Read the “Beck Manufacturing” case study in Chapter 8 of your text. In a three-page paper, address the following:

Calculate the capacity of each machine center and the capacity of the system.

Analyze where the focus of the company’s efforts should be if Beck wants to expand capacity. Determine how much extra capacity he can get without causing another operation to become the bottleneck.

Suggest ways Beck can expand capacity without purchasing new equipment.

Your paper should be in paragraph form (avoid the use of bullet points) and supported with the concepts outlined in your text and additional scholarly sources.

Submit your three-page paper (not including the title and reference pages). Your paper must be formatted according to APA style and must cite at least three scholarly sources in addition to the textbook.

Week 4:

 

Week Guidance

(Chapters 7 and 8) 

NOTE: If you did not start on your final project last week, then start this week (please read the directions and the grading rubric CAREFULLY).  Go to week 6 and read about the final project.  You will analyze a case/company using several pages (10-12 for the body only, you will need a title page & reference page and they should be perfect).  You need to think about how you will present all information in this paper.  Do you know how to add first and second level headers to your paper?  You should have at least 5 or more outside readings (scholarly–not all material from the library is scholarly) to go along with the book material (how many sources are you to use?) The more outside readings you have the easier it will be to put the paper together.  If you used scholarly sources on the discussion board, reuse them if necessary. You will put as much new material (5-6 or more new items of material from this class like forecasting, productivity, strategy, SWOT, etc.) in your paper as possible.  Please try to stay within the length guidelines. If you have question please let me know.  Waiting until the last week of class to put this paper together is not a wise move!  Remember, it cannot be late.  Please follow all directions carefully; it is worth a large portion of your total grade for the six weeks.  I will grade hard, but that should not be a problem for anyone because I hope I have you trained well in this area.  

Chapter 7  

Video:

 

Facility Location refers to the location of a service or manufacturing facility with respect to customers, suppliers and other existing facilities such that it allows the company to gain a competitive and/or strategic edge. In making a location decision, both tangible costs such as the cost of operating the facility, cost of land (if it applies), cost of labor, taxes, utilities and the cost of inbound and outbound transportation, and intangible costs such as availability of qualified labor, and labor climate must be considered.   Since the location decision usually involves making a large capital investment, it not only influences the firm’s ability to compete but also has long-term strategic implications. Therefore, in making the location decision, we should consider issues related to marketing, production, transportation and other relevant costs as well as the strategy of the organization. The importance of various factors in relation to the location decision will vary between service and manufacturing organizations but from industry to industry as well. 

Chapter 8  

Video:

https://youtu.be/_GkxWZF_Kwc
                                                    

Capacity is an upper bound on the road that a facility or a plant can serve or manufacture. We measure the capacity of a plant, machine department, worker, hospital, etc., either in terms of output (number of units or number of pounds manufactured) or in terms of input (number of machine hours or machines needed to satisfy demand). 

Capacity planning refers to the activities of the firm in determining the capacity of a plant or a facility in terms of equipment, machines, space, workers and processes based on the resource constraints of the facility. In other words, a major function of capacity planning is to match the capacity of the machine or facility with the demand for the products of the firm.  

Capacity planning can be classified into three planning horizons:

 

1.         Long range                  

2.         Medium range             

3.         Short range

 

The amount of time covered by each of the above planning horizons can vary from industry to industry. Therefore, the lines of demarcation between the three different levels of planning horizons can be very imprecise. Nevertheless, the long range planning generally considers planning horizons of one year or longer. A time period of one year or longer is needed to provide sufficient time to build a new facility, to expand the existing facility or to move to a new facility due to foretasted changes in demand. 

Medium range capacity planning horizon ranges approximately from one month to six months. At this level of planning, decisions or activities include acquisition of a major piece of machinery and subcontracting.

Short range planning horizon covers capacity planning activities on a daily or a weekly basis and are generated as a result of dis-aggregation of the long or medium range capacity plans. These activities include machine loading and detailed production scheduling.   

The main quantitative technique covered is cost-volume analysis.

Week 4 Assignment – Beck Manufacturing and Plant Capacity

PLEASE DO NOT SUBMIT A BID FOR THIS ASSIGNMENT IF YOU DO NOT HAVE EXPERIENCE WITH GRADUATE LEVEL WRITING TERMS AND CONCEPTS. ALL DIRECTIONS MUST BE FOLLOWED AND NO PLAGIARISM. MY SCHOOL USES SOFTWARE TO DETECT COPIED MATERIAL.

Read the “Beck Manufacturing” case study in Chapter 8 of your text. In a three-page paper, address the following:

· Calculate the capacity of each machine center and the capacity of the system.

· Analyze where the focus of the company’s efforts should be if Beck wants to expand capacity. Determine how much extra capacity he can get without causing another operation to become the bottleneck.

· Suggest ways Beck can expand capacity without purchasing new equipment.

Your paper should be in paragraph form (avoid the use of bullet points) and supported with the concepts outlined in your text and additional scholarly sources.

Submit your three-page paper (not including the title and reference pages). Your paper must be formatted according to APA style and must cite at least three scholarly sources in addition to the textbook.

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 1/55

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 2/55

7

©

iStockphoto/Thinkstock

Facility Location and Process Selection

Learning Objec�ves
A�er comple�ng this chapter, you should be able to:

Discuss loca�on as a strategic decision.
Discuss the quan�ta�ve and qualita�ve factors influencing loca�on decisions.
Integrate qualita�ve and quan�ta�ve factors to make effec�ve loca�on decisions.
Describe how loca�on influences other opera�ng decisions.
Describe the process selec�on decision and how it is influenced by the volume of product demanded.
Define the different process types: line flow, batch flow, flexible manufacturing system, manufacturing cell, job
shop, and project.
Construct a cost-volume-profit model of a firm, and understand how to use the model to manage the firm.
Calculate the break-even point for cases involving both single- and mul�ple-product breakeven.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 3/55

Fast-food restaurants, hotels, hospitals, and gas sta�ons are o�en located on heavily traveled
roadways in order to provide customer convenience and accessibility.

©age fotostock / SuperStock

7.1 Facility Location

The previous chapters in this book have provided an understanding of what opera�ons are, why they are important, how they can be used to create compe��ve
advantage, how they impact key business elements such as cost and quality, and how they relate to suppliers. This chapter provides some organiza�onal context for
the study of opera�ons.

The purpose of an organiza�on is to manufacture a good or provide a service, and opera�ons play a key role. This begins with designing the produc�on system,
which includes:

1. Designing a product, which was discussed in an earlier chapter
2. Determining where and how the product will be created (loca�on and process)
3. Se�ng the capacity of the organiza�on

There are other decisions involved in designing the system that produces these goods and services, such as how to lay out and organize the facility and design the
individual jobs that employees must perform. However, these topics are beyond the scope of this text.

Facility loca�on is the placement of a facility with regard to a company’s customers, suppliers, and other facili�es with which the company interacts. The loca�on
decision usually commits substan�al resources and cannot be easily changed. Many of the principles and techniques used in loca�ng a facility are the same
whether an organiza�on is selling fried chicken or groceries, provides fire protec�on or health services, stores electronic parts or food, or makes computer chips or
paper. Managers making the decision should consider the costs of opera�ng at a par�cular loca�on, including costs to acquire the land and build the facility, as well
as costs for labor, taxes, and u�li�es. They should consider the convenience of a par�cular loca�on for customers as well as the cost to transport materials to the
facility and move finished product from the facility. Managers should also consider access to banking, educa�onal, and other ac�vi�es that are important to the
success of their organiza�on. Thus, many factors, both quan�ta�ve and qualita�ve, influence the loca�on decision. Quan�ta�ve factors are easily measurable, while
qualita�ve factors are more subjec�ve.

What o�en differs from one industry to another are the weights assigned to these various factors. The size of the weight assigned to a factor indicates its
importance. For example, a primary factor in loca�ng a fire sta�on is its response �me to the buildings within that fire district. Thus, response �me should be
assigned a large weight. When loca�ng a restaurant, easy customer accessibility may be more important than the cost to transport raw material (food and
beverages) to the facility. An organiza�on producing solar cells may feel that it is very important to locate in an area close to a university or research park that
specializes in key technology. Organiza�ons that produce plywood, dimensional lumber, or paper need a readily available supply of wood, so they usually locate
near �mber resources. Managers of labor-intensive opera�ons may feel that low labor cost is the cri�cal factor that determines the loca�on of their facility.

Location as a Strategic Decision

The loca�on decision usually involves commitment of a large capital investment that cannot be moved. As a result, loca�on should be viewed as a long-term,
strategic decision because it will have a major impact on the organiza�on’s ability to compete. The loca�on decision should not be based solely on marke�ng
issues, produc�on factors, or transporta�on costs. Successful managers integrate the relevant factors and weigh them appropriately in order to make the best long-
term decision for the organiza�on.

This long-term commitment should fit with the organiza�on’s overall
strategy. In some cases, organiza�ons develop marke�ng and opera�ng
strategies that have an impact on the loca�on decision. A regional facility
strategy requires that each produc�on facility has a defined marke�ng
area and each facility produces a complete line of products for that area.
This is o�en done when customer convenience and access are important,
or when outbound transporta�on costs are very high. Fast-food
restaurants, instant oil change opera�ons, hospitals, and branch banks are
examples of opera�ons located to provide maximum customer
convenience and access. Many customer-oriented service opera�ons are
located in this way. Bo�le making, corrugated box produc�on, and
aluminum can making opera�ons are examples of facili�es that are located
by region to keep outbound transporta�on costs low. These finished
products have high shipping costs because they occupy a lot of space—
shipping a can to the beverage company means shipping a lot of empty
space. When these low-value finished products are shipped long distances,
transporta�on costs increase the cost of the product, making the company
less price compe��ve.

A product facility strategy means that one facility is responsible for
producing one product or product line and shipping that product throughout the country and the world. This approach is appropriate when the produc�on process
is complex and hard to control, such as making ceramic heat shields for spacecra�. It can be used when a firm does not want to duplicate expensive equipment,
facili�es, and highly trained personnel. This approach is also popular when there are advantages to specializa�on and economies of scale, and when transporta�onProcessing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 4/55

costs are not prohibi�ve. The produc�on of igniters for jet aircra� engines, for example, would benefit from a product facility strategy. This item is small, so
shipping costs are low. An igniter is high in value, so shipping cost, as a percent of purchase price, is also small.

Manufacturing Location Factors

There are differences in the loca�on decision for manufacturers and service providers. Manufacturing firms consider a variety of factors.

Quan�ta�ve factors for manufacturers include:

Labor costs
Material costs
Transporta�on
U�li�es, taxes, real estate costs, and construc�on costs
Government incen�ves

Qualita�ve factors include:

Labor climate
Quality of life
Proximity to customers and markets
Proximity to suppliers and resources

Service Location Factors

In service opera�ons, many of the factors iden�fied with manufacturing are s�ll relevant. In most service opera�ons, service providers would consider labor cost,
taxes, real estate costs, construc�on costs, and government incen�ves as important elements in a loca�on decision. On the other hand, material cost and
transporta�on costs would be relevant for only some service providers, such as restaurants and retail opera�ons that purchase, transport, and resell goods. U�lity
costs are not a significant factor for most service opera�ons because consump�on is generally low compared to manufacturing. The qualita�ve factors listed for
manufacturers are likely to be relevant for service providers, with the excep�on of proximity to suppliers and resources. This is because materials and component
parts are not always shipped from suppliers.

If a business has customers that u�lize a service facility in person, being close to customers is very important. For example, retail opera�ons require this proximity
to the customer, but a call center can be located anywhere in the world. Customers o�en place a high value on their �me, therefore, convenience is essen�al.
Transporta�on costs are important for warehousing and distribu�on, but response �me—the �me elapsed between a request for service to the delivery of that
service—may be even more important. If travel distance and �me are short, total inventory in the system can be kept very low. In some cases, the trip from
producers to the distribu�on center to the retail store can be one day or less.

Loca�on of compe�tors may also be an important factor for service opera�ons. In some services, such as newspaper publishing, having compe�tors in the
immediate area o�en has a significant nega�ve impact on sales. In others, service providers tend to cluster together. In many cases, they adver�se together. Nearly
every medium-size town and large city has an “auto mile” or “auto strip” where one of every car dealer is located. The idea of such a loca�on is to create a cri�cal
mass, so customers can quickly and easily compare products from different dealers. Fast-food restaurants will o�en locate in similar clusters. These clusters are
caused to some extent by the need to deal with customer choice. For example, in a large group of poten�al customers, some will want pizza, some will want
burgers, and others will want chicken. Fast-food chains locate their restaurants near high-volume ac�vi�es, such as large shopping malls, sport centers, and
expressway exits in large urban areas.

The loca�on of emergency units, such as fire protec�on and ambulance service, is determined by minimizing response �me, providing minimum coverage, and
opera�ng from a mobile loca�on. Response is important when �me is a cri�cal factor. The objec�ve is to locate a facility so that the maximum response �me to
any point served by the emergency unit is minimized.

Minimum coverage implies that all customers have a minimum level of coverage. For example, no house in the city will be more than one mile from a fire sta�on
or an ambulance service. The number and placement of facili�es required to provide minimum coverage can be determined by grouping customers into appropriate
popula�on centers and examining candidate facility loca�ons to see if the minimum coverage is provided. This can be accomplished by lis�ng the popula�on
centers in the columns of a table and lis�ng the poten�al facility loca�ons in the rows of the same table. Then, each poten�al facility can be judged to determine if
the minimum coverage is achieved. In many cases, more than one candidate facility may be required to provide that coverage.

Government Incentives

Many states and local governments have been very aggressive in their efforts to a�ract new businesses. One incen�ve offered by state and local governments is a
significant reduc�on in property taxes. They have also offered low-interest loans, provided free training to workers, and subsidized wages for a specified period of
�me. In addi�on, many states and ci�es have established agencies that can help private industry slice through governmental red tape. In some cases, state and
local governments have put together parcels of land by using their powers of eminent domain. Simply stated, eminent domain means that an owner can be forced
to sell property to the government at fair market value if it will be used for the good of all. Once obtained, proper�es are sold to private industry for development.
Governments can acquire property more quickly and less expensively than private industry can. As soon as word gets out that private industry is interested in
developing an area, the land prices are sure to increase significantly. With the power of eminent domain, the government can avoid being delayed by owners of
key parcels.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 5/55

In some cases, businesses that have been in a state for years are grumbling about the preferred treatment given to newcomers, and some states are beginning to
wonder if the jobs created are worth the costs of the incen�ves. Despite this, bidding wars among states for the jobs these new developments bring are likely to
con�nue. The pressure on elected officials to create jobs in the short term seems to mask the long-term impact that this treatment may have on future revenues
and expenses of the state.

Highlight: Changing Loca�ons for Automo�ve Assembly

For many years, automobile assembly plants were located in the Midwest, and new facili�es were built in this region in order to provide good, low-cost access
to a large percentage of the North American popula�on. As the popula�on has increased in the South and Southwest, many automobile companies—especially
foreign producers—have located new assembly facili�es in the South to take advantage of lower labor costs, lower construc�on costs, cheaper land, and
government incen�ves. Alabama persuaded Mercedes-Benz to build an assembly facility for making sport u�lity vehicles. Honda opened a facility in Lincoln,
Alabama, that employs more than 2,000 people to make its Odyssey minivan. Toyota has constructed an engine assembly facility in Huntsville, Alabama.
Hyundai Motor Company of South Korea has built a final assembly facility in the South.

These efforts have cost Alabama nearly $700 million in incen�ves. Cri�cs argue that the state has not received sufficient return on its investment. Also, these
investments have taken money away from schools and services, and made it difficult for the state to provide tax relief for its low-income residents. Proponents
argue that these efforts are “Alabama’s new day.” Other companies are inves�ga�ng the poten�al that Alabama has to offer.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 6/55

State and local governments offer incen�ves such as tax breaks,
low-interest loans, and help cu�ng through red tape to a�ract
and retain businesses and jobs.

©Photodisc/Thinkstock

7.2 Evaluating Locations

The factors that must be weighed when evalua�ng loca�ons are grouped into three subsec�ons: (1)
managing the quan�ta�ve factors, including the impact of loca�on on cost and the increasing
importance of government incen�ves; (2) describing the qualita�ve factors and illustra�ng how these
can be analyzed as well as integrated with the quan�ta�ve factors; and (3) discussing the effects of the
loca�on decision on other opera�ng factors.

Managing Quantitative Factors

Quan�ta�ve factors include the costs associated with facility construc�on, produc�on, overhead, and
transporta�on to and from the facility. State and local governments offer incen�ves to a�ract and retain
businesses and jobs. Such incen�ves include tax abatement, low-interest loans, help in cu�ng through
red tape, low business taxes, and low rates for unemployment insurance and worker’s compensa�on.
Finally, the loca�on can affect sales volume and selling price. The announcement of a new facility may
ini�ate price-cu�ng or other costly product promo�on ac�vi�es by exis�ng compe�tors in the area.

Loca�on decision plays an important role in shaping the cost func�on. The total-cost equa�on is:

TC = (VC)X + FC

where

TC = total cost

VC = variable cost per unit

X = the number of units produced

FC = fixed costs

Variable costs are affected by prevailing wage rates, material costs, u�lity rates, and transporta�on costs for incoming materials and outgoing finished products.
Fixed costs are affected by construc�on and land costs and the cost of administra�on, all of which are likely to be lower in rural areas. There also may be tax
incen�ves or other special considera�ons for a par�cular site.

To prepare cost es�mates for a site, data are collected and analyzed. To illustrate, Table 7.1 contains data for a site in Indianapolis, Indiana, for a facility to build
computer control panels. These data can be used to prepare a pro forma opera�ng budget.

Table 7.1: Data for site in Indianapolis, Indiana

Produc�on Costs

Type Rate Projected Usage

Labor Welding
Electrical
General assembly

$10.00/hr.
$12.00/hr.
$9.00/hr.

0.5 hrs./unit
0.3 hrs./unit
1.1 hrs./unit

Material Sheet metal
Threaded fasteners
Electrical wire

$.40/lb.
$2.00/100
$.06/lineal �.

100 lbs./unit
20/unit
70 lineal �./unit

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 7/55

U�li�es

Natural gas

Electricity

$4.00/1,000 cu. �.
$.06/kilowa� hr.

500 cu. �./unit
200 kilowa� hrs./unit

Transporta�on* In rail
In motor carrier
In motor carrier
Out motor carrier

$.03/lb. (sheet metal)
$.04/lb. (fasteners)
$.04/lb. (wire)
$20/unit (finished)

100 lbs./unit
5 lbs./unit
4 lbs./unit
1

Facility Overhead Ini�al Investment
Land acquisi�on costs
Building construc�on
Plan start-up costs
Ini�al employee training

$2,100,000
$175,000,000

Special Considera�ons Tax abatement
Low-interest loans
Supplementary training expenses

$25,000,000

*Rates are given from specific origin to a specific des�na�on, so distance has been accounted for.

Table 7.1 contains projected labor, material, and u�lity usage in addi�on to the rates. U�li�es may have both fixed and variable components. Some u�lity costs are
variable and directly linked to producing a product, such as the power required to run a drill press. In other cases, u�lity costs cannot be linked to a product. An
example is the energy needed to heat a building. The amount of heat required is not related to the number of units produced. Table 7.1 shows variable u�lity
costs. The fixed component of u�li�es is included in overhead expenses. Transporta�on costs are a func�on of the quan�ty of materials shipped, the distance
traveled, and the type of carrier used.

Table 7.1 also lists as a lump sum an es�mate of facility overhead expenses, such as supervisors, material handling, and plant management staff. The value of the
investments in the facility and the value of any special considera�ons are also listed as lump sums. The special considera�ons figure is shown as a savings that
should be deducted from the ini�al investment.

Table 7.2 shows a pro forma opera�ng budget based on producing 45,000 units per year at the site described in Table 7.1. An opera�ng budget usually does not
include capital costs for facili�es. The costs of making products at this facility can now be es�mated. Considering only the variable costs, the unit variable cost is
calculated as follows:

Unit variable cost
= $100.46/unit

The cost including a share of the annual facility overhead is:

Cost with overhead
= $147.13/unit

*Throughout this text, to enlarge the size of the math equa�ons, please right click on the equa�on and choose “se�ngs” then “scale all math” to increase the
viewing percentage.

Table 7.2: Pro forma opera�ng budget for one year based on es�mated sales of 45,000 units

Labor
Welding
Electric
Assembly
Total Labor costs

($10.00/hr.)(0.5 hrs./unit)(45,000 units)
($12.00/hr.)(0.3 hrs./unit)(45,000 units)
($9.00/hr.)(1.1 hrs./unit)(45,000 units)

$ 225,000
162,000
445,500
$ 832,500

Material
Sheet metal
Fasteners
Wire
Total material costs

($.40/lb.)(100 lbs./unit)(45,000 units)
($2.00/100)(20/unit)(45,000 units)
($.06/lin. �.)(70 lin. �./unit)(45,000 units)

$ 1,800,000
18,000
189,000
$ 2,007,000

U�li�es
Natural gas
Electricity
Total u�lity costs

($4.00/1,000 cu. �.)(500 cu. �./unit)(45,000 units)
($.06/kwh)(200 kwh/unit)(45,000 units)

$ 90,000
540,000
$ 630,000

Transporta�on
Sheet metal
Fasteners
Wire
Finished product
Total transporta�on costs

($.03/lb.)(100 lb./unit)(45,000 units)
($.04/lb.)(5 lb./unit)(45,000 units)
($.04/lb.)(4 lb./unit)(45,000 units)
($20.00/unit)(45,000)

$ 135,000
9,000
7,200
900,000
$ 1,051,200

Variable costs
Facility overhead*
Grand total

$ 4,520,700
2,100,000
$ 6,620,700

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 8/55

*Some overhead costs can be variable, but to simplify the discussion in this case, we will assume all overhead costs are fixed.

Comparing Quantitative Factors

To make effec�ve loca�on decisions, management must organize the poten�al costs and revenues for each site in a way that allows them to be easily compared.
Begin by examining the cost data for the Indianapolis site (detailed in Tables 7.1 and 7.2), and for an alterna�ve site in Lexington, Kentucky. The new facility is
scheduled to produce 45,000 units per year. The costs for both sites are summarized here. (The incen�ves are to be subtracted from the ini�al investment.)

Indianapolis Lexington

Variable Costs $100.46/unit $95.77/unit

Annual Overhead Cost $2,100,000/year $1,900,000/year

Ini�al Investment $175,000,000 $168,000,000

Incen�ves $25,000,000 $10,500,000

Several assump�ons are made including: (1) revenue is not affected by either choice; (2) sales volume per year, selling price, unit variable costs, and fixed costs do
not change over the period in ques�on; and (3) the �me value of money is ignored. The �me value of money is the no�on that one dollar received today is worth
more than one dollar received at some future point. One dollar received today can be invested and earn a posi�ve return, thereby making its value greater than
one dollar.

Problem

Compare the costs of the Indianapolis and Lexington sites over a five-year period, using the total-cost equa�on. (The subscript I stands for Indianapolis and the
subscript L for Lexington.)

TC = (VC)X + FC

TCI = ($100.46/unit)(45,000 units/year)(5 years) + ($2,100,000/year)(5 years) + $175,000,000 – $25,000,000

= $22,603,500 + $10,500,000 + $150,000,000

= $183,103,500

TCL = ($95.77/unit)(45,000 units/year)(5 years) + ($1,900,000/year)(5 years) + $168,000,000 – $10,500,000

= $21,548,250 + $9,500,000 + $157,500,000

= $188,548,250

Over a 5-year period, Indianapolis has a lower total cost.

At what point in �me will the costs of these two sites be equal? In this case, X will represent the number of years un�l costs are equal. This informa�on may
be very useful for managers when choosing between the alterna�ve sites.

TCI = TCL

(100.46)(45,000)X + 2,100,000X + 175,000,000 – 25,000,000 = (95.77)(45,000)X + 1,900,000X + 168,000,000 – 10,500,000

$4,520,700X + $2,100,000X + $150,000,000 = $4,309,650X + $1,900,000X + $157,500,000

$6,620,700X – $6,209,650X = $157,500,000 – $150,000,000

$411,050X = $7,500,000

X = 18.25 years

Check the answer by subs�tu�ng the �me X into the cost equa�ons for Indianapolis and Lexington and seeing if the costs are equal.

If the amount sold per year is allowed to vary, the point of equal costs could be viewed in a different way. In the model, the number of years could be a
constant, and the number of units sold per year could become a variable. If the �me period is set at five years, how many units must be sold each year if
costs are equal? Here, the variable X represents the number of units sold each year.Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 9/55

TCI = TCL

(100.46)(X)5 + (2,100,000)5 + 175,000,000 – 25,000,000 = (95.77)(X)5 + (1,900,000)5 + 168,000,000 – 10,500,000

X = 277,186 units/year

Including Qualitative Factors

Qualita�ve factors do not usually have measurable, direct effects, but they do need to be carefully considered and integrated into the decision by management. The
chapter 7 appendix contains a sample list of some of the qualita�ve factors that could be considered such as labor climate, cultural ac�vi�es, and weather.

To integrate qualita�ve factors into the loca�on decision, managers should:

1. Decide which factors are relevant
2. Weigh each of the factors—some may be more important than others
3. Evaluate each site so that ra�onal comparisons can be made

Unless a manager makes a judgment about the importance of each factor, all the factors are assumed to have equal weight. These weights are usually selected
prior to determining the rankings or raw scores so that the scores do not bias the weights. The weights are mul�plied by the scores to determine the weighted
scores. Then, the weighted scores are added together to determine total scores.

Problem

A commi�ee has determined that the following factors are relevant to the decision. Indianapolis and Lexington are ranked on a scale of 1 to 10, with 10 being
most desirable. The rankings are subjec�ve es�mates.

Factor Weight Indianapolis Raw Score Lexington Raw Score

Recrea�onal ac�vi�es 20 8 7

University research facili�es 40 8

8

Union ac�vity 40 4 7

Banking services 80 7 6

Available labor pool 60 7 5

The rankings can eventually be added; 10 is considered “good” in all cases, but a ten may not indicate more of that factor. For example, a 10 in university
research ac�vi�es is desirable and indicates high levels of research; a 10 in union ac�vity is also desirable, but may indicate low levels of union ac�vity.

Mul�ply the weight by the raw score for both Indianapolis and Lexington.

          Indianapolis           Lexington

Weight Raw Score Weighted Score Raw Score Weighted Score

Recrea�onal ac�vi�es 20 8 160 7 140

University research facili�es 40 8 320 8 320

Union ac�vi�es 40 4 160 7 280

Banking services 80 7 560 6 480

Available labor pool 60 7 420 5 300

Total 1,620 1,520

As long as the same weights are applied to each loca�on, the weighted scores are comparable. The absolute value of each score does not have meaning, but
comparing total scores is useful.

If Indianapolis is superior in profit and investment, then the choice between the two loca�ons is easy because Indianapolis also has a slight qualita�ve edge. If
Indianapolis is not superior in profit and investment, then management should judge the impact of these qualita�ve factors on the long-term success of the
organiza�on. Even though a mathema�cal model can be used to analyze the data, the results must s�ll be interpreted and a decision made.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 10/55

On-Site Versus Off-Site Expansion

Loca�on can have a significant impact on an organiza�on’s ability to compete. It can influence costs, selling price, demand, educa�onal opportuni�es for employees
and their families, and access to financial services. How can the loca�on decision affect other factors in produc�on?

Assume that demand for an organiza�on’s product exceeds present capacity. An organiza�on can consider two op�ons to increase capacity: build addi�ons to the
exis�ng plant on-site, or design and build a new plant in another loca�on. On-site expansion is more popular because it usually involves less capital investment.
Many services, such as shipping, receiving, and administra�on, may not need to be expanded. Only the cri�cal opera�ons— that is, the bo�lenecks—require
capacity increases.

However, on-site expansion can create many problems, especially if it is a repeated prac�ce. As more produc�on space is added, material handling and storage
become more difficult because inventory space is o�en converted to produc�on. As new product varia�ons are added, the once simple product flow becomes
complicated or stymied because plant addi�ons o�en occur over many years and no long-term planning for future addi�ons is made. When on-site expansion is
used to increase capacity, intra-plant transporta�on and communica�on can become strained.

Staying at the same site o�en postpones the introduc�on of new product and process technologies. Old equipment and old produc�on methods are used longer
than they should be. Future product innova�on, produc�vity increases, quality improvements, and cost reduc�ons can be nega�vely affected. On-site expansion can
mean a growing number of workers, products, and processes that must be managed. Such layering of expanded responsibili�es creates complexi�es for managers
at all levels.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8.… 11/55

Leverage means making the workforce more produc�ve through the use of be�er tools and
equipment. One worker with a few simple tools may be able to assemble an automobile,
but not at a compe��ve cost.

©Monty Rakusen/Cultura/Ge�y Images

7.3 Foundations of Process Selection

Process selec�on is determining the most appropriate method of comple�ng a task. It is a series of decisions that include technical or engineering issues and
volume or scale issues. The technical or engineering issues include the basic methods used to produce a service or good. For example, deciding to remove a gall
bladder using laparoscopic surgery versus tradi�onal methods is a technical decision made by physicians. The decision depends on the pa�ent’s condi�on and is
o�en made at the �me of surgery. On the other hand, determining the number of surgery rooms and the number of surgeries to perform each day at the regional
medical center is a volume or scale decision that is related to demand. In general, the technical aspects of process selec�on are beyond the scope of this course, so
the focus will remain on volume or scale issues.

There is a strong rela�onship among process selec�on and three cri�cal
elements in business: volume, cost, and profit. The volume or scale decision
involves applying the appropriate mix of technology to leverage the
organiza�on’s workforce. Leverage means making a workforce more produc�ve
through the use of be�er tools. For example, one person working alone with a
few simple tools may be able to assemble an automobile, but he or she cannot
build it at a cost that competes with organiza�ons providing their employees
with sophis�cated tools and technology. The person working alone, or even
with many others like him or her, cannot build enough cars to sa�sfy demand
without significant automa�on and an organiza�on to leverage their �me and
talent. More sophis�cated tools allow a workforce to produce more with the
same commitment of �me and effort. This produc�vity improvement lowers
the unit cost of the product and raises the capacity of the workforce. Similarly,
a surgeon performing a surgery without the proper equipment and an effec�ve
suppor�ng staff will not only be less produc�ve but could also be dangerous to
the pa�ent.

This presents an interes�ng trade-off between efficiency and costs in the
process selec�on decision. As more sophis�cated tools are applied to the
produc�on process, produc�vity and capacity increase and labor cost per unit
declines. As tools become more sophis�cated, the cost of acquiring them o�en
increases, which translates into increased fixed costs.

Process Selection Relates to Product Design and Capacity

Product design, capacity, and process selec�on are decisions that should be considered simultaneously. The way the product is designed affects how many people
will buy it, and that affects the producer’s capacity planning decision. This, in turn, affects the process and the costs to produce the product, which affects how
many people can afford to buy it. This logic can be represented as a circle with customers at the center, as illustrated in Figure 7.1.

Figure 7.1: Product design, process selec�on, and capacity
decisions are closely related

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 12/55

Rela�ng Process Selec�on to Product Design

Decisions made when designing a product have an impact on the process for making it. For example, if a bed is made of brass, there is no need for woodworking
equipment in the manufacturing process. Process selec�on and process technology, in turn, influence the product design. Electronic funds transfers, music
downloads, and streaming video are examples of products that are now feasible because of improvements in informa�on and communica�on technology.

Rela�ng the design of the product to process selec�on goes beyond the examples listed in the preceding paragraph. The teamwork concept is changing how
organiza�ons approach product design and process selec�on. In service organiza�ons, such as fire departments, teams of managers from various disciplines design
the services, which may include fire preven�on programs for homes and businesses, fire safety for school-age children, and firefigh�ng. While developing a product
design, the team examines various process selec�on decisions, including the types of equipment and facili�es needed, the techniques used in figh�ng fires, the
methods used to develop educa�on programs, and the type and level of training needed by employees who deliver these services.

Manufacturing firms combine design engineers with process engineers (some�mes called manufacturing engineers) to create a design team. This team, like the
team at the fire department, is responsible for providing what is best for the customer. Because the design engineers and the process engineers work together, the
lead �me required to bring a new product from an idea to a reality is reduced. This effort, called concurrent engineering, enables the organiza�on to par�cipate in
�me-based compe��on. By doing what is best for the customer, the organiza�on hopes to be rewarded with increased demand for its products and high profit
margins. These teams also improve communica�on, which decreases the number of engineering change orders, avoids unnecessary delays, and gets the product to
market more quickly, preven�ng mistakes that could increase costs.

Process Selec�on and Capacity

Process selec�on is also related to the volume demanded in the marketplace. If the market for the product is es�mated at only 1,000 units per year, it may be
difficult to jus�fy expensive, specialized equipment that produces 100 units per hour. Such equipment would be required to operate only 10 hours each year. It is
unlikely that the cost of this specialized equipment could be supported by the 1,000 units demanded unless a very high price is charged for each unit.

Problem

Quick-as-a-Blink Prin�ng Center is growing rapidly, and many of its customers are demanding that their documents be professionally bound. Management has
made a decision to purchase a binding machine. The op�ons are to purchase a manual binding machine that requires con�nuous operator a�en�on or an
automa�c machine that requires only periodic operator a�en�on. The following data are available for analysis. Note that the costs of materials can be ignored
because we are assuming that the cost of the printed documents and the binding material are the same regardless of the machine used.

Machine Annual Fixed Costs Variable Labor Costs Produc�on Rate

Manual $1,000 $18/hour 10 units/hour

Automa�c $9,000 $2/hour 100 units/hour

The total-cost equa�on is as follows:

TC =FC + (VC)(Xp)

where
TC = total cost
FC = fixed costs
VC = variable cost per unit

Xp = number of units produced

Comparing Costs: What is the cost to produce 1,000 units per year on each machine? From the following calcula�ons, it is clear that the manual machine has
lower costs. Dividing the total cost by the volume produced gives a unit cost that includes the variable cost and a share of the fixed costs.

Manual:

TC =
= $2,800

Unit Cost =
= $2.80 per unit at a volume of 1,000

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 13/55

Automa�c:

TC =
= $9,020

Unit Cost =
= $9.02 per unit at a volume of 1,000

What happens if 10,000 books need to be bound? The marginal labor cost of binding each addi�onal book on the automa�c machine is only $.02 because the
labor cost is $2.00 per hour and the output is 100 units per hour. On the manual machine, the marginal cost of binding a book is $1.80.

Manual:

TC =
= $19,000

Unit Cost =
= $1.90 per unit at a volume of 10,000

Automa�c:

TC =
= $9,200

Unit Cost =
= $0.92 per unit at a volume of 10,000

The unit cost for binding 10,000 books with the automa�c opera�on is significantly lower. As demand increases, the automa�c process becomes more and
more appealing.

The Indifference Point: At what produc�on volume are the costs of the manual and automa�c machines equal? The variable X represents the volume
produced. To check the accuracy of the following calcula�ons, subs�tute the computed value of X into the total-cost equa�on for each machine to determine
if the two total costs are equal. Except for differences caused by rounding, they should be:

Total cost manual = Total cost automa�c

(1,000) + (1.80)(X) = (9,000) + (0.02)(X)

Solve for X:

(1.80 – 0.02)(X) = 9,000 – 1,000

X

X = 4,494 units

The Power of Volume to Reduce Costs: This problem illustrates how unit costs can be decreased by purchasing high-speed equipment and producing large
numbers of parts. The following table lists the unit costs for various volumes. Verify the unit cost for binding 100,000 books.

Volume Manual Automa�c

1,000 $2.80 $9.02

10,000 1.90 0.92

100,000 1.81 0.11

This example makes many simplifying assump�ons, such as unlimited capacity, no increase in maintenance costs, and no increase in the failure rate of the
machine as volume increases. These and other relevant factors could be es�mated and considered in the analysis. The impact of volume on unit cost is very
clear based on this example.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 14/55

The economies of scale principle states that there is a most
efficient size for a facility and a most efficient size for the firm.

©Stockbyte/Thinkstock

Shipping Goods by Container Ships: Economy of
Scale; Addicted to Cheap Shopping? Why the Real

Cost of Goods Keeps Going Down

7.4 Understanding Effects of Scale

Business leaders have long recognized the advantages that can be gained by having high-volume
opera�ons. The tremendous increase in prosperity in the United States and other developed
countries was driven by making large quan��es of the same or similar products on the same
equipment, that is, the same fixed-cost base. This approach, o�en called mass produc�on, is based
on the concept of economies of scale. Recall from Chapter 3 that the economies of scale principle
states that there is a most efficient size for a facility, and a most efficient size for a firm. In prac�ce,
the principle has been used to jus�fy both building larger facili�es for the produc�on of goods and
services and purchasing more automated equipment to speed produc�on and lower costs.

An organiza�on can use both or either of these approaches to leverage the �me and talents of the
people who create the large volume of services and goods that customers demand. If organiza�ons
and society are to progress, investments in equipment and facili�es (fixed costs) must be made to
increase the produc�vity of labor and management.

The cri�cal challenge when
achieving economies of scale is
pu�ng a large volume of
product across the same
equipment or fixed-cost base. In
the past, it was necessary that
different products produced on

a machine where very similar because equipment was not flexible enough to cope with design
differences. With technological advances, it is possible to achieve economies of scale by
making different products on the same equipment, and this can be done without the extra
costs that are incurred when equipment is stopped and changed over to make the new
product. Economies of scope is the term that describes this situa�on. Economies of scope are
economies of scale across products. For example, Allen-Bradley has a facility that can produce
a wide variety (100 different designs) of computer motherboards in produc�on lot sizes as
small as one unit. The facility can produce them at a rate and cost that rivals mass produc�on.

Cost-Volume-Profit Modeling

To understand scale, it is helpful to construct a simple model. A model is an abstrac�on of the
key variables and rela�onships in a real problem, and is used to simplify the problem and
increase understanding. The cost-volume-profit (C-V-P) model uses es�mates of costs,
revenues, volume sold, and volume produced in order to es�mate profit.

C-V-P Model Formula�on

The C-V-P model is formulated by determining total revenue and costs, as shown in the following equa�ons:

TR = (SP)(Xs)

where

TR = total revenue

SP = selling price per unit

Xs = number of units sold

TC = FC + (VC)(Xp)

where
TC = total cost

Shipping Goods by
Container Ships:
Economy of Scale
From Title:

Addicted to Cheap Shopping? Why the Real Cost …
(https://fod.infobase.com/PortalPlaylists.aspx?
wID=100753&xtid=39028)

 0:000:00 / 3:37 / 3:37 1x1x

Processing math: 0%

https://fod.infobase.com/PortalPlaylists.aspx?wID=100753&xtid=39028

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 15/55

FC = fixed cost

VC = variable cost per unit
Xp = number of units produced

The profit (P) equa�on is total revenue minus total cost: P = TR – TC

By subs�tu�ng the TR and TC equa�ons into the equa�on for profit, the following mathema�cal model can be used to calculate profits, given sales and produc�on
volumes. This is the cost-volume-profit model.

P = SP(Xs) – [FC + VC(Xp)]

This model can also be manipulated to determine the volume required to earn targeted value for profit. In order to do this, assume that the number of units sold
is equal to the number of units produced.

If X = Xs = Xp, then

P = SP(X) – [FC + VC(X)]

P = SP(X) – FC – VC(X)

P + FC = (S – VC) (X)

Solve for X as follows:

If C is defined as contribu�on per unit, then C = (SP – VC). Thus, the equa�on becomes

The profit point is the number of units (X) that must be produced and sold at the contribu�on per unit (C) in order to cover the fixed costs (FC) and profit (P).
Figure 7.2 represents this model graphically and illustrates the profit point. If the profit is set to zero, equa�on 7.1 is recognizable as the break-even formula. The
break-even point (BEP) is the volume that must be produced and sold so that profit is zero.

Figure 7.2: Cost-volume-profit model

Problem

The mechanics of applying the C-V-P model are rela�vely simple. To calculate the profit point, you must know the selling price, variable costs, and fixed costs.
Management can determine the projected level of profit to be used in the model. In this example, the fixed cost and profit are for a one-month period.

SP = $8.00/unit

VC = $4.50/unit

C = $3.50/unitProcessing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 16/55

FC = $25,000/month

P = $8,000/month

In this case, the number of units that must be produced and sold to make $8,000 profit in one month is 9,429 units; that is the profit point.

X

 = 9,429 units/month

Managers can use this number in many ways. Here are two examples. First, if the organiza�on has a capacity of only 5,600 units per month, then achieving an
$8,000 profit is not possible. Second, if the sales forecast is for 9,000 units, then that profit level will not be achieved because not enough units will be sold.
Changes can be made to the model for the purpose of sensi�vity analysis and to answer what-if ques�ons. For example, what if the variable costs increased
from $4.50 to $5.00 per unit? Under these circumstances, the profit point becomes 11,000 units per month.

C-V-P Assump�ons

The C-V-P model, like any model, makes several assump�ons. The assump�on that sales volume equals produc�on volume has already been men�oned. The model
also assumes that total cost and total revenue are linear func�ons of volume. The model is based on historical data for costs and revenue. Any changes in these
rela�onships caused by changes in technology, demand, or strategy may invalidate the use of this or any other model. Users of models should understand these
assump�ons, or they may apply the model ineffec�vely and thus obtain misleading results.

The Mul�ple-Product Case of the C-V-P Mode

The discussion of the C-V-P model has considered only single-product firms. Many organiza�ons produce more than one product, using the same set of fixed costs.
How can this firm be modeled? In this case, another set of variables, product mix, is added to the revenue and cost rela�onships. To solve the problem, a weighted
contribu�on based on the mix of each product is calculated. Consider the following problem.

Problem

A company repairs small appliances. The table that follows provides the average selling price, variable cost, and contribu�on for each service. The product mix
and profit target are also listed. The fixed costs are shared by all three products.

Coffeepot Mixer Blender

Product mix 45% 20% 35%

Selling price/unit $12 $16 $9

Variable cost/unit $6 $7 $4

Contribu�on/unit $6 $9 $5

Profit target = $20,000/yr.

Fixed costs = $30,000/yr.

The mix is the number of each product repaired divided by the total number repaired. The weighted contribu�on is calculated as:

where

WC = weighted contribu�on per unit

Mi = product mix as a percentage of total sales for product i, where i = 1,. . ., n for n different products or product lines

SPi = selling price for product i

VCi = variable cost for product i

Thus, the weighted contribu�on for the product mix shown above is:

WC = 0.45($12/unit – $6/unit) + 0.2($16/unit – $7/unit) + 0.35($9/unit – $4/unit)

= $6.25/unit

In the mul�ple-product case, the weighted contribu�on per unit subs�tutes for the contribu�on per unit in equa�on 7.1.Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 17/55

X =
=
=

8,000 units

Interpre�ng the Results: The variable X is measured as a composite unit—a unit consis�ng of 45% coffeepot, 20% mixer, and 35% blender.

One composite unit with a weighted contribu�on = $6.25

45% Coffeepot

20% Mixer

35% Blender

Product Mix No. Required

Coffeepot 0.45 3,600 units

Mixer 0.20 1,600

Blender 0.35 2,800

8,000 units

The number of units, 8,000, represents the total number of coffeepots, mixers, and blenders that must be repaired to make a $20,000 profit. The number of
coffeepots required is (0.45)(8,000 units), or 3,600 units.

What Happens to the Profit Point if the Mix Changes?: In this model, the mix affects the profit point. If the es�mated mix is different from the actual mix,
then the profit point will change. Assume the mix changes to 50% coffeepots, 10% mixers, and 40% blenders, and the total number of units repaired remains
8,000. How is profit affected?

Coffeepot Mixer Blender

Product Mix 50% 10% 40%

Selling price/unit $12 $16 $9
Variable cost/unit $6 $7 $4
Contribu�on/unit $6 $9 $5

Profit target (P) = unknown.

Fixed costs = $30,000/yr.

Equa�on 7.2 can be restated and used to calculate profit.

X

WC(X) = P + FC

P = WC(X) – FC

The fixed costs are $30,000, and the volume is given as 8,000 units. First, the weighted contribu�on is calculated based on the new mix.

WC =
= 0.5($12/unit – $6/unit) + 0.1($16/unit – $7/unit) + 0.4($9/unit – $4/unit)

  = $5.90/unit

Now profit can be calculated.

P = $5.90(8,000 units) – $30,000 = $17,200

The profit is only $17,200 dollars because demand shi�ed away from mixers, which have a higher contribu�on per unit, to the lower-contribu�on coffeepots
and blenders. Profit is not only a func�on of the volume produced and sold, but also a func�on of the product mix.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 18/55

An assembly line allows a company to make a fast-food pizza quickly and with low labor
costs.

Newscast/ASSOCIATED PRESS/AP Images

7.5 Process Selection and Economies of Scale and Scope

From the perspec�ve of economies of scale or economies of scope, process selec�on focuses on the volume of product demanded in the market. Organiza�ons can
influence that volume by increasing adver�sing, providing be�er service, and producing higher quality products. Regardless of how that volume is generated, an
organiza�on needs to respond to higher demand with an appropriate process.

When does an organiza�on have sufficient volume to jus�fy specialized, high-speed equipment? Is a demand of 50,000 units per year sufficient? It is not possible to
give specific answers to these ques�ons because the answers depend on what the organiza�on produces. For example, if it produces space shu�les, then an annual
demand of 50,000 would certainly be large enough to support specialized facili�es, and even 5,000 would be considered a large volume. If, however, the
organiza�on is processing checks for a bank, 50,000 a year is a very small number, and even 1 million per year is not large.

In process selec�on, Hayes and Wheelwright (1979, p.133) have suggested that product and process can be viewed through two sides of a matrix. Figure 7.3
displays a series of process alterna�ves that can be matched with iden�fiable product characteris�cs so that efficient opera�ons can be achieved. High-volume
opera�ons are usually referred to as line flow processes. One type of line flow is the con�nuous flow process. A con�nuous flow does not usually iden�fy
individual units; rather, the product is mixed and flows together in a con�nuous stream. Oil refining is a good example of a con�nuous flow process. Processing
checks in a bank is another example. The term assembly line is used to describe the high-volume assembly of discrete products. A washing machine is a good
example of an assembly-line product and making a fast-food pizza on a busy night is another. Con�nuous flow and assembly lines are usually dedicated facili�es
that produce large volumes with li�le, if any, difference in the products. Because the items produced within such a facility are the same or very similar, the process
involves economies of scale. To increase volume, cut costs, and achieve economies of scale, organiza�ons tradi�onally move up the shaded diagonal in Figure 7.3
(see next page).

Batch is a term used to describe a produc�on process that does not have
sufficient volume from a single product to fully use a facility. In this case, the
facility produces several products to build sufficient volume. When this
resource sharing exists, a transi�on �me, or changeover �me, is usually
required to change the facility from being able to make one product to being
able to make the next. For example, Merck, which produces medica�ons, uses
batch produc�on. Merck has equipment that is designed to mix ingredients and
form pills or capsules. O�en this equipment can produce in a few weeks all the
capsules of a par�cular medica�on needed for an en�re year. Because of shelf
life considera�ons and inventory costs, making even a one-year supply in a
single batch creates too much inventory. So, companies like Merck produce
different medicines in smaller batches using the same equipment. In between
batches, the equipment must be thoroughly cleaned so the next batch is not
contaminated. These changes take �me and cost money, but are necessary to
maintain enough volume to support the large investment in equipment.

As product volume declines, batching opera�ons may no longer be possible.
Here, only a few units of a product are required, and there may be no
assurance that the order will be repeated. The differences between products
can be significant. In this situa�on, usually called job shop produc�on, the
facility is general and flexible enough to meet a variety of needs. To achieve
this flexibility, job shops generally have a much higher unit cost than line flow or batch processes for the same product. Fancy restaurants and hospital emergency
rooms are examples of job shops. Both types of organiza�ons offer great product variety and cater to individual customer demands.

At the bo�om of the volume scale in Figure 7.3 are projects, which are usually one-of-a-kind opera�ons. Each job is different from the rest. Most large construc�on
jobs are projects, and many service opera�ons can be categorized as projects. Installing new computer hardware, adding new computer so�ware, and
implemen�ng a new management planning and control system could all qualify as projects. The rela�onship between product and process, illustrated in Figure 7.3,
indicates that there is a one-to-one rela�onship between product volume and the type of process. For example, Figure 7.3 indicates that one-of-a-kind products
cannot be produced on an assembly line or in a con�nuous flow shop. Figure 7.3, therefore, implies that an organiza�on’s op�ons are limited to product and
process matches on the diagonal. The diagram implies that if an organiza�on wants to achieve the low cost obtained in con�nuous flow or assembly-line
opera�ons, it must significantly limit product variety. An organiza�on that wants to achieve the product variety obtained in a job shop or projects must incur high
unit costs.

Figure 7.3: Matching process alterna�ves with product characteris�cs

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 19/55

However, with the advances in informa�on and manufacturing technologies, organiza�ons have new process alterna�ves that are flexible, allowing changes from
one product to another to be made quickly and with few costs. With these technologies, the products produced within a facility can be different, yet low in costs.
This is economies of scope, and it implies moving off the shaded diagonal in Figure 7.3 toward the lower le� corner of the diagram. This segment of the diagram
implies both low cost and high variety, which is called mass customiza�on and is discussed in a later sec�on.

The following sec�ons describe the tradi�onal process alterna�ves: con�nuous flow, assembly line, batch, job shop, and project, as well as manufacturing cells and
flexible manufacturing systems.

Line Flow Processes

Con�nuous flow opera�ons and assembly lines have some differences; yet both are high-volume, mass-produc�on opera�ons characterized by a standardized
product with interchangeable parts. Because of this, the process is the same for each unit, and the product has a dominant product flow through the facility. With
li�le or no product varia�on, there is no reason to have more than one path through the facility. Furthermore, the equipment that processes the products should
be arranged “around” the product so that material-handling and transporta�on costs are not excessive. This approach is called a product layout.

In terms of the cost structure, a con�nuous flow process or an assembly line has rela�vely high fixed costs and rela�vely low variable costs. The high fixed costs
are, in part, a result of the substan�al investment in specialized equipment.

There are some differences between a con�nuous flow process and an assembly line. In a con�nuous flow process, the product is o�en a commodity in which one
unit is not dis�nguishable from another. In this case, the producer makes no a�empt to track each unit separately. For example, in refining gasoline from crude oil,
one gallon of unleaded regular gasoline is like another. Banks process checks one a�er another without changing methods. The produc�on of fiberglass insula�on is
high-volume and fast-paced. It is not feasible to track and iden�fy each piece produced. The emphasis is on measuring inputs and comparing them to outputs.

The tradi�onal assembly-line process allows some varia�ons among units. Op�ons are usually selected from a list of possibili�es, and the minor adjustments
needed to cope with this varia�on can be made by workers on the produc�on line. Adding green peppers to the standard pizza is easy to do. Adding custom floor
mats to a car or a temperature probe to a microwave oven is also easy to do. As technology improves, assembly lines are becoming more flexible. The con�nuous
flow and assembly-line characteris�cs are summarized in Table 7.3, along with the other process types.

Table 7.3: Characteris�cs of the process alterna�ves

Characteris�cs

Process Volume Product variety Product
flow

Facility
layout

Fixed costs Variable costs Equipment

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 20/55

A woodcarving business that makes carvings to order is one example of a job shop because
it handles a large number of different products produced in small volumes, rather than
producing large quan��es of the same product.

iStockphoto/Thinkstock

Con�nuous flow High Standard

Dominant Product High Low Special
purpose

Assembly line High Standard with minor
modifica�on

Dominant Product High Low Special
purpose

Batch High Some varia�on Dominant Product High Low Some
flexibility

Flexible manufacturing
system

High Moderate variety Dominant Product High Low

Flexible

Manufacturing cell High Moderate variety Dominant Product Moderate

Low to
moderate

Flexible

Job shop Low Major differences Random Process Low

High Flexible

Project One One-of-a-kind Not
applicable

Fixed
posi�on

Low to
moderate
High Flexible

Batch Flow

When quan��es are not sufficient to support dedicated produc�on facili�es, several groups or batches are produced using the same facility. These products are
usually similar in design and have similar processing requirements. For example, glass containers come in a variety of sizes but are designed and built similarly. A
key to understanding whether or not differences among products are meaningful can be found when the equipment is shut down to change from one product to
another. If the �me for these changes is not significant and the sequence of opera�ons is similar, then it is like a line flow process. However, if the changeover �me
is significant, then these products are usually built in batches.

Because of the similar processing requirements in batch opera�ons, one or a few product flows dominate. For example, appliance manufacturers may produce
several different models of refrigerators on the same assembly line. In cases where changeover �me is significant, manufacturers may produce a batch—for
example, one week’s produc�on of a par�cular model—and then switch to another model. Although the models show some differences from batch to batch, these
differences are not significant enough to change the product-oriented layout of the facility. If a producer is able to design the product and the process so that
different models can be produced one a�er the other with zero or near zero changeover �me, then the process is similar to an assembly line that is producing a
standard product. The disadvantages of batch produc�on are that (1) changeover �me is nonproduc�ve, and (2) extra inventory must be maintained to sa�sfy
demand for the products that are not being produced.

Job Shops

With limited product volume, batching opera�ons may not be possible.
Here, only a few units of a product are required, and there may be no
assurance that the order will be repeated. The differences between
products can be significant. In this situa�on, usually called job shop
produc�on, the facility is general and flexible enough to meet a variety of
needs. To achieve this flexibility, job shops generally have a much higher
unit cost than line flow or batch processes for the same product. Fancy
restaurants and hospital emergency rooms are examples of job shops.
Both types of organiza�ons offer great product variety, and cater to
individual customer demands.

A job shop does not produce large quan��es of the same or even similar
products, but is dominated by a large number of different products
produced in small volumes. Because the products are different, they do
not follow the same path through the facility. In fact, the movement of
products between work centers is best characterized as random. As a
result, it is not possible to organize machines by product flow as in the
line flow processes or in batch opera�ons. It is necessary to group
machines by process or type of opera�on because a job is as likely to
require work at one work center as at any of the other centers. When
similar equipment is grouped together it is called a process layout. The

job shop is one of the process alterna�ves shown in Table 7.3.

Because the products are very different, specialized equipment cannot be jus�fied. Job shops use flexible equipment to meet the needs of the diverse product
group. A job shop produces different products on general-purpose machines using skilled labor. The cost structure has low fixed costs and high unit-variable costs.

Projects
Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 21/55

Direct Sales in Computers; Your Computer, Your
Way: Dell and the Direct Sales Model

In a project, cost structure is not the same as in other processes because there is only a single unit. In one sense, the cost for the project is all variable. Fixed costs
in the form of overhead begin to make sense when a firm is engaged in more than one project and can spread certain major equipment costs and overhead costs
across several different projects.

Product flow is not meaningful in projects because the end product of most construc�on projects is designed to remain sta�onary. The usual term that describes
the layout is fixed posi�on. A project-oriented opera�on is very flexible, allowing extensive customizing of the finished products. Projects are common in service
opera�ons, for example, Seibel Systems develops and installs so�ware systems that control banking opera�ons. These so�ware systems can monitor each
transac�on, keep a history on it, and assist in reconciling the transac�on to the account. To design these systems, so�ware companies draw the needed talent from
a pool of experts and form a project team. Because each system is different, different groups may be used to develop each system. These companies provide a
service and use project management to successfully complete the work.

Manufacturing Cells and Flexible Manufacturing Systems

Manufacturing cells and flexible manufacturing systems (FMS) are process op�ons that offer the poten�al to produce low-cost products that meet varying customer
requirements. Manufacturing cells rely on group technology to build a family of parts with similar design and processing characteris�cs. Group technology is a set
of methods that enables firms to classify parts based on size, shape, use, type of material, and method of produc�on. A family of parts is a collec�on of parts with
similari�es in these characteris�cs. In this way, a product-oriented layout (cell) can be designed that will reduce material-handling costs, increase machine
u�liza�on, and shorten produc�on lead �mes. Because the processing is similar, less �me is required to change from one product within the family to another (see
Table 7.3).

An FMS is similar to a manufacturing cell because it relies on group technology to build families of parts. Also, like a manufacturing cell, an FMS produces low-cost
products with high variety. The major differences are that an FMS o�en has more automa�on, robots, and computer control than a manufacturing cell does, and it
usually operates without people tending the machines.

Flexible manufacturing systems grew from the need to cope with demand for increasing product varia�ons. With an FMS, an organiza�on can capture new markets
by accumula�ng produc�on requirements from several low-volume products. Higher-volume opera�ons allow the arrangement of a set of machines in one layout to
produce all the different products. The products, however, must be similar enough to have the same or a similar sequence of opera�ons, and the machines must
be flexible enough to handle the differences. This system is feasible with computer technology and robo�cs that can quickly be adapted to new products. A
manufacturing cell and an FMS enable organiza�ons to increase the volume of product moving across a group of machines and, thereby, reduce opera�ng costs.

Mass Customization

Mass customiza�on offers an alterna�ve to addressing product variety. Firms that seek mass
customiza�on are able to design, produce, and quickly deliver products that meet specific
customer needs at close to mass-produc�on prices. These firms develop close rela�onships
with their customers, which depend on frequent informa�on exchange.

From an opera�ons perspec�ve, mass customiza�on is the low-cost, high-quality, large-volume
delivery of individually customized goods and services. Put simply, mass customiza�on
combines the pursuit of economies of scale and scope, quality improvement, and flexibility.
Economies of scale and scope imply achieving high-volume opera�ons and low costs. When
pursuing flexibility, there are three a�ributes to consider:

1. Range/variety—The number of viable states for the produc�on system and the degree of
difference in those states. From the perspec�ve of range, the greatest variety is when a large
number of very different products can be produced

2. Mobility/responsiveness—The ability to change quickly from producing one product to
producing another. High mobility minimizes the need for long produc�on runs. How long
does it take for the service center to shi� from doing brake work on a Ford to doing exhaust
work on a Chrysler?

3. Uniformity—The ability to a�ain similar performance across the en�re range of outputs. Will
the quality on the brake job for the Ford be at the same high level as the quality of the
exhaust system for the Chrysler?

Flexibility is the greatest when all three elements of flexibility are at the highest level. That is,
the firm can produce a large number of products that are very different, can change between them quickly, and can maintain a high level of performance.

Flexibility is an important factor for the service industry. Following are some examples of the product variety that services face.

1. Hospitals and medical clinics a�empt to treat pa�ents with a wide variety of needs.
2. With the deregula�on of financial markets, the differences between banks and brokerage houses have blurred. Banks are doing much more than taking deposits

and making loans.
3. Universi�es are a�emp�ng to cope with an expanding number of majors, specialized degree programs, and individualized study programs. When this expansion

occurs, universi�es must have faculty who have the capabili�es to teach and conduct research across disciplines, else the capabili�es of the faculty may not match

Direct Sales
in Computers
From Title:

Your Computer, Your Way: Dell and the Direct S…
(https://fod.infobase.com/PortalPlaylists.aspx?
wID=100753&xtid=10070)

© I f b All Ri ht R d L th 02 15

 0:000:00 / 2:15 / 2:15 1x1x

Processing math: 0%

https://fod.infobase.com/PortalPlaylists.aspx?wID=100753&xtid=10070

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 22/55

the changing needs of the organiza�ons that hire the graduates.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 23/55

Chapter Summary

Facility loca�on should not be based en�rely on produc�on factors and transporta�on. Loca�on is a long-term strategic decision that can have a major impact on
the organiza�on’s ability to compete.
Loca�ng a facility can have strategic implica�ons. Some organiza�ons employ a regional facility approach where one facility is responsible for producing all the
products for that area of the country. Others employ the product facility strategy where one plant produces one product or product line and ships it throughout
the country.
Both quan�ta�ve and qualita�ve factors influence the loca�on decision. These factors should be integrated if the decision-making process is to work effec�vely.
Loca�on influences costs, selling price, demand, and access to financial services.
Process defines the way that the products should be produced.
Process selec�on is closely related to the product design and capacity decisions.
A cost-volume-profit model is one way of reviewing processing op�ons. This model allows the organiza�on to examine the risks associated with selec�ng a
processing op�on. Mass-produc�on alterna�ves involve greater risk, but have the poten�al for greater return.
Process selec�on is a func�on of volume demanded. The different process types include line flow, which includes con�nuous flow and assembly line, batch, job
shop, and project as well as manufacturing cells and flexible manufacturing systems. Each of these process types is summarized in Table 7.3.
Mass customiza�on allows firms to achieve greater product variety while keeping costs low and produc�on volumes high.

Case Studies

Tilley Video Disc, Inc.

William (“Call Me Billy”) Tilley, founder, president, and chairman of the board of Tilley Video Disc, Inc., has a very pleasant problem. The market for digital video
discs (DVD) is expanding rapidly, and he has accepted an a�rac�ve offer for his controlling interest in Tilley Video Disc, Inc., while retaining his current management
responsibili�es. The deal is con�ngent on Billy’s development of a plan to expand produc�on from 10,000 to 50,000 units, and to lower produc�on costs. Evers,
Inc., the company that has made the offer, feels the growth in sales will be drama�c if costs can be significantly reduced.

Presently, produc�on of the video discs takes place in one plant in Rimer, Oregon. The plant was formerly a slaughterhouse and meatpacking facility. Billy has
quickly come to the conclusion that produc�on could be maintained at this facility, but that significant on-site expansion is not sound. The equipment in the facility
was purchased from a bankrupt company and has been used for several years. It can best be characterized as slow, general-purpose equipment. The following data
has been compiled from the exis�ng plant for the last 12 months:

Selling Price $6.50/unit
Variable costs $3.25/unit
Total Produc�on 9,824/year
Rejects 644/year
Sales 9,180/year
Es�mated capacity 10,000/year
Annual fixed costs $20,000

Evers’ vice president of marke�ng thinks that the selling price should be reduced to about $5.00 in order to achieve the needed sales growth and to grab market
share in the highly compe��ve consumer market. As a consultant to Billy Tilley, you are charged with developing a plan that will allow the company to increase
capacity by 400% and reduce variable costs by 20%. You should use the cost-volume-profit model in building your plan. Use an annual profit of $80,000 as a target
profit. Provide a wri�en report that addresses the following ques�ons:

1. Is it a good idea to keep the exis�ng facility?
2. What benefits may be derived from the new technology?
3. Should one facility be built, or should the plan have several small facili�es similar to the present facility?
4. Why and how will the cost structure of the new facility differ from that of the exis�ng one? Be specific. Use the C-V-P model to help describe the differences.

Dailey Computer Service

Kathy Dailey, president of Dailey Computer Service, has called you into her office to help plan the company’s future. Profits have been declining even though sales
have increased. During this �me, selling price and costs have not changed. The company sells three services: a payroll package; data entry services; and computer
forms. The following table shows the revenue and costs of these services:

Payroll
Package

Data entry
(per 1,000)

Computer forms
(per 100)

Selling price $3,500 $25 $35
Variable cost $800 $16 $30

Fixed costs average $40,000 per month.

Sales data for the last two months are listed here.Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 24/55

Two Months Ago Last Month

Units Sales Units Sales
Payroll (packages) 7 $24,500 5 $17,500
Data entry (1,000) 2,500 62,500 2,200 55,000
Forms (100) 1,400 49,000 2,000 70,000
Total sales $136,000 $142,500

1. How did the firm manage to increase sales, hold the line on price and costs, and make less money? Be specific; Dailey wants numbers to back up your answer.
2. If Dailey Computer Service maintains the same sales mix as last month, how can it achieve a profit of $10,000 next month? Be specific.
3. From what you have discovered in this analysis, answer the following ques�ons:

a. How should Dailey Computer Service approach marke�ng?
b. Should price changes be considered?

Discussion Ques�ons

Click on each ques�on to reveal the answer.

1. Why is facility loca�on important to an organiza�on?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Facility loca�on is the placement of a facility with respect to customers, suppliers, and other facili�es with which it interacts. The facility loca�on decision is
cri�cal to an organiza�on’s success because (1) the result of the decision is to commit a significant amount of an organiza�on’s resources, (2) the costs of
reloca�on are high, (3) the loca�on can greatly influence produc�on and transporta�on costs, (4) the loca�on affects an organiza�on’s ability to serve its
customers, and (5) the loca�on can be a key ingredient in an organiza�on’s strategy. The facility loca�on decision is a long term, strategic decision, which can
have a major impact on the organiza�on’s ability to compete.

2. What factors are affected by the choice of loca�ons? Which of these factors can be measured in dollars, and which cannot?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Facility loca�on decisions depend on marke�ng issues, produc�on factors and environmental decisions. Many organiza�ons require easy access to customers.
Some choose to locate near universi�es to take advantage of research facili�es. Some need easy access to raw materials. Some locate to take advantage of low
labor rates, material and/or transporta�on costs. The quality of schools, cultural advantages and banking services, along with others, can also play an
important role in the loca�on decision.

Many of these factors can be measured in dollars while others cannot. Quan�ta�ve factors include costs associated with building the facility, producing the
product, overhead, and transporta�on to and from the facility. State and local governments offer incen�ves to a�ract and retain businesses and jobs, and
these are quan�ta�ve, as well. Qualita�ve factors include recrea�onal and cultural ac�vi�es, availability of labor, educa�onal and research facili�es, and many
others listed in the appendix to this chapter.

3. How can qualita�ve and quan�ta�ve factors be integrated to make a sound and logical loca�on decision?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Qualita�ve factors, whose direct impact on profits is not measurable, need to be carefully considered and integrated with quan�ta�ve factors. To integrate
these factors, managers should decide which qualita�ve factors are relevant to the decision, weight each relevant factor, and evaluate each site so that ra�onal
comparisons can be made. These scores can be summed for each site and compared with the results from the analysis of the quan�ta�ve factors. If one site is
the best in both qualita�ve and quan�ta�ve factors, then it would seem to be the correct choice. If not, then trade-offs need to be made among the sites.

4. What hidden factors are influenced by on-site loca�on, and how are they influenced?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

On-site expansion can create many problems, especially if it is a repeated prac�ce. As more produc�on space is added, material handling and storage become
more difficult because storage space is converted to produc�on. As new product varia�ons are added, the once simple product flow becomes complicated by
twists, turns, and back-tracking. On-site expansion can strain intra-plant transporta�on and communica�on.

Staying at the same site o�en postpones the introduc�on of new products and process technologies. Old equipment and old produc�on methods are used
longer than they should be. Future product innova�on, produc�vity increases, quality improvements, and cost reduc�ons can be nega�vely affected. On-site
expansion can mean a growing number of workers, products, and processes that need to be managed. Such layering of expanded responsibili�es creates real
complexi�es for management at all levels.

5. Why are spa�al rela�onships important in the loca�on decision?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

In addi�on to factors like local labor costs and u�lity costs, the loca�on decision should consider spa�al rela�onships. Spa�al rela�onships are important
because convenient access by customers and/or the ability to transport large quan��es of material easily and quickly may be very important. In loca�ng a
health care facility, the distance which customers travel should be considered because it is important to the customer. When outbound transporta�on costs are
high, manufacturing and warehousing tend to locate close to customers. A good example of this is aluminum can producers. The cost to ship a can is very high
because the organiza�on is shipping a lot of air and very li�le product. On the other hand, when inbound transporta�on costs are high, facili�es tend to be
located close to suppliers.

6. What is process selec�on, and how can the organiza�on use it to gain compe��ve advantage?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Process describes the way in which the product is made. Process selec�on is a series of decisions that include technical or engineering issues and volume or
scale issues. The technical issues include the basic technology used to produce the good or service such as con�nuous cas�ng to make slabs in the steel

Processing math: 0%

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 25/55

industry. It includes the sequence of steps, the equipment, and the facili�es needed to perform the services or produce the goods. Volume or scale decisions
involve using the proper amount of mechaniza�on to leverage the organiza�on’s workforce. Leverage means to make the workforce more produc�ve through
the use of be�er tools. The purpose of leveraging is to achieve the desired level of produc�on at an acceptable level of cost. Process is strategically important
because it helps to define the product’s costs and quality.

7. How is process selec�on related to product design and capacity determina�on?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Product design, capacity, and process selec�on decisions should be considered simultaneously rather than independently. The market research that helps to
shape the product design also provides an es�mate of the demand for the product at a price that customers are willing to pay. The demand for that product
should be used to determine the capacity the organiza�on will select. The amount of demand will help to determine how the product will be produced. Large
volume products (and low product variety) tend to be produced by line flow processes while low volume products (and high product variety) are produced in
job shops.

The following example illustrates the rela�onships between product and process design. If a fast food sandwich is described as flame broiled, the process
should not include grills for frying. In turn, process selec�on influences product design. A wrist watch powered by light is an example where improvements in
technology ul�mately led to new product designs.

Process selec�on is constrained by the volume of the product required. For example, if the market for a product is es�mated at only 1,000 units per year, it
would be very difficult to jus�fy spending a great deal of money on a machine that will produce 100 units per hour. The machine will only need to operate ten
hours per year to meet demand.

8. Explain how the cost-volume-profit model of a firm is derived. How is it useful to opera�ons managers in making the process selec�on decision?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

The cost-volume-profit (C-V-P) model uses es�mates of costs, revenues, volume sold, and volume produced in order to es�mate profit. The C-V-P model is
formulated by determining total revenue and costs. The difference between revenue and costs is profit. The model allows managers to calculate profit for any
sales or produc�on volume. It also can be used to determine the volume required to be produced and sold to achieve a given level of profit. It is useful for
opera�ons managers in making the process selec�on decision because the cost structure (the amount of fixed and variable costs) can be changed to represent
the different processes. Line flow processes have high fixed and low unit variable costs while job shops have low fixed and high unit variable costs. By trying
different alterna�ves, the impact of process selec�on on profit can be determined.

9. What are line flow processes, and what characteris�cs help to define them? Give examples.
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

High volume opera�ons are generally referred to as line flow processes. Line flow processes are characterized by standard products, a dominant product flow,
high fixed costs, low unit variable costs, and special purpose equipment. One type of line flow is the con�nuous flow process. A good example of a con�nuous
flow opera�on is an oil refinery. Another good example is a paper mill. Assembly lines refer to opera�ons that assemble a high volume of discrete products.
Automobiles are made on assembly lines.

10. What is batch flow, and what characteris�cs help to define it? Provide examples.
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Batch flow describes a produc�on process that does not have sufficient volume from a single product to fully use the facility. Several products are made on the
same equipment to provide sufficient volume. Changeover �me is generally required to change the facility from one product to the next. Thus, products are
made in batches. Batch opera�ons are characterized by limited product variety, small differences between product flows, high fixed costs but not as high as a
line flow process, moderate unit variable costs, and special purpose machines which have some flexibility in order to deal with product variety. The auto parts
manufacturer referred to in the text is a good example of batch flow.

11. What is a job shop, and what characteris�cs help to define it? Provide examples.
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Job shops are characterized by the need to produce only a few units of a given product with no guarantees that the product will ever be made again.
Differences between products can be significant. A job shop is characterized by product flows that vary significantly, low fixed costs, and high unit variable
costs. The facility for such an opera�on must be general and flexible. Hospital emergency rooms and five-star restaurants are examples of job shops.

12. What is a project, and what characteris�cs help to define it? Provide examples.
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Projects are generally one-of-a-kind opera�ons in which each job is different. Projects are characterized by low to moderate fixed costs, high variable costs, and
tremendous flexibility. Construc�on work and installa�ons of large computer hardware and so�ware systems are good examples of projects.

13. How will flexibility help an organiza�on achieve a compe��ve advantage?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

In the future, flexibility in the produc�on process will play an increasingly important role. Changing customer demand and specialized design will give
producers that have flexibility a compe��ve edge because they can provide a variety of products in a �mely fashion and at low costs.

Problems

1. Darwal Developers specializes in analyzing facility loca�on decisions. Presently, the company is looking at two loca�ons: Orlando, Florida, and Olympia, Washington,
for which it has determined the following cost informa�on:

Orlando Olympia
Variable costs $14.70/unit $16.45/unit
Annual fixed costs $12,000,000 $11,000,000

Processing math: 0%

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 26/55

Ini�al investment $166,000,000 $145,000,000

a. At a volume of 800,000 units per year for a 10-year period, which facility has the lower cost?
b. At what annual volume do these facili�es have equal costs? Once again, assume a 10-year period.
c. Graph the results of Part b.

2. Marvin Manufacturing is considering three loca�ons for its new plant: Tucson, Arizona; San Diego, California; and Newark, New Jersey.

Tucson San Diego Newark
Variable costs $1.60/unit $1.45/unit $1.50/unit
Annual fixed costs $1,800,000 $2,000,000 $1,900,000
Ini�al investment $14,000,000 $16,000,000 $15,000,000

a. At a volume of 2 million units per year for a 5-year period, which facility has the lowest cost?
b. At what annual volume(s) do these facili�es have equal costs? Assume a 5-year period. (Hint: It is helpful to graph each of the cost equa�ons before solving for

the point where the costs are equal.)

3. Intensive Technologies consults for clients in the aerospace industry. Their corporate headquarters is located in Washington, D.C., but the organiza�on is planning to
relocate to the West Coast. It is considering three sites: Sea�le, Washington; Portland, Oregon; and Oakland, California. The full costs of opera�ng at each site,
which include ini�al investment, annual fixed costs, and variable costs, are approximately equal. A management team from Intensive Technologies has visited each
city, and has evaluated each site using the following criteria. The evalua�on uses a 1-to-10 scale, with 1 being the best score. Top management selected the criteria
and the weight assigned to each factor.

Weight Oakland
Score

Portland
Score

Sea�le
Score

University research specializing in aerospace 50 4 2 2
Available pool of skilled engineers 50 4 3 2
Opportunity for advanced management educa�on 40 2 3 3
Cultural ac�vi�es 20 1 2 3
Recrea�onal ac�vi�es 20 2 4 3

a. What is the weighted score for each city?
b. Which city has the advantage in terms of the qualita�ve factors? Is this advantage significant?
c. What is your recommenda�on to top management?

4. Barrel City Health Care System is looking for a new loca�on for its corporate headquarters. It is considering Atlanta, Georgia, and Danville, Illinois. The ci�es are
rated from 1 to 10 on each of the following factors, with 10 as the best score.

Weight Atlanta Score Danville Score
Cultural ac�vi�es 40 8 6
University research facili�es 80 8 8
Union ac�vi�es 60 8 4
Banking services 60 6 8
Available labor 20 6 8

a. Determine the weighted scores for both ci�es.
b. How can these scores be integrated with cost differences?
c. Suppose the following costs apply:

Atlanta Danville
Opera�ng costs $1,400,000/year $1,300,000/year
Ini�al investment $22,000,000 $20,000,000

Over a 10-year period, Danville has a $3,000,000 advantage. To determine that, take the difference in opera�ng costs per year, and mul�ply it by 10
years. Then add the difference in ini�al investment. Under what circumstances might the company s�ll choose Atlanta? How much would Barrel need
to value each point of Atlanta’s qualita�ve advantage to make it the new headquarters?

5. Nelson, Neddel, and Nickersen (NNN) Stockbrokers are planning to invest in automated equipment that will process stock transac�ons. The equipment requires a
$12 million annual investment. The opera�ng costs are $120 per hour. The equipment can generate 5,000 transac�ons per hour.

a. What is the unit cost of a transac�on if 1 million are required?
b. What is the unit cost if 10 million are required?
c. What is the unit cost if 100 million are required?
d. Why would NNN want to keep the level of transac�ons high?

6. George’s Mold Shop is planning to bid on a plas�c part for automakers. If George’s gets the bid, the manager is planning to buy a new semi-automa�c machine to
speed up the produc�on process. The annual fixed cost of the machine is $45,000. The machine requires only part-�me supervision, and the labor cost is es�mated

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 27/55

at $1.50 per hour. This has been calculated as 0.08 hour of labor at $18.75 per hour. On average, the machine can produce 140 pieces per hour and is expected to
operate for 2,000 hours per year.

a. What is the unit cost of a plas�c part if 10,000 are required?
b. What is the unit cost if 100,000 are required?
c. What is the unit cost if 200,000 are required?
d. What is the unit cost if the machine operates at capacity for the en�re year?

7. Slimline Manufacturing makes briefcases. It is considering the purchase of new s�tching machines for its final assembly. Following are the data for analysis:

System Annualized Fixed Costs Variable Costs
Spurance $3,500 $1.25/unit
Yamamoto $8,000 $0.85/unit

a. If Slimline’s demand is for 8,300 briefcases per year, which system should the company use?
b. If Slimline needs to s�tch 19,800 cases per year, which system has the lower cost?
c. At what volume do the two alterna�ves have equal costs?

8. Finn Bank and Trust is comparing a manual system for processing checks with a highly automated system. Presently, the bank processes about 10,000 checks each
workday, and it operates 250 days per year. In the near future, it is planning to sell check-processing services to other small rural banks in the area. The bank’s
management has collected the following data:

System Annualized Fixed Costs Variable Costs
Manual $50,000 $0.045/check
Automa�c $350,000 $0.005/check

a. At its present volume of checks, which system should Finn use?
b. If Finn can process checks for other banks and boost its volume to 100,000 checks per day, which system has the lower cost?
c. At what volume do the two alterna�ves have equal costs?

9. The X-ray machine at Marchal Medical Center was purchased and installed nearly four decades ago. Medically, the machine func�ons very effec�vely, but requires
excessive �me to adjust for each pa�ent. A new X-ray machine is available that will reduce the �me required to serve a pa�ent.

System Annualized Fixed Costs Variable Labor Costs
Old X-ray $40,000 $4.00/X-ray
New X-ray $120,000 $1.00/X-ray

a. Which system would provide lower costs if the annual pa�ent demand is 15,000?
b. If volume could be boosted to 20,000 pa�ents per year, which system would provide the lower costs?
c. At what pa�ent volume do these alterna�ves have equal costs?

10. Quill Pen Company sells pens that are o�en purchased as gradua�on presents. The pens sell for $5.50 each and cost $1.50 per unit to produce. Fixed costs total
$40,000 per year.

a. How many pens must Quill sell to cover fixed costs?
b. How many units must Quill sell to make $50,000 profit per year?
c. If fixed costs increase by $10,000 per year, what are the answers to Parts a and b?

11. Brockman Visi�ng Nurse Service has determined that it will cost approximately $20 each �me one of its nurses visits a sick person at home. The charge is $30, part
of which is paid by the pa�ent and part by insurance. Overhead expenses are $7,000 per month.

a. How many calls must the service make to cover overhead expenses?
b. How many calls must it make to ensure a $3,000 profit per month?

12. A.J. Electronics produces monitors for microcomputers. It has a one-shi� opera�on with fixed costs of $25,000 per month. The cost of purchased parts is $20 per
unit, and the standard labor cost is $15 per unit. The company sells the monitors for $55 each to customers who sell them under their own brand names.

a. How many monitors does A.J. have to produce and sell each month to cover costs?
b. How many monitors must be produced and sold to meet a $5,000 target profit?

13. Presently A.J. has the capacity to produce 1,600 monitors each month if it maintains a one-shi� opera�on. The A.J. sales staff is nego�a�ng a deal with a major
seller of microcomputers that will increase units sold per month from approximately 1,400 to 3,000. If the deal is successful the opera�ons manager plans to add a
second shi�. Adding a second shi� will increase fixed costs by $10,000 per month and increase produc�on labor costs to $16 per unit for those units produced on
the second shi�. This increase is due en�rely to paying a premium (shi� differen�al) for second-shi� labor. The unit price for purchased parts will drop by $0.50 for
units produced on both shi�s because of discounts for buying larger quan��es. The addi�on of a second shi� will add 1,600 units per month to capacity.

a. Graph A. J.’s cost-volume-profit rela�onship for one shi� only.
b. Graph A.J.’s cost-volume-profit rela�onship for two shi�s.
c. How many units must A.J. produce and sell to cover its costs when the second shi� is in place?
d. At what volume does A. J. make a $24,000 profit per month?Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 28/55

e. What happens to the company’s profit if the selling price of monitors drops by $5 per unit? Be specific, using calcula�ons to support your answers.

14. Carder Kitchen Utensil Produc�on makes steak knives and salad forks in the same facility.

Steak Knives Salad Forks
Product mix 0.7 0.3
Selling price $0.80 $0.40
Variable cost/unit $0.50 $0.25

Annual fixed costs are es�mated at $250,000

a. At what volume will Carder cover its costs, given the present mix?
b. At what volume will Carder report a $150,000 annual profit, given the present mix?
c. If the mix changes to 0.6 for steak knives and 0.4 for salad forks, recalculate the answers to Parts a and b.
d. If the price of a steak knife is raised by $.05, what is the impact of this new mix on the volume required to make a $150,000 profit?

15. Junge Hardware Products makes nuts, bolts, and washers in the same facility.

Nuts Bolts Washers
Product mix 0.4 0.4 0.2
Selling price $0.07 $0.09 $0.03
Variable cost/unit $0.03 $0.06 $0.001

Annual fixed costs are es�mated at $2,500,000.

a. At what volume will Junge cover its costs, given the present mix?
b. At what volume will it report a $1,500,000 annual profit, given the present mix?
c. If the price of a bolt is raised by $.01, what happens to the volume required to make a $1,500,000 profit?

16. Winken, Blinken, and Knod, Inc., is considering three different machines to grind contact lenses. The annual costs and opera�ng costs are listed below.

Annualized Fixed Costs Variable Opera�ng Costs
Manual grinder $9,000 $5.00/lens
Automa�c grinder $30,000 $2.50/lens
Computer controlled automa�c grinder $50,000 $0.75/lens

a. If 10,000 lenses are needed, which op�on has the lowest cost?
b. If 20,000 lenses are needed, which op�on has the lowest cost?
c. At what volume(s) of lens produc�on do the alterna�ves have equal costs?
d. How would you explain these op�ons to management?

Click here to see solu�ons to the odd-numbered problems.
(h�ps://media.thuze.com/MediaService/MediaService.svc/constella�on/book/AUBUS644.13.2/{pdf}bus644_ch07_odd_problem_solu�ons )

Key Terms

Click on each key term to see the defini�on.

assembly line
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A process through which discrete parts are put together to make a finished product. It is a high volume opera�on that produces products that are very similar in
features and performance.

batch
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A term used to describe a produc�on process that does not have sufficient volume from a single product to fully use the facility. The facility must produce several
products to have sufficient volume to achieve economies of scale. There is an equipment changeover prior to making each product.

break-even point (BEP)
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The volume of a good or service that must be produced and sold so that profit is zero. This is the zero profit point in the cost-volume profit model.

changeover �me
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The �me required to change the facility or equipment from making one product to making the next product.Processing math: 0%

https://media.thuze.com/MediaService/MediaService.svc/constellation/book/AUBUS644.13.2/%7Bpdf%7Dbus644_ch07_odd_problem_solutions

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 29/55

concurrent engineering
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

Occurs when design and process engineers work together to make be�er decisions and reduce the �me it takes to bring products to market.

con�nuous flow process
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A process for mass producing products that does not iden�fy individual units. The products are mixed and flow together in a con�nuous stream. Oil refining is a
good example of a con�nuous flow process.

contribu�on per unit
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The selling price of a unit minus the variable cost of producing the unit. It is the amount that each unit of sale contributes toward covering overhead costs and
mee�ng profit objec�ves.

cost-volume-profit (C-V-P) model
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A simple model of an organiza�on that uses es�mates of costs, revenues, volume sold, and volume produced in order to es�mate profit.

economies of scope
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

Economies of scale across products. Implies building the volume necessary to cover fixed costs by producing a variety of products on the same equipment. This
requires flexibility within the organiza�on.

family of parts
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A group of parts that require similar machining opera�ons.

group technology
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A set of methods that enables firms to classify parts based on size, shape, use, type of material, and method of produc�on.

job shop
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A facility capable of producing a wide variety of products in very small volumes. The produc�on facility is general purpose and flexible enough to meet a variety of
needs.

leverage
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

When referring to opera�ons and produc�vity, leverage makes the work force more produc�ve through the use of be�er tools.

line flow processes
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

High volume opera�ons. Two examples of line flow processes are con�nuous flow processes and assembly lines.

mass customiza�on
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The ability to quickly design, produce, and deliver products that meet specific customer needs at close to mass-produc�on prices. This is the low-cost, high-quality,
large volume delivery of customized products.

process layout
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The grouping or arrangement of equipment by the type of process that the machine performs, such as all drilling equipment in one loca�on.

process selec�on
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A series of decisions that include technical or engineering factors and volume or scale factors. The result determines how the services or goods will be produced.

product facility strategy
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

Processing math: 0%

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 30/55

A strategy wherein one facility is responsible for both producing a product or product line and shipping that product all over the country and around the world.

product layout
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The physical arrangement of facili�es so that products move along one path. Resources are arranged around this path to minimize material movement, reduce
material handling costs, and eliminate delays in produc�on.

profit point
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The number of units that must be produced and sold at a given contribu�on per unit in order to cover fixed costs plus profit. The break-even point is a special case
of the profit point where target profit is zero.

project
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A process for making one-of-a-kind products.

regional facility strategy
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A loca�on strategy in which each facility is assigned a market area and each facility produces a complete line of products for that area.

Chapter 7 Appendix

EXAMPLE OF THE FACTORS IN LOCATION ANALYSIS

Many factors that cannot be measured in dollars should be considered in the loca�on decision. The factors in the following list are o�en important.

UTILITIES

Water

Water supplied by: ________________________________Municipal __________Private ______

Name of supplier: ________________________________________________________________

Address: ________________________________________________________________________

For rate informa�on, contact: _______________________________________________________

Source of city water: River(s) _________ Wells ________ Lake(s) or reservoir(s) ____________

Supply of river water available: ____________________ cu. �./sec.

Supply of lake or reservoir water: __________________ gals.

Water supply approved by State Board of Health: Yes _________ No ____________

Capacity of water plant: __________________________ gals./min.

Average consump�on: ___________________________ gals./day

Peak consump�on: ______________________________ gals./day

Sanita�on

Type of sewage treatment plant: ________________________________________________

Treatment plant cer�fied by the State Board of Water Pollu�on: Yes _______ No _________

Characteris�cs of waste treatment plant:

Measurement          Capacity             Present Load

Gallons per day       _________________ _________________

Popula�on equivalent _________________ ________________

Natural gas

Natural gas service available:                  Yes __________ No _______
Processing math: 0%

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 31/55

Name: ____________________________________________________________________

Address: __________________________________________________________________

For rate informa�on, contact: _________________________________________________

Electricity

Suppliers:         Municipal _______ Private _______ Co-op ______

Name(s): ________________________________________________________

Address(es): _____________________________________________________

For rate informa�on, contact: _______________________________________

LOCAL MANUFACTURING CHARACTERISTICS

Number of manufacturing plants in community: _________________________________________

Number of manufacturing plants with unions: ___________________________________________

Number of manufacturing employees in community: _____________________________________

Strikes within last 5 years affec�ng 5% or more of the labor force: __________________________

Major manufacturers or other large employers in community: _____________________________

Name of firm: _______________________________________________________________________

Employment: ______________________________________________________________________

Product(s) manufactured: ____________________________________________________________

LABOR MARKET ANALYSIS

Date of last labor market survey: ___________________________________________________

Results of survey: _______________________________________________________________

Es�mated labor force available: ___________________________________________________

This es�mate can be documented:           Yes ____________ No _____________

County labor data:

Civilian work force (annual average): ______

Unemployed: ______________________________________

Unemployed as a percentage of workforce: ______________

Total employment: __________________________________

Agricultural employment: _________________________

Nonagricultural employment: ______________________

Manufacturing employment: _____________________

Nonmanufacturing employment: ___________________

HEALTH FACILITIES

Number of hospitals in community: __________

Number of beds: ____________

If no hospitals, distance to nearest facility: ___________________________________________

Clinic in community:       Yes ____________ No _____________

Medical personnel:        MD(s) _________ DO(s) ___________
Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 32/55

Nurses:                  Registered ______ Prac�cal

RECREATIONAL FACILITIES

Type of recrea�onal facili�es available in city or within 10 miles:

Public golf course(s) ________________ Public park(s) __________________

Public tennis court(s) _______________ Public swimming pool(s) __________

Country clubs available:                     Yes ___________ No _____________

Nearest public access to lake or river:           _____________________miles

Ac�vi�es allowed:

Swimming ________________________ Fishing ________________________

Water skiing ______________________ Motor boa�ng _________________

LOCAL INDUSTRIAL DEVELOPMENT ORGANIZATION

Name of group: _________________________________________________________________

Person to contact: _______________________________________________________________

Address: _______________________________________________________________________

Phone number: _________________________________________________________________

Home: ________________________________________

Business: ______________________________________

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 33/55

8

©Fotosearch/SuperStock

Capacity Decisions

Learning Objec�ves
A�er comple�ng this chapter, you should be able to:

Define capacity as a measure of an organiza�on’s ability to provide customers with the requested service or
good.
Explain that capacity es�ma�on is difficult because many management decisions affect capacity.
Describe how overall capacity of the system is dependent on the capaci�es of the departments and machines
that form the produc�on system.
Determine the bo�leneck in a system and demonstrate how that informa�on can be used.
Describe key capacity decisions, such as how much capacity to add; when, where, and what type (process) of
capacity to add; when to reduce capacity and by how much.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 34/55

To es�mate capacity, managers must first select a way to measure it. Hospitals o�en use
beds as a measure of capacity.

©Hemera/Thinkstock

8.1 Capacity Defined

Capacity is a measure of an organiza�on’s ability to provide customers with the demanded services or goods in the amount requested and in a �mely manner.
Capacity is also the maximum rate of produc�on. An organiza�on marke�ng and selling ro�sserie chicken should be able to produce and deliver chicken in sufficient
quan��es to sa�sfy consumer demand during lunch and dinner �mes when demand peaks. Mee�ng customer demand requires the acquisi�on of physical facili�es,
the hiring and training of qualified people, and the acquisi�on of materials to achieve the desired produc�on level. The following important ques�ons about
capacity planning are addressed in this chapter:

How can management es�mate capacity?
What is system capacity, and why is it important?
How can capacity decisions be made to gain a compe��ve advantage for
the organiza�on?

Role of Capacity Planning

Capacity planning is very important because significant capital is usually
required to build the facili�es and purchase the equipment to build capacity.
Crea�ng a series of large server farms to support the Internet and data
communica�ons requires substan�al investment. Millions of dollars are
required to build a brewery, a hospital, or a kni�ng produc�on line to make
sweaters. These expenditures are for fixed assets that are expensive to
maintain and even more expensive to change. Capacity decisions require
careful considera�on of an organiza�on’s long-term objec�ves and the market
demand. Capacity decisions must be consistent with current and an�cipated
demand.

Organiza�ons should be flexible in order to meet future as well as present
capacity requirements. Flexibility can allow managers to:

Adjust produc�on volume to respond to changes in customer demand.
Produce different products on the same equipment (product mix) to respond to changing customer needs.
Alter product technology and process technology to maintain or improve an organiza�on’s compe��ve posi�on.

Real World Scenarios: Meijer Superstores

Meijer superstores provide consumers with a full range of food products as well as a diverse range of other products, such as spor�ng goods, automo�ve
supplies, clothes, and lawn care equipment. Meijer’s concept is twofold: 1) build big stores that have high sales; and 2) aggressively expand the number of
stores. In addi�on to the advantage of one-stop shopping, Meijer’s large capacity stores offer other advantages.

The average purchase made by each customer should be higher because of the wide product variety. Although most tradi�onal grocery items such as bread,
rice, and milk have very low profit margins, products like microwaveable hamburgers, organic products, free-range chicken, and in-store bakery goods have
higher margins and these boost profits.

Larger capacity allows Meijer to spread the fixed cost of a store over a greater sales volume, thereby reducing costs and increasing profits. For example, when
more customers shop at Meijer, the cost of floor space, food display racks, and checkout facili�es remain unchanged. These are simply u�lized at a higher
level. Hea�ng and ligh�ng costs are also unaffected by these addi�onal shoppers, for the most part. Meijer is crea�ng economies of scale by serving more
customers with the same facili�es and equipment. Examples of variable costs for Meijer include staffing levels for checkout counters and spending for items
such as eggs and milk when customers buy more. Meijer also has installed self-checkout facili�es that take less space and reduce labor costs at checkout to
increase facility u�liza�on and to enhance produc�vity.

Meijer is also spreading the fixed costs of corporate opera�ons over more stores by rapidly expanding the number of new stores. In addi�on to cu�ng the
per-store share of these corporate-level fixed costs, expansion gives Meijer more buying power, which enables it to nego�ate be�er prices and delivery
schedules from suppliers.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 35/55

©Mike Derer/ Associated Press/AP Images

8.2 Estimating and Altering Capacity

Before es�ma�ng capacity, it is necessary to recognize the difference between theore�cal or ideal capacity and achievable capacity. Theore�cal capacity is what a
service firm or a manufacturer can produce under ideal condi�ons for a short period of �me. Under ideal condi�ons there are no equipment breakdowns,
maintenance requirements, material problems, or worker errors. While organiza�ons strive to eliminate these unproduc�ve delays, allowances for these elements
must be made in order to develop realis�c es�mates of capacity.

To es�mate capacity, managers must first select a way to measure it. In some cases, the choice is obvious, for example, tons per hour of steel or kilowa�-hours of
electricity. A hospital can use beds as a measure of capacity. Thus, a hospital with 100 beds that are available 365 days per year has a capacity of 36,500 pa�ent-
days each year. Hospitals measure the number of pa�ents admi�ed and how long each stays so they can calculate pa�ent-days consumed. A comparison of pa�ent-
days consumed and pa�ent-days available gives the opera�ng ra�o shown below.

*Throughout this text, to enlarge the size of the math equa�ons, please right click on the equa�on and choose “se�ngs” then “scale all math” to increase the
viewing percentage.

In general, the opera�ng ra�o is calculated according to the following equa�on:

Finding a yards�ck to es�mate capacity is more difficult in a restaurant than in a hospital because there is no uniform product on which the measurement can be
based. Capacity could be measured in terms of people served, meals prepared, or the ability to generate sales dollars. It is management’s responsibility to select
the appropriate measure and apply it.

Once the measure has been selected, es�ma�ng capacity involves the following steps:

1. Determine the maximum rate per hour of the produc�on equipment.
2. Determine the number of hours worked in a given �me period.
3. Mul�ply those two numbers.

Capacity can be changed by changing the number of hours worked in a �me period, or by changing the produc�on rate. The number of hours worked per �me
period is affected by several factors, including over�me, mul�ple shi�s, down�me for preven�ve maintenance, and allowances for unplanned equipment failure.

Problem

Given the following informa�on on maximum produc�on rate and hours worked for an oven that cooks pizzas, determine the capacity per week.

Maximum produc�on rate = 40 pizzas/hour
Number of hours = 84 hours/week

Over�me = 0 hours/week
Preven�ve maintenance = 0 (because it is performed a�er closing)

Equipment failure = 2% of planned hours
(Unplanned down�me)

Capacity/week = (40 pizzas/hour)(84 + 0 – 0 hours/week)(1 – 0.02)
= 3,292.8 pizzas/week

The hours worked per week is reduced from 100% to 98% of the available hours because of the 2% down�me an�cipated for equipment failure.

Several management decisions affect capacity. For example, increases in the
amount and quality of preven�ve maintenance could increase capacity by
reducing unexpected equipment failure. Other decisions affect capacity by
changing the produc�on rate. The following decisions are examined in this
sec�on:

Changing the mix of products produced by the facility.
Adding people to the produc�on process.
Increasing the mo�va�on of produc�on employees.
Increasing the machine produc�on rate.
Improving the quality of the raw materials and the work in process.
Increasing product yield.

Product Mix

An organiza�on’s product mix is the percentage of total output devoted to
each product. For example, an agency may sell life, house, and automobile
insurance. How does product mix effect capacity? It may take more of anProcessing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 36/55

An organiza�on’s product mix is the percentage of total output devoted to each product.
Johnson & Johnson is a large corpora�on with an expansive product mix including consumer
and pharmaceu�cal products such as Tylenol and BAND-AIDs.

agent’s �me to sell life insurance than automobile insurance. Consequently, a
shi� in demand toward life insurance policies reduces an agent’s selling
capacity. In theory, the agent should earn more money selling life insurance to
compensate for the extra �me. Otherwise, the agent will favor house and auto
insurance.

Problem

Assume that each contact for life insurance takes three hours, house insurance takes two hours, and automobile insurance requires one hour. What are the
capaci�es of an agent who works 40 hours per week under Mix 1 and Mix 2?

Type Mix 1 Mix 2

Life insurance 0.20 0.40

House insurance 0.30 0.40

Automobile insurance 0.50 0.20

Begin by calcula�ng the produc�on rate for each type of insurance. These produc�on rates represent what an agent could do if he or she sold only that type
of insurance.

Produc�on Rate = (hours worked per week)/(hour required per unit)

Produc�on RateLife = (40 hrs./wk.)/(3 hrs./unit) = 13.33 contacts per week

Produc�on RateHouse = (40 hrs./wk.)/(2 hrs./unit) = 20 contacts per week

Produc�on RateAuto = (40 hrs./wk.)/(1 hr./unit) = 40 contacts per week

Now calculate the capacity for one week if Mix 1 is assumed. Now, the agent’s �me is divided among the various types according to the mix.

PR = (13.3 contacts/wk.)(0.2) + (20 contact/wk.)(0.3) + (40 contacts/wk.)(0.5)

= 28.67 contacts/wk.

As an exercise, calculate the capacity if Mix 2 is assumed. (The answer should be 21.33 contacts per week.) Thus, as the mix shi�s away from automobile
insurance to life and house insurance, which require more �me per contact, the capacity of an agent as measured by the number of contacts declines. If an
average selling price for each type of contract can be determined, it would be possible to calculate the capacity of a sales person when genera�ng revenue on
a daily, weekly, or monthly basis.

Product mix issues are also relevant in manufacturing. A steel company produces steel of many alloys, shapes, and sizes, and these differences require different
produc�on processes and �mes. For example, the sheet steel that forms the body of an automobile or an appliance is produced in many widths. A 60-inch piece
may be needed for the hood, and a 40-inch piece may be needed for a door panel. The mill that rolls these widths takes about the same amount of �me per foot
regardless of width. Therefore, a mill with a heavy mix of 40-inch pieces will be able to produce fewer tons per hour than a mill with many 60-inch pieces. What is
the capacity of the processing equipment, and what are the units of capacity? Steel is measured in tons per hour, but those who es�mate capacity realize that
capacity changes as the mix of steel changes because different products have different produc�on rates. Therefore, product mix must be es�mated before capacity
can be es�mated.

Problem

Assume that a company uses steel that is 1/8-inch thick and has a density of 0.2833 pounds per cubic inch. The machines roll steel for 80 hours per week at
an average speed of 30 inches per second. The company produces both 40- and 60-inch widths of steel and wants to determine the capacity of each of the
following product mixes.

Size Mix 1 Mix 2

40 inches 80% 50%

60 inches 20% 50%

The company’s produc�on rate can be calculated as follows:

Produc�on rate (PR) = (produc�on rate for 40-inch)(mix for 40-inch) + (produc�on rate for 60-inch) (mix for 60-inch)
Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 37/55

Labor Rela�ons; CNBC Titans: Procter and Gamble

The produc�on rate for the 40-inch size (PR40) can be determined as follows:

PR40 = (width)(thickness)(processing rate inches/hour)(density)
     = (40 in)(1/8 in)(30 in/sec)(3,600 sec/hr)(0.2833 Ibs/cubic in)

     = 152,982 Ibs/hr

This would be the produc�on rate if only the 40-inch size were produced. Calculate the produc�on rate for the 60-inch size, which is 229,473 pounds per hour.

Now calculate the overall produc�on rate if Mix 1 is assumed.

PR = (152,982 Ibs/hr)(0.8) + (229,473 lbs/hr)(0.2)

   = 122,385.6 lbs/hr + 45,894.6 lbs/hr

   = 168,280.2 Ibs/hr

Convert this figure to tons per hour.

Next, convert the produc�on rate into an es�mate of capacity for a week.

Capacity for Mix 1 = (PR of mix 1)(hours worked)

= (84.14 tons/hr)(80 hrs/week)

= 6,731.2 tons/week

Calculate the capacity if Mix 2 is assumed, which is 7,649.1 tons per week. Thus, as the mix shi�s from 40-inch to 60-inch steel, the capacity increases. Capacity is
influenced by product mix.

Adding People

Adding people to an opera�on may increase the maximum produc�on rate. This increase occurs when the opera�on is constrained by the amount of labor assigned
to the job. The capacity of both service opera�ons and manufacturing opera�ons is affected by adding or elimina�ng people. Organiza�ons that are successful need
to be willing and able to adapt to change. Part of being able to adapt is having flexibility to meet changes in demand. The following example illustrates the
flexibility available to an organiza�on in mee�ng varying levels of demand.

Problem

To assemble the frames for 25 rocker/recliner chairs, each assembler takes his or her work order to the inventory clerk to pick the parts required to make the
chairs. This takes about 30 minutes. A�er returning to the work area, each assembler completes 25 chair frames in 3 1/2 hours. To increase the capacity to
assemble chair frames, a separate stock picker could be hired to gather inventory for all the assemblers. Then each assembler would be able to increase
produc�on by 1/7 because the 30 minutes consumed in stock picking could now be used to assemble chairs. Therefore, each assembler could assemble for 4
hours rather than 3 1/2 hours. One stock picker could serve eight assemblers. The capacity improvement is calculated here.

Increasing Motivation

Another way to increase the produc�on rate for an opera�on with labor constraints is to
increase mo�va�on. Substan�al increases in produc�on rates can be achieved when workers
feel they are an important part of the opera�on. These produc�vity increases do not require
addi�onal labor costs or extra investment in equipment. The people work harder to
accomplish more when they have an emo�onal or financial stake in the organiza�on.

There has been a growing awareness among both management and labor that communica�on
and coopera�on offer be�er opportuni�es for success than sharp-tongued rhetoric, lockouts,
and strikes. Evidence of this willingness to cooperate exists in almost every industry as
organiza�ons fight for market share and workers fight for jobs in the increasingly global
environment. In the automo�ve industry, labor has agreed to liberalize work rules so that
produc�vity can be increased. For example, some facili�es have reduced the number of job
classifica�ons from 100 to only a few, making it possible to perform simple maintenance tasks
with one or two employees rather than five or six. Management has agreed to profit sharing,
which allows the workforce to share in the benefits of these simplified work rules.
Management has also begun to recognize the talents of its labor force and has encouraged
employee involvement in what used to be exclusively management domain: decision making.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 38/55

A pizza oven is an example of a machine constraint. To increase capacity, new machines
must be purchased or exis�ng machines must be operated more efficiently.

©iStockphoto/Thinkstock

Labor is learning to accept efforts to improve automa�on because workers see that cu�ng
costs and enhancing quality can lead to the best kind of job security, that is, increasing sales.
Shared decision-making has not only caused increased coopera�on, but it has created more
mo�vated employees, thus providing the following benefits to organiza�ons:

Organiza�ons can tap into talent that already exists in their workforce.
Workforces are more recep�ve to training and new ideas.
People work harder and smarter.

Increasing Machine Production Rate

In an

opera�on that is machine constrained, adding people will not increase
capacity. Machine constrained means that the equipment is opera�ng for
all the available �me at its best speed, while the operators have some idle
�me. For example, if a pizza oven can bake 40 pies per hour, and the staff
can assemble 60 pies per hour, then the process is machine constrained.
To increase capacity, either new machines should be purchased or exis�ng
machines should be operated more efficiently.

One possibility that was men�oned earlier is to increase preven�ve
maintenance so that down�me due to machine failure will be reduced or
eliminated. Another approach is to develop procedures that more

efficiently u�lize exis�ng machines. With con�nuing process improvements there is usually a way to improve a machine’s produc�on rate. A procedure could be as
simple as finding a faster and be�er way to load pizzas into the oven or increasing the heat in the oven to cook pizzas faster.

Improving Quality

Improving quality can o�en increase the capacity of opera�ons. Simply stated, if an opera�on produces a product of inferior quality and the product is rejected, the
capacity used to produce that product is wasted. Poor quality gives the organiza�on’s customers a bad impression of its product, and also robs opera�ons of
needed capacity. Consider the following case.

Real World Scenarios: Downey Carpet Cleaning

Downey Carpet Cleaning is a family-owned business that cleans carpets, furniture, and drapery. It also performs general housekeeping services. For several
years, Downey has offered a carpet service that thoroughly cleans high-traffic areas at one low price although some compe�tors charge extra for high-traffic
areas. Why should Downey charge the lower rate? According to the owner, who is also the manager, it is a sound business decision.

A callback to clean a carpet a second �me for a dissa�sfied customer takes as much �me as making two regular carpet-cleaning stops because regular stops
are scheduled to avoid as much nonproduc�ve travel �me as possible. Callbacks o�en require much longer drives. Each callback robs Downey of capacity and
addi�onal poten�al revenue. Compara�vely, the extra �me and money for the chemicals needed to clean the high-traffic areas right the first �me are small.

The typical carpet-cleaning worker can perform 10 jobs per day with an average revenue of $43 per job. One callback for which the company receives no
addi�onal revenue causes Downey to lose $86 in revenue. The company misses out on two regular jobs at $43 per job. Plus, the out-of-pocket costs for the
chemicals to clean the carpet a second �me, and the costs of opera�ng the truck for the return trip are incurred. In one day, the extra costs of the chemicals,
and the �me for the worker to complete all 10 jobs correctly the first �me is less than $20. By avoiding callbacks, Downey is able to increase its capacity. In
addi�on to a sound financial policy, customers also like the policy and frequently have Downey return for other services as well as for their next carpet
cleaning.

Increasing Product Yield

In many opera�ons, the quan�ty of output is less than the quan�ty of input. In other words, some inputs are lost during the produc�on of a good or service. Yield
is the ra�o of the quan�ty of output to the input quan�ty.

Yield is a func�on of the characteris�cs of the process for producing the product. For example, an oil refinery begins with one barrel of crude oil, but when it is
finished, there is less than one barrel of finished product. Small amounts evaporate, are spilled, or are otherwise lost in the produc�on process. Some is burned as
waste gas. The yield is the percentage of the output that is a useful product. A 96% yield means 96 of every 100 barrels of input are made into useful products. If a
refinery’s engineers find methods to increase the yield by 1%, the refinery will have more product to sell, which increases effec�ve capacity. Making movies follows

Labor
Relations
From
Title:

CNBC Titans: Procter & Gamble
(https://fod.infobase.com/PortalPlaylists.aspx?
wID=100753&xtid=47298)

 0:000:00 / 2:02 / 2:02 1x1x

Processing math: 0%

https://fod.infobase.com/PortalPlaylists.aspx?wID=100753&xtid=47298

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 39/55

When filming a movie, a director o�en shoots excess footage
and then edits it, removing scenes to create the final version of
the film. An increase in yield would mean shoo�ng less “extra”
footage.

Comstock Images/Thinkstock

a similar process. A director may shoot eight hours of film but may edit the film so that the final movie
is two hours or less. The extra �me used to shoot the movie costs money and prevents using the
actors, sound stage, loca�ons, cameras, and equipment to make other movies. Increasing yield would
mean shoo�ng less than eight hours of film to make the two-hour movie.

Highlight: Intel and Computer Chips

A�er Intel introduces new computer chips, it usually experiences a drama�c improvement in yield during produc�on. Ini�ally, the number of chips that meet
standards may be only 60%. As the company learns more about the process, the yield may increase to 90% or more. This 30-point increase in yield leads to
50% more product to sell. (Previously only 60 of 100 chips could be sold. Now 90 chips, that is, 30 more, are available.) Thus, capacity is increased. Because
these 30 addi�onal chips add no produc�on cost, most of the revenue from their sale contributes directly to the company’s bo�om line. For Intel, moving up
the yield curve as quickly as possible has a substan�al impact on mee�ng customer demand and on increasing profitability.

Points to Consider

Capacity es�ma�on is a necessary prerequisite to capacity planning. Without knowledge of the exis�ng limits on capacity, meaningful capacity planning or
produc�on planning cannot take place. As the earlier sec�on indicates, capacity is not a fixed number. Capacity is a func�on of management ingenuity. It can be
influenced by good planning, good opera�ng procedures, effec�ve maintenance programs, and other management decisions. One of the important responsibili�es
of opera�ons managers is to inves�gate ways to increase capacity before inves�ng substan�al capital in new facili�es.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 40/55

8.3 Determining System Capacity

Un�l this point, the discussion of es�ma�ng and improving capacity has focused on only one machine or one opera�on within a company. The reality is that
opera�ons are a combina�on of different machines, equipment, and processes that make finished products. To plan effec�vely, management must know the
capacity of the en�re produc�on system, not just the capacity of individual parts. System capacity is the ability of the organiza�on to produce a sufficient number
of goods and services to meet the demands of customers. The capacity of an insurance company is not dependent only on the capacity of its sales personnel, the
capacity of a hospital is not set only by the number of surgery rooms, and the capacity of a pizza parlor is not determined only by the capacity of its ovens.

For convenience, the term department is used when referring to a por�on of the produc�on system. To analyze system capacity, it is important to determine how
departments are related. The two basic arrangements, product layout and process layout, are discussed in Chapter 7 and are also used here.

Product Layout

Product-oriented layout is characterized by high demand for the same or similar products. Examples include refining steel, making paper, and processing checks in a
bank. In this arrangement, there are few, if any, product varia�ons, and the layout fits the dominant flow of the product—thus, the name “product layout.”

For example, to make paper, wooden logs are ground and chemically treated to produce a watery mixture called pulp. The pulp is pumped to the papermaking
machine where excess water is gradually squeezed out, leaving a thin sheet of wet paper. The wet paper passes through a series of dryers that remove most of the
remaining moisture. The paper is then rolled into logs that can be 30 feet wide and several feet in diameter. These huge logs are later cut into many different
widths. Most types of paper are made using the same process and follow the same flow (see Figure 8.1).

Figure 8.1: Product-oriented layout of paper mill

Process Layout

Process-oriented layout is characterized by the produc�on of many different products with the same equipment and low volume of any individual product. No
single product has enough volume to support a dedicated set of machines. Each product has different produc�on requirements that place different demands on the
equipment. Examples include a machine shop that produces specialty automo�ve parts for racing engines, a hospital emergency room, and an automo�ve repair
shop that offers a wide variety of services. In this arrangement, the layout is grouped by similar machine types because there is no dominant product flow—thus
the name “process layout.”

An automo�ve center contains the equipment to analyze a variety of mechanical problems. As seen in the following list, different customers desire a different set of
services. The facili�es are arranged by process because there is no dominant flow (see Figure 8.2).

Figure 8.2: Process-oriented layout of an automo�ve service
center

Customer Services Requested

A Tires, shock absorbers, wheel alignment

B Tires, brakes, tune-up

C Brakes, tune-up, exhaust system

D Tires, brakes, shock absorbers, muffler

E Shock absorbers

The capacity of the product-oriented and process-oriented layouts is determined by analyzing the capacity of individual departments. Approaches to determining
the capacity of both layouts are discussed next.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 41/55

Product Layout and System Capacity

The capacity of a product-oriented system can be visualized as a series of pipes of varying capacity, with the smallest diameter or capacity holding back the en�re
system. Figure 8.3 shows five pipes (departments or machines) with different diameters (capaci�es). The output from one pipe becomes the input to the next un�l
the finished product exits pipe number five. In Figure 8.3, pipe number two cannot handle all the flow that pipe number one can deliver and, therefore, it restricts
the flow. Because of pipe number two’s limited capacity, it restricts the flow from upstream pipes and starves the downstream pipes. Pipes three, four, and five can
work on only what pipe two can deliver. This restric�on is called a bo�leneck, and it determines the system’s capacity.

Figure 8.3: A bo�leneck in the product flow

Analysis of System Capacity

In a product-oriented layout, iden�fying the bo�leneck is cri�cal. The importance of this analysis cannot be overstated because the results are used not only in
determining capacity, but also in planning and scheduling produc�on, which are discussed later in the book.

The approach to determining the bo�leneck is illustrated in Figure 8.4. Start at the beginning of the system, and determine the capacity of the first opera�on or
department. This is the system capacity so far. Use this capacity as the input to the next department in the sequence. Can that department take the total input
from the previous department and process it completely? If it can, then the system capacity has not changed. If it cannot, then the system capacity is reduced to
the capacity of that department. The procedure con�nues un�l the end of the process is reached and the system capacity is known.

Figure 8.4: A sequen�al approach to bo�leneck
analysis

Consider the example shown in Figure 8.5. The basic oxygen furnace has a maximum rate of 4,200 tons per day (tpd), while the con�nuous caster’s rate is 6,000
tpd. According to the example, the capacity of that part of the system is limited by the capacity of the slower department.

Figure 8.5: Simple steel produc�on flow

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 42/55

Determining the Bo�leneck

Now consider the en�re system for making steel shown in Figure 8.6. The capacity of a department is listed below the department name. At two points in the
steel-making process, outputs from two departments are inputs to a single department. The ra�o of each input is listed above the arrow that illustrates the flow.
For example, in the blast furnace, three pounds of iron ore are mixed with one pound of coke. This is like a recipe for a cake, three cups of flour to one cup of
sugar, or three parts gin and one part vermouth for a mar�ni. The capacity to mix mar�nis depends on both gin and vermouth. To supply the blast furnace with
what it needs, iron ore and coke oven output should be combined in the correct propor�on un�l at least one of these inputs is exhausted or un�l the capacity of
the blast furnace is completely consumed.

Figure 8.6: Steel produc�on flow: a product layout

What is the system capacity? Follow along in Figure 8.6. Iron ore processing and coke ovens can deliver 3,000 and 1,000 tpd, respec�vely. (Only 3,000 tons can be
used from iron ore processing because of the ra�o requirements.) The combined 4,000 tpd is more than sufficient for the blast furnace, which can process only
3,000 tpd total. So far, the blast furnace is holding back produc�on. The blast furnace and scrap handling, in turn, supply 3,000 and 1,500 tpd, which is more than
adequate for the basic oxygen furnace capacity of 4,200 tpd. Because the basic oxygen furnace cannot process all available inputs, the blast furnace cannot be the
bo�leneck. The basic oxygen furnace cannot deliver sufficient output to the remaining departments. Therefore, the basic oxygen furnace is the bo�leneck for the
system, and the capacity of the system is 4,200 tpd.

To calculate the produc�on rates that allow the system to produce 4,200 tpd, begin at the bo�leneck department in Figure 8.7. Trace the product flow from the
bo�leneck to the beginning and the end of the process. In order to achieve 4,200 tpd of basic oxygen furnace input, (2/3)(4,200) = 2,800 tpd comes from the blast
furnace and (1/3)(4,200) = 1,400 tpd comes from scrap. The requirements are listed above each department. The blast furnace requires (3/4)(2,800) = 2,100 tpd of
iron ore and (1/4)(2,800) = 700 tpd of coke. Moving from the basic oxygen furnace to the end of the process is simpler because there are no pairs of departments.
The requirement for those departments is 4,200 tpd. When making steel, each opera�on in this process would suffer a yield loss, which is not considered here in
order to simplify discussion.

Figure 8.7: Determining system capacity

Rounding Out System Capacity

It is also important to know which department, machine, or step in the process restricts the system’s capacity. An opera�ons manager may be charged with
increasing the system’s capacity. If he or she tries to do so by increasing blast furnace capacity, there will be no increase in the system’s capacity. This organiza�onProcessing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 43/55

could spend hundreds of millions of dollars on a new blast furnace without producing one addi�onal ton of steel because the bo�leneck constricts the flow, and
the bo�leneck is the basic oxygen furnace.

The system capacity can be increased by applying resources to the bo�leneck department. This approach is called rounding out capacity because resources are
applied to the bo�leneck to bring it into balance with other parts (departments) in the system. Rounding out capacity has a limit, however. Simply stated, if the
opera�ons manager doubles basic oxygen furnace capacity because it is the bo�leneck, the system’s capacity will not double.

There is not enough capacity in other departments to absorb that large an increase. As a result of doubling basic oxygen furnace capacity, the bo�leneck simply
jumps to another department. Managers should understand this issue and carefully analyze the effect on the system when departmental capacity is increased.

An important and useful piece of informa�on is how far the system’s capacity can be increased before another bo�leneck appears. To answer this ques�on,
examine the requirements listed above each department in Figure 8.7. A quick review shows that scrap handling and the blast furnace will be bo�lenecks as basic
oxygen furnace capacity is increased. With a cushion of 100 tons per day in scrap handling, the capacity of the system could increase by only 300 tpd. (Remember
that one part scrap and two parts hot metal from the blast furnace are required.) The scrap handling and blast furnace departments have insufficient capacity to
handle an increase of more than 300 tpd in basic oxygen furnace capacity.

Another way of thinking about it is to simply set the capacity of the present bo�leneck to infinity and rework the problem. The results are shown in Figure 8.8. The
system’s capacity is 4,500 tpd. There are two bo�lenecks: blast furnace and scrap handling. Remember, the basic oxygen furnace capacity was set to infinity. It
actually does not need to be infinitely large, but it must be 4,500 tpd or more if the system capacity is 4,500 tpd.

The analysis of system capacity and associated bo�lenecks is extremely important to determine capacity. Ra�onal decisions about capacity can be made only if
these concepts are fully understood.

Figure 8.8: Rounding out capacity

Process Layout and System Capacity

The process-oriented layout is characterized as a mul�ple-product facility with low volume per product. The products are different from one another and usually
require different methods and procedures in produc�on. There is no dominant product flow to guide the arrangement of departments as there is in the paper or
steel industry, so similar opera�ons are grouped together. The process-oriented layout does not have enough volume in any one product to require dedicated
specialized produc�on facili�es.

A medical center is an example of a process-oriented opera�on. Pa�ents are screened at the recep�on desk to determine the nature and seriousness of their
injuries, and then proceed to a wai�ng room to be called by a nurse or physician. A�er an ini�al examina�on, the method of treatment for each pa�ent is
determined. Each treatment could be different and is based on the pa�ent’s individual needs. A pa�ent in an automobile accident may be scheduled for X-rays,
orthopedic surgery, and applica�on of a cast. The next pa�ent may have heart problems. Each follows a different path through the medical center. The equipment
should be flexible enough to handle a wide range of needs. For example, X-ray machines can provide images of legs, feet, hands, and other areas of the body.

Analysis of System Capacity

Determining system capacity in a process-oriented layout is more complex than doing so in a product-oriented layout. In the process layout, each product does not
follow the same path through the system. The func�ons and machines are grouped into departments, and different products follow different paths. The layout
shown in Figure 8.9 has six departments and four different pa�erns of treatment or products. The departments’ capaci�es are given in pa�ents per week (ppw) and
are based on average �me per treatment.

Figure 8.9: A process layout of a medical center

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 44/55

System capacity is not merely a search for the minimum department capacity because there is no dominant flow. The capacity of the system is a func�on of the
jobs presented. If the medical center only processed one type of pa�ent, the system capacity could be easily and accurately es�mated. If all the pa�ents arriving at
the medical center are type-A pa�ents (those needing orthopedic care), the capacity of the system will be 250 pa�ents per week. In the very specific and highly
specialized case, the analysis is like that of a product layout. This is completed by finding the minimum capacity for departments 1, 2, and 3. If all pa�ents are of
type B, then the capacity will be 500 pa�ents per week. For pa�ents of types C and D, the system capaci�es are 300 and 400 pa�ents per week, respec�vely. The
following table shows the various capaci�es if all of the pa�ents in one week were a single type. This is not likely to occur, so the system’s capacity is a func�on of
the job types presented. This is called the product mix or, in this case, pa�ent mix.

Mix System’s Capacity Bo�leneck Department

100% A pa�ents 250 ppw Orthopedic care

100% B pa�ents 500 ppw Cardiology

100% C pa�ents 300 ppw Neurology

100% D pa�ents 400 ppw X-ray

Product Mix and Capacity in a Process Layout

What would the system capacity be if the medical center processed all four types during the same week? To simplify the problem, assume that only type A pa�ents
arrive on Monday and Tuesday, type B on Wednesday and Thursday, type C on Friday and Saturday, and type D on Sunday. The system capacity per week for that
mix would be calculated as follows:

The frac�ons in the preceding equa�on are the pa�ent mix. A different assump�on concerning the number of days per week assigned to each pa�ent type would
cause a different product mix and would result in a different system capacity.

In reality, not all orthopedic care pa�ents (type A) will arrive on Monday and Tuesday. The method illustrated in the prior calcula�on is likely to underes�mate the
system capacity because we have assumed that no pa�ent other than an orthopedic pa�ent arrives on Monday or Tuesday. However, the system does have the
capacity to process type B, C, and D pa�ents on Monday and Tuesday in addi�on to (2/7) (250 ppw) = 71.4 type A pa�ents. How can managers of a medical center
get an accurate es�mate of system capacity and determine which department is the bo�leneck? An o�en-used technique for es�ma�ng capacity in a process layout
is simula�on.

In this approach, an es�mate of product mix (pa�ent mix) is used to randomly generate arriving pa�ents. The �me to service each pa�ent is based on historical
data, and is also randomly generated. The simula�on is run for a long period of �me, and sta�s�cs about the number of pa�ents served and the use of each
department are kept. U�liza�on data should be kept regularly for equipment in a process layout so that bo�lenecks can be an�cipated and correc�ve ac�on taken.
Management can change the mix of arriving pa�ents in the simula�on to determine how the system capacity and bo�leneck department change. A different mix
places different demands on the resources. Managers should plan for the present mix of pa�ents and the associated bo�leneck, as well as for the mix of
possibili�es that the future holds.

Capacity Decisions for Service Operations

Most of the concepts discussed in this text apply to producers of services and producers of goods. It is important to note, however, that service opera�ons are
different from manufacturing opera�ons in some aspects. First, services are direct and cannot be inventoried. Whereas the consump�on of goods can be delayed,
the general rule is that services are produced and consumed simultaneously. This means that service organiza�ons must (1) build enough capacity to meet
maximum demand, (2) manage demand so that people will use the services at off-peak �mes (allowing long wai�ng lines to occur is one way, albeit a poor way, to
manage demand, and offering monetary incen�ves to use the service at off peak �mes is another way), or (3) choose not to sa�sfy all the demand.

Each of these op�ons has a cost. Building sufficient capacity to meet maximum demand can mean that a significant por�on of the capacity is used infrequently.
This can mean large capital expenditures with limited return on investment. People who must wait in long lines for service may become dissa�sfied, and that will
result in a loss of business. For example, a hospital that has long lines in its emergency room is likely to lose business to another emergency room that is be�er
organized and has a shorter wait �me. Choosing to ignore demand means a loss of customers that may have both short- and long-term effects.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 45/55

Services cannot be inventoried and are typically produced and consumed simultaneously.
Consequently, service organiza�ons must effec�vely manage demand. Although it is not the
most efficient method, allowing long wai�ng lines to occur is one way to manage demand.

©Klaus Lahnstein/Stone/Ge�y Images

Second, there is o�en a high degree of producer-consumer interac�on during
the produc�on of a service. This interac�on frequently introduces a significant
amount of uncertainty about processing �me, and processing �me is a
determinant of capacity. For example, a person wai�ng in line at a bank may
have one or many transac�ons to perform and may be skilled or unskilled at
communica�ng his or her needs. This varia�on makes it more difficult to
es�mate the capacity required to meet customer demands.

Third, many services are not transported to the customer, so the customer
must come to the service delivery system. This has important implica�ons for
the loca�on decision. It also means that capacity decisions should result in
adequate space for the customer in the service delivery system. For example,
many restaurants use a generous bar area to deal with excess demand in the
dining area.

Service Operations and System Capacity

Despite differences, determining system capacity and finding where a
bo�leneck occurs applies to service as well as manufacturing opera�ons. The
principles are the same, but in some cases the applica�on is different. In the
following case, managers of an upscale restaurant chain are a�emp�ng to
determine the capacity of their restaurant.

Problem

The flow of people through the restaurant follows this sequence. People arrive at the restaurant and park their cars. According to the records that the
restaurant keeps, 20% of the guests spend �me in the bar. The remaining 80% of the arrivals go directly to the dining area.

According to standards that management has developed over the years, each dinner served per hour requires approximately four square feet of kitchen space.
Listed below are the resources of the restaurant:

Department/Area Capacity/Size

Parking area 100 spaces

Bar area 80 seats

Dining area 200 seats

Cooking area 600 square feet

On average, 2.2 people arrive per car, only 80% of the seats in the bar are normally available because tables for four are some�mes occupied by two or three
people, and only 85% of the dining area seats are normally available for the same reason. The average stay is 90 minutes. Everyone in the dining area orders a
meal, and 40% of the people in the bar area order a meal. What is the capacity of the system? To begin, the capacity of each area can be calculated in terms
of persons served per hour.

Department/Area Capacity/Size

Parking area (100 spaces)(2.2 people/car)/(1.5 hrs.) = 147 people/hr.

Bar area (80 seats) (0.8)/(1.5 hrs.) = 43 people/hr.

Dining area (200 seats)(0.85)/(1.5 hrs.) = 113 people/hr.

Cooking area (600 square feet)/(4 square feet/meal) = 150 people/hr.

If every customer spent �me both in the bar and in the dining area, the system capacity would be easy to determine because each customer would place
demands on each area. This would make the restaurant product layout similar to the steel industry, and the system capacity would be the smallest of the four
department’s capaci�es. However, only a por�on of the guests use both the bar and the dining areas.

To calculate the capacity of the system and determine the bo�leneck department in this case, the approach illustrated in the medical center example
men�oned earlier could be used. That method requires tracking two different flows: one involving the dining area and a second following the bar area. The
process begins by selec�ng a level of demand that the restaurant can sa�sfy. If it cannot, the demand level is decreased, and another a�empt is made. If it
can, the demand level is increased. This trial and error method can quickly lead to the capacity if care is used in selec�ng the demand targets. This trial and
error approach could also be used to solve problems, such as the steel industry problem described earlier. Inspec�ng the department capaci�es indicates thatProcessing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 46/55

the system’s capacity cannot exceed 147 people per hour because that is the capacity of the parking lot, and the assump�on of this model is that all patrons
drive. It is also clear that the capacity of the system is at least 100 because all of the department capaci�es are at least 100, except for the bar area which
only serves 20% of the customers.

Therefore, the trial and error process begins by se�ng the arrival rate (demand) equal to 100 people per hour. This means that during each hour 100 people
use the parking lot, 20 people use the bar, 80 people use the dining area, and 88 people order a meal. People in the bar that order a meal eat the meal in
the bar. None of the individual departments is at capacity, so the analysis con�nues. The results are shown in the following table:

Set Demand Equal To

Department Area Capacity (People/ Hr.) 100 (People/ Hr.) 125 (People/ Hr.) 147 (People/ Hr.) 113/0.8 = 141 (People/Hr.)

Parking area 147 100 125 147 141

Bar area 43 20 25 29 28

Dining area 113 80 100 118 113

Cooking area 150 88 110 130 124

Next, what happens if demand is set at 125 people/hour? Assume again that none of the departments is at capacity. As a result, the system capacity must be
between 125 and 147 people/hour because the parking lot can hold no more than 147. With demand set at 147 people/hour, the parking lot is at capacity,
but demand in the dining area exceeds capacity. Bar demand is equal to (147) (0.2) = 29. Dining demand is equal to (147)(0.8) = 118. Cooking demand is equal
to 118 + (29)(0.4) = 130. At this point, the bo�leneck is the dining area, but the system capacity is not clear because only some use the dining room. To
determine the system capacity, divide the capacity of the dining area by 0.8, which is the percentage of customers that use the dining area. This calcula�on
yields the system capacity, which is 141 people per hour. If the system capacity is set equal to demand and the department demands are calculated again, the
excess capaci�es in the non-bo�leneck departments can be iden�fied. There is considerable excess capacity in the cooking area and in the bar, but the parking
lot is near capacity. Expansion plans, if jus�fied by demand, should be aimed at the dining area and the parking lot.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 47/55

8.4 Making Capacity Decisions for Competitive Advantage

Informed capacity decisions can be made only when management: (1) knows the ability of its present resources, which is achieved by accurately es�ma�ng system
capacity; (2) knows the bo�lenecks and what is causing them; and (3) has an es�mate of future demand. The first two topics have been the focus of the chapter to
this point. Es�ma�ng demand is discussed in the chapter on forecas�ng. Now, this informa�on can be used to discuss the capacity decisions listed below:

When to add capacity.
How much capacity to add.
Where to add capacity.
What type of capacity to add.

When to Add Capacity

Many managers argue that determining how much capacity an organiza�on requires should not be difficult. The real problem is obtaining an accurate forecast of
demand. These managers believe that once an es�mate of demand is obtained, it is simply a ma�er of se�ng capacity to meet demand. With knowledge of the
point at which demand equals capacity, and an es�mate of how long it takes to build addi�onal capacity, management subtracts the lead �me to determine when
to begin construc�on. In Figure 8.10, capacity is exceeded two years in the future. If it takes 18 months to add capacity, then management should begin
construc�on six months from today; however, the answer is not that simple. To avoid compounding the ques�on of when to add capacity with forecas�ng error,
assume that forecasts are guaranteed to be accurate.

As management considers the �ming decision in Figure 8.10, it should ask the following ques�on: should the capacity be added by the end of the second year? The
answer is probably no, for several sound reasons. Management could simply choose not to sa�sfy all of the demand during the third year. The forecast shows that
the significant and long-term increase does not take place un�l the end of year five. It is possible that the organiza�on has no long-term interest in the market and
would choose to allocate resources to other product. On the other hand, failing to fully sa�sfy demand may not be consistent with a company policy of building
market share. If the sales force is asked to increase market share, but opera�ons cannot deliver the product, then long-term damage to the firm’s reputa�on could
result.

Figure 8.10: Capacity versus demand

If ignoring the excess demand in the third year is not acceptable, then management must find a way to meet that demand. One possibility is to set the produc�on
rate higher than demand during the first and second years so that sufficient inventory is created to sa�sfy demand in the third year. Figure 8.11 illustrates this
point. Obviously, this solu�on is limited to goods produc�on because services have no finished goods inventory.

Figure 8.11: Capacity, demand, and produc�on rate

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 48/55

Other methods of dealing with the capacity shor�all in the third year can be understood by recalling the earlier sec�ons on capacity es�ma�on. Capacity is a
variable that is subject to change through management innova�on. If the opera�on runs two shi�s five days per week, then over�me or another shi� could be
considered. Be�er scheduling, improved opera�ng procedures, or improved quality of raw materials can increase capacity. Another important concept to remember
is system level capacity. To increase the capacity of a system, it is necessary to increase the capacity of only the bo�leneck opera�on. It may be possible to buy
produc�on capacity to supplement the bo�leneck opera�on and increase overall capacity.

How Much Capacity to Add

If addi�onal capacity is built, how much should be added? Again, assuming that the forecasted demand is accurate, consider the example in Figure 8.12 when
deciding how much capacity to add. In this example, the decision concerning when to add capacity has been made. Construc�on begins in the middle of the third
year, and the new capacity will come on line at the end of the fourth year.

Figure 8.12: How much capacity to add

Op�on 1 adds only enough capacity to handle the demand in the early part of the fi�h year. Op�on 2 adds enough capacity to handle the increase in the sixth
year. Whether Op�on 1 or Op�on 2 is selected, the company should understand the importance of focusing on the bo�leneck to increase system capacity. The
financial versus opera�ng tradeoffs of these op�ons are summarized here.

Advantages of Op�on 1

1. Limits short-term investment and risk. Changes in technology will not find the organiza�on with as much capital �ed up in outdated technology.
2. Limits unused capacity for which no return on investment is provided.

Advantages of Op�on 2

1. May reduce long-term investment. Building capacity at one �me instead of mul�ple �mes can help save on total construc�on costs.
2. May reduce infla�onary effects on construc�on costs by building now.

The primary ques�ons associated with Op�on 2 are:

How long will it be before the capacity is needed?
How likely is it that the forecasted need will occur?

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 49/55

How stable is the technology?

A firm producing products in an industry where the product or process technology is likely to change does not want to build plants that limit its long-term ability to
compete.

The decisions about when to add capacity and how much capacity to add are cri�cal capacity decisions that are complicated by the uncertainty in the es�mates of
future demand. Decision theory, which uses sta�s�cs and probability theory, can be used to model these decisions when forecasts are uncertain.

Where to Add Capacity

The decision on where to add capacity (usually called the loca�on decision) is complex and involves many factors. It is strategically important because it commits
significant resources to a loca�on. Great care and considera�on should be given to the long-term implica�ons. The loca�on decision is addressed in another
chapter.

What Type of Capacity to Add

In addi�on to determining how much capacity to add and when to add it, management should consider what type of capacity to add. Type of capacity can be
separated into a technological or engineering ques�on and an economy of scale or business ques�on. These topics are the focus of Chapter 7.

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 50/55

Chapter Summary

Capacity is a measure of an organiza�on’s ability to provide customers with demanded services and goods in the amount requested and in a �mely manner.
Capacity decisions are cri�cal to an organiza�on’s success because they commit significant resources to assets that usually cannot be changed easily or
economically. Capacity decisions should be based on the best es�mate of the future and should be made so that as much flexibility as possible is retained.
Capacity should also be obtained in the proper amount. Too much capacity means that money has been invested in resources that are not really needed. Too
li�le means that poten�al sales and market share are lost.
Es�ma�ng an organiza�on’s capacity is not easy because capacity is affected by management decisions regarding changing the number of hours worked,
changing the product mix, adding staff, improving worker mo�va�on, improving machine capabili�es, enhancing quality, and increasing product yield.
Machine and departmental capaci�es are needed to determine the capacity of the system. The capacity of a system can only be as much as its slowest
department, which is the bo�leneck.
An increase in system capacity can be achieved by increasing capacity in the bo�leneck department. This is called rounding out capacity.
Capacity decisions include the following: when to add capacity, how much capacity to add, where to add capacity, what type of capacity to add, and when to
reduce capacity.

Case Study

Beck Manufacturing

Al Beck, president of Beck manufacturing, wants to determine the capacity of his facility, which produces steering gears for auto manufacturers. He has asked you
to sort through the data and determine the capacity of the system and how that capacity may be increased. The opera�on is a product layout that produces large
numbers of nearly iden�cal products. The process includes milling, grinding, boring, drilling, and assembling, in that order. Each finished product requires one
opera�on on each type of machine. For example, each finished part is processed on one of the five milling machines, one of the seven grinding machines, etc.

The facility runs two 8-hour shi�s per day, with a third shi� for maintenance. The industrial engineering department has provided you with the following data on
present opera�ons. In addi�on, you have been told that assembly opera�ons, while not unlimited, can be easily changed to meet the need.

Opera�on Number of Machines Run Time per Piece (min.) % Reject Rate
Milling 5 2 3
Grinding 7 3 5
Boring 3 1 2
Drilling 6 2.5 7

1. Calculate the capacity of each machine center and the capacity of the system.
2. If Beck wants to expand capacity, where should he focus the company’s efforts? How much extra capacity can he get without causing another opera�on to become

the bo�leneck?
3. How may Mr. Beck expand capacity without purchasing new equipment? Be specific.

Discussion Ques�ons
Click on each ques�on to reveal the answer.

1. What is capacity, and why is it important?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Capacity is a measure of the organiza�on’s ability to provide customers with the demanded goods or services in the amount requested and in a �mely manner.
More specifically, capacity is the maximum rate of produc�on. Capacity for any period of �me such as a week, a month, or a year can be determined by
mul�plying the maximum hourly produc�on rate by the number of hours worked during the period. As noted in the text, many assump�ons are required to
support this calcula�on and great care should be used when interpre�ng the result.

Decisions to alter capacity are important to an organiza�on because significant capital outlays are generally required to build capacity. Also, the physical facility
is o�en a key resource in an organiza�on’s efforts to remain compe��ve.

2. Why is it difficult to es�mate capacity? Is capacity a constant? Why or why not?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

At first glance, es�ma�ng capacity appears to be nothing more than determining the maximum rate per hour for produc�on equipment, determining the
number of hours worked in a given �me period, and mul�plying the two numbers. Capacity is not a constant. It is a variable, which is a func�on of
management decisions. In most organiza�ons, managers can decrease the number of hours worked by shortening the work week as well as increase the
number of hours worked through over�me or addi�onal shi�s. Management can also control the number of hours worked in subtler ways. A properly
designed preven�ve maintenance program can reduce equipment failures.

In addi�on to the fact that hours can change, capacity is difficult to measure because the produc�on rate is influenced by management decisions. For example,
capacity can be increased by assigning addi�onal people to certain tasks, providing people with be�er tools, and improving procedures and methods for doing
work.

3. Should an organiza�on always a�empt to match its capacity to its es�mate of demand? Why or why not?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Processing math: 0%

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 51/55

Capacity decisions should be based on the organiza�on’s best es�mate of demand. While it is not necessary to exactly match capacity with demand, too much
capacity is damaging to the firm, because funds are invested in resources that are not really needed and could have been be�er commi�ed elsewhere. Too
li�le capacity means that poten�al sales and market share are being lost. Management of an organiza�on may have good reasons for absorbing the costs of
unused capacity or suffering the costs of lost sales. For example, management may an�cipate that sales will increase drama�cally within one or two years and
they prepare for it by maintaining some unused capacity because they are unsure when the increase will occur. In another case, management may choose to
phase out produc�on of a product or product line because they do not see strong profits in the future.

4. Capacity decisions are strategically important. Agree or disagree with the statement, and support your posi�on.
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Capacity decisions are indeed strategically important. First, capacity is a measure of the organiza�on’s ability to provide its customers with the demanded
goods or services in the quan�ty demanded and in a �mely fashion. This has much to do with the organiza�on’s ability to execute its mission and achieve its
objec�ves. Second, capacity decisions effec�vely commit significant organiza�onal resources to long-term assets that cannot be easily or economically changed.
These are resources, which undoubtedly have opportunity costs a�ached.

5. What factors influence the capacity of an organiza�on? List three factors, and explain how they influence capacity.
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

The mix of products produced by an organiza�on can influence capacity. Adding people to an opera�on may increase the maximum produc�on rate if the
opera�on is constrained by the labor input. Similarly, decreasing the labor input can reduce capacity. Another factor that influences capacity is the level of
mo�va�on of employees. Increasing mo�va�on can increase capacity, and if mo�va�on of employees slips, then capacity falls. Machine produc�on rate also
influences capacity. In an opera�on that is machine constrained, adding people will not increase capacity if machines are already being operated at the proper
speed and for all the available �me. New machines can be purchased or exis�ng machines can be operated more efficiently to increase capacity in this
situa�on. Product quality, also, affects capacity. Improving quality will increase the capacity of opera�ons, and allowing quality to slip will decrease capacity. If
an organiza�on produces a product of inferior quality and the part is rejected, the capacity used to produce the part has been wasted. Finally, product yield
influences capacity. In virtually all opera�ons, the quan�ty of output is less than the quan�ty of input. Increasing or decreasing yield, which is a ra�o of the
quan�ty of output to the quan�ty of input, affects capacity.

6. Explain in detail the difference between departmental and system capacity.
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Departmental capacity is the capacity of a given opera�on. However, the system concept forces management to realize that opera�ons are a combina�on of
departments, machines, and processes which work together to create finished products. To be effec�ve, management must know the capacity of the whole
system, not the capaci�es of its, individual parts.

7. What are the principles for determining system capacity in the product layout?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

In a product layout with a dominant flow, a bo�leneck prevents preceding departments from moving products at top speed and starves departments that
follow. Therefore, determining the bo�leneck is essen�al to determining capacity. Moreover, it is important to know how far the system capacity can be
increased before the next bo�leneck appears. So, we see that the analysis of system capacity and associated bo�lenecks are essen�al for determining capacity,
and it is only through understanding these concepts that ra�onal decisions about capacity can be made.

8. What are the principles for determining system capacity in the process layout?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

In the process layout, each product does not follow the same path through the system. The search for system capacity is not a search for the minimum
department capacity, because there is no dominant flow. The capacity of the process system is a func�on of the jobs it must do. Capacity decisions and
capacity planning in a process layout require a forecast of the product mix.

9. How does a change in the product mix effect system capacity?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

An organiza�on has a product mix any �me it produces and sells more than one product. The product mix is the percent that each product is of the total
number of units sold. If each product produced by a company consumes the same amount per unit of a cri�cal resource, say labor, then the mix of products
does not affect capacity. If one product consumes more labor hours per unit than another, then the organiza�on will be able to produce less of the high
resource-consuming product. If the product mix changes so that an organiza�on is producing more of the high resource-consuming product and less of the low
resource-consuming product, then the organiza�on’s capacity is lower. If the product mix changes so that an organiza�on is producing more of the low
resource-consuming product than the high resource-consuming product, then the organiza�on’s capacity is higher.

10. What are the important decisions for capacity planners?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Informed capacity decisions can only be made when the manager knows the present capacity, the bo�lenecks and their causes, and has an es�mate of future
demand. With this informa�on, the manager can work to make capacity decisions involving: 1) When to add capacity; 2) How much capacity to add; 3) Where
the capacity should be added; and 4) What type of capacity should be added? The final ques�on regarding type of capacity is also a process selec�on ques�on
because it deals with the level and type of automa�on.

11. What are the key factors that determine when to add capacity?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Answering the ques�on of when to add capacity is not as simple as it may appear. Capacity is a variable, which is subject to change through management
innova�on and decision making. Adding another shi� or increasing over�me can increase capacity. Be�er scheduling or opera�ng procedures may increase
capacity. Improved quality of raw materials can increase capacity. Because management has the ability to increase capacity without building new facili�es,
managers do not have to react by building new facili�es each �me demand exceeds capacity. Managers need to build facili�es when they an�cipate that the
increase in demand is for a long period of �me and the increase is greater than can be met by the other less expensive alterna�ves described in the chapter.

Processing math: 0%

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 52/55

12. What are the key factors that determine how much capacity to add?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Once a firm has decided on when to add capacity, it is faced with the ques�on of how much capacity to build. There are many differently-sized facili�es that
could be considered. However, there are two approaches that should be considered. First, enough capacity could be added to meet immediate needs, that is
one or two years. Second, management could build more capacity than required in the next one to two years to meet long term demand and to protect
against an unan�cipated increase in demand. If management is to build the extra capacity it should consider these factors: 1) How long before the extra
capacity is needed?; 2) How likely is it that the forecasts are accurate?; 3) How stable is the technology?; 4) If the demand does not materialize can the facility
be easily converted to the produc�on of other products?

13. Why would an organiza�on want to reduce its capacity?
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cove

Organiza�ons are faced with reducing capacity because demand for some products has declined, shi�ing capacity to another loca�on because of today’s highly
compe��ve global environment, and replacing exis�ng facili�es with new facili�es with newer technology and improved efficiency. In many cases, subs�tute
products eliminate or greatly reduce the demand for a product. For example, the introduc�on of computers and word processing so�ware has virtually
eliminated the use of typewriters.

Problems

1. Determine the system capacity and the bo�leneck department in the following line flow process. The capaci�es in pieces per hour for departments A, B, and C are
5,250, 4,650, and 5,300, respec�vely.

2. Determine the system capacity and the bo�leneck department in the following line flow process. The capaci�es in tons per hour for departments A, B, C, and D are
2,200, 1,100, 1,600, and 2,500, respec�vely. For each ton of output from depart�ment B that is input to department D, two tons from department C must be
added.

3. Answer the following ques�ons using the informa�on in Problem 2:
a. How much can the system capacity be increased by adding capacity to the bo�leneck department?
b. How much capacity must be added to the bo�leneck department to achieve this increase in system capacity?
c. Which department is the new bo�leneck department?

4. Examine the following line flow process:
a. Determine the system capacity.
b. Determine which department is the bo�leneck.
c. Determine how much capacity can be gained by adding capacity to the bo�leneck.
d. Explain your answers to a, b, and c.
e. How would the analysis change if department A achieved an 85% yield? Recalculate a, b, and c.

Department Capacity (Parts/Hour)
A 120
B 110
C 140
D 160

5. Macro Galvanizing coats sheet steel for the appliance industry in its plant in Gary, Indiana. Macro has one produc�on line that can coat steel up to 72 inches wide.
The produc�on line runs 80 hours per week. Regardless of width, the steel is processed at 200 feet per minute. Macro processes only the three widths of steel
listed here:

Processing math: 0%

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 53/55

Width (in.) Product Mix
36 0.30
50 0.25
60 0.45

a. What is the capacity of Macro’s produc�on line in square feet of steel coated per week?
b. What is the capacity in square feet per week if the mix changes to 0.40, 0.40, and 0.20, respec�vely?
c. What is the capacity in square feet per week if the mix does not change and Macro decides to use 10% over�me per week?
d. What is the capacity in square feet per week if the mix does not change, there is no over�me, and Macro experiences 5% unplanned down�me?
e. What is the capacity in square feet per week if the mix does not change, there is no over�me, and Macro’s engineers find a way to run the line at 220 feet per

minute?

6. Monique Food Processing Company produces light snacks that can be heated in a microwave. The following steps are included in the process:

Steps Descrip�on Capacity (Units/Hour)
1 Prepare food 200
2 Measure and place in plas�c pouch 175
3 Prepare cardboard box 200
4 Insert pouch into box 300
5 Shrink-wrap box 200

a. What is the system capacity, and which is the bo�leneck department?
b. How much slack (unused capacity) is available in other departments?
c. How much system capacity can be gained by adding capacity to the bo�leneck?

7. Botkins Bicycle Shop manufactures 10-speed bikes. The assembly process requires the components listed below. Botkins can assemble approximately 350 bicycles
per week without over�me. The labor contract allows Botkins’ management to add up to 10% over�me to assembly opera�ons.

Component Quan�ty per Finished Bicycle Source Capacity (Units/Week)
Wheels 2 Internal 750
Tires 2 External 900
Frame 1 Internal 400
Brakes 2 External 950
Handle bars 1 Internal 600
Pedal and drive sprocket subassembly 1 Internal 500

a. What is the capacity of the facility without using over�me? Which is the bo�leneck department(s)?
b. What is the capacity of the facility with over�me? Which is the bo�leneck department(s)?
c. What increases in department capacity would be required to increase system capacity to 450 units per week?

8. The Mills Brothers Cereal Company makes a wheat and raisin cereal on one of its produc�on lines. One pound of raisins is required for four pounds of wheat flakes
in order to make five pounds of cereal. The following steps are included in the process:

Step Descrip�on Capacity (Pounds/Hour)
A Crush wheat 1,400
B Form flakes 1,200
C Toast flakes 1,600
D Coat raisins 250
E Mix cereal and raisins 1,200
F Put mixture in box 1,100
G Place boxes in shipping containers 1,400

a. What is the system capacity, and which is the bo�leneck department?
b. How much slack (unused capacity) is available in other departments?
c. How much system capacity can be gained by adding capacity to the bo�leneck?

9. White Chemical has a problem with its opera�ons. Analyze the following flow process:

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 54/55

Department Capacity (Gallons/hour)
A 100
B 60
C 50
D 120
E 100
F 40
G 140

The ra�o for mixing the outputs from departments E and F is 2:1. This means that ge�ng three gallons out of G requires mixing two gallons of E’s output and
one gallon of F’s output. The ra�o for departments B and C is 1:1.

a. What is the system’s capacity?
b. Which department(s) is the bo�leneck?
c. How much slack (unused capacity) is available in the other departments?
d. How much system capacity can be gained by adding capacity to the bo�leneck?

10. Pla�num Refining and Chemical Company is examining its pes�cide plant. At this �me, the company is unable to sa�sfy customer demand for a new insect spray.
You have been asked to spend some �me at the facility to determine how output can be increased. Analyze the following line flow process:

Department Capacity (Gallons/Hour)
A 300
B 250
C 200
D 250
E 600
F 550
G 600
H 1,100
I 300
J 1,200

The ra�o for mixing the outputs from departments B, C, and D is 2:2:1, respec�vely. This means that making five gallons for department E requires mixing two
gallons of B’s output, two gallons of C’s output, and one gallon of D’s output. The ra�o for departments F and G is 1:1. The ra�o for departments H and I is
4:1.

a. What is the system capacity, and which is the bo�leneck department?
b. How much slack (unused capacity) is available in other departments?
c. How much system capacity can be gained by adding capacity to the bo�leneck?

11. Bauer Electric makes integrated circuits for the computer industry. Currently, the process for making circuits yields 80% good parts. The facility has the capacity to
produce 2,000,000 units per year, including both good and bad units. The variable cost is $2.00 per unit. The annual fixed cost is $10,000,000. The selling price is
$12.00 per unit. Currently, the market demand exceeds the units available.

a. If Bauer Electric works at capacity, what is the total amount of units produced in one year that meet specifica�ons?
b. If the yield can be increased from 80% to 90%, how much does the unit cost for a circuit change?
c. If the yield can be increased from 80% to 90% and demand is unlimited, how much will profits increase?
d. If the yield can be increased from 80% to 90% and demand is 1,600,000 units, what is the impact on profits?
e. Why is there such a difference between the answers to c and d?

Processing math: 0%

1/7/2020 Print

https://content.ashford.edu/print/AUBUS644.13.2?sections=cover,ch07,sec7.1,sec7.2,sec7.3,sec7.4,sec7.5,ch07summary,ch08,sec8.1,sec8.2,sec8… 55/55

12. McComas Educa�onal Service provides training to pass the bar exam. The company offers a money back guarantee if a student does not pass on the first try.
Currently, 60% pass the exam. The company is working on some computer-based training that could increase the pass rate to 80%. The cost of the service is $800,
and 10,000 first-�me students enroll in the course each year. Demand has grown at about 5% per year. The variable cost is only $100, and the annual fixed cost is
$2,000,000. For the current cost structure, capacity is 12,000 students per year.

a. Currently, how many first-�me students pass the test each year?
b. If the pass rate increases from 60% to 80%, how much will profits increase?
c. Should McComas consider reducing capacity?

Click here to see solu�ons to the odd-numbered problems.
(h�ps://media.thuze.com/MediaService/MediaService.svc/constella�on/book/AUBUS644.13.2/{pdf}bus644_ch08_odd_problem_solu�ons )

Key Terms
Click on each key term to see the defini�on.

bo�leneck
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The department, worksta�on, or opera�on that limits the flow of product through the produc�on system. This department restricts the flow of product from
upstream departments and starves downstream departments.

capacity
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

A measure of the organiza�on’s ability to provide customers with the demanded services or goods, in the amount requested and in a �mely manner. Capacity is
the maximum rate of produc�on.

machine constrained
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The machine is holding back produc�on. The equipment is opera�ng for all the available �me at its best speed while the operator has some idle �me.

product mix
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The percent of total demand or output that is devoted to each product.

rounding out capacity
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

Adding capacity to a bo�leneck department to increase the capacity of a system by bringing the capacity of the bo�leneck department into balance with the other
departments.

system capacity
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The ability of the organiza�on to produce a sufficient number of goods and services to meet the demands of customers.

yield
(h�p://content.thuzelearning.com/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/books/AUBUS644.13.2/sec�ons/cover/boo

The ra�o of the quan�ty of output to the quan�ty of input.

Processing math: 0%

https://media.thuze.com/MediaService/MediaService.svc/constellation/book/AUBUS644.13.2/%7Bpdf%7Dbus644_ch08_odd_problem_solutions

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

https://content.ashford.edu/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover/books/AUBUS644.13.2/sections/cover#

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy