Reiteration of Receding Horizon Planner testing

4.2

3

Fix any errors found in Task 4.1 and repeat the tests.

Determine accurate efficiency gains

4.3

3

Determine the required controller gains which provide the most accurate results.

Resources

Completion of Milestone 3
Sufficient testing data provided by Fugro Roames

Milestone Hazards and Risks
The lack of testing data used to complete this milestone, is a minor risk that could affect the project. Requesting said data ahead of time, would ensure that it is ready for when testing of the Receding Horizon Planner begins, leaving the project timeline unaffected.

Milestone 5: Gimbal Prototype
Milestone 5 marks a key point in the project, as the implementation of the Receding Horizon Planner on a working prototype is essential to the project’s success. The design of the prototype will be based on the actual gimbal rig owned and created by FugroRoames, to facilitate the implementation of the planner for further testing, at the end of the project.

Task

ID

Days Description

Embedded system design and build

5.1

7

Design, build and combine the mechanical, electrical, and software components of the prototype.

Implementation of
Receding Horizon Planner

5.2

6

Test the Receding Horizon Planner using the gimbal prototype.

Sensitivity Analysis

5.3

5

Identify and vary the dominant parameters, testing and improving the Receding Horizon Planner where possible.

Resources

Completion of Milestone 4
Mechanical, electrical and software design software
Working space and necessary build equipment
Development of testing scenarios

Milestone Hazards and Risks
Milestone 5 introduces the use of practical equipment to design, test and build each component of the gimbal prototype. The misuse of the practical equipment, and the lack of component testing, are immediate risks to the completion of the prototype. Following the risk assessment outlines on Chapter 4, as well as completing the required testing before the Receding Horizon Planner is implemented, can help mitigate the risks described and prevent possible delays.

Milestone 6: Assessment of Project’s Assumptions
As previously shown by Dr. Kearney, on the initial report he completed for Fugr-Roames, the introduction of the Receding Horizon Planner required changes to the initial assumptions made when designing the project’s photograph allocation and gimbal control algorithms.
The change and/or the addition of assumptions, by analysing the project’s missing parameters is, therefore, also essential when validating the results obtained in Milestone
5.

Task

ID

Days Description

Identify missing parameters

6.1

2

Determine the project’s missing parameters based on the assumptions made by Dr.
Kearney on his report.

Evaluate the effects of missing parameters

6.2

3

Assess how the model is affected by each missing parameter.

Update the project’s assumptions

6.3

2

Compose a list of updated assumptions based on the results from tasks 6.1 and 6.2, to be used on further work.

Resources

Completion of the Sensitivity Analysis Task within Milestone 5

Milestone Hazards and Risks
The risks to Milestone 6 are relatively small, where the largest possible problem involves the inability to identify the effects of the project’s missing parameters. Keeping a record of all parameter changes/assumptions made during previous tests is the best solution to mitigate/prevent this issue.
Milestone 7: Project Evaluation and Recommendation for Future Work
Identifying the project’s limitations is an important process, as it allows recommendations for future work to be made and included on the final thesis report.

Task

ID

Days Description

Identify project’s limitations

7.1

3 List the project’s limitations, based on the results from Task 6.

Develop accurate recommendations

7.2

3 Expand on previous work and results from Tasks 6.1 to 6.3, including 7.1, to develop accurate recommendations for future work.

Resources

Development of the Receding Horizon Planner
Sensitivity analysis of the gimbal prototype
Completion of Milestone 6

Milestone Hazards and Risks
The completion of Milestone 7 is only affected by the work done in previous milestones. If previous tasks are delayed, any future recommendations run the risk of not being completed.
To prevent this from affecting the final stages of the project, the plan/timeline outlined should always be followed, noting wher
 

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy