Analysis of Earthmoving Equipment

Earthmoving equipment is typically used due to the high efficiency of the construction work. In early era human power has been used to move earth requiring plenty of time and manpower. But with the development of technology earthmoving equipment has been introduced to the construction field and nowadays more advanced and easily maneuverable earthmoving equipment are available. Thus the time consumption and manpower is greatly reduced resulting a more efficient and time saving construction methods. There are number of earthmoving equipment that can be used for the construction and each equipment provides a different purpose.
(equipment, 2014)
Excavators

Figure 1: Excavator
Excavators are mainly se to excavate soil. Excavators are very useful in deep excavations as well as it can be used for different applications by changing the bucket to different gadgets. Typically excavators are used in cutting trenches, digging holes and foundation pits, Handling of Material , Construction, General grading or landscaping work, Mining of minerals and gems, River dredging, pile driving, , shafts drilling for footings and blasting of rocks etc.(equipment, 2014)
Backhoe

Don't use plagiarized sources. Get Your Custom Essay on
Analysis of Earthmoving Equipment
Just from $13/Page
Order Essay

Figure 2: Backhoe
Backhoe is a versatile equipment which widely used in construction industry. It is a combination of an excavator and bulldozer. It can be used for quick earthmoving work and it can replace both excavator and bulldozer if the scale of the work is low. Also due to its 4 wheel system it can easily move through any rough terrain. Hence backhoe is typically seen on any construction field. The levers are operated by hydraulic pistons and the bucket can be replaced with other useful add-ons accordance to the requirement. (equipment, 2014)
Bulldozer

Figure 3: Bulldozer
Bulldozer is a very powerful equipment which can be used to move earth and prepare surfaces. Due to its high power and belt wheel system it is used to move heavy soil lumps in one go. It has a large plate or blade attached to its front which facilitates pushing mechanism of large soil, rubble, gravel or other materials. By changing the blade to a ripper it can be used for farming or ground loosening work.
Skid steer loader

Figure 4: Skid Steer Loader
Skid steer loader is a small scale equipment which can be used for quick work and for the places where large equipment cannot be accessible. Easily maneuverability is one of the main advantage of the equipment. Also it can be used to load soil into dump trucks. The main characteristic of this equipment is its wheel can be rotated independently allowing it to turn in limited spaces. (equipment, 2014)
Trencher

Figure 5: Trencher
Trencher is another useful equipment that can be used to dig trenches in construction work.trencher has a long arm equipped with rotating belt of blades. The blades dig trenches while the equipment is moving along the required line. This can also be used for digging of irrigation channels, foundation trenches, road drainages etc. trenchers are also used in farming industry as well. (equipment, 2014)
Motor Grader

Figure 6: Motor Grader
Motor grader is another useful earthmoving equipment. This equipment is heavily used in road construction. The main purpose of a motor grader is to prepare surfaces according to required slopes and angles. With the long blade attached to front arm of the equipment it can prepare flat surfaces. The motor grader is also referred to as road grader due to its heavy usage in road construction. This equipment is also used in irrigation construction as well.
(“History of the Bulldozer”. Retrieved 2008-12-17.)
For the given project I would use excavators, backhoes and Skid steer loader. The main reason for the excavator the amount of soil needs to be excavated to prepare the basement. Backhoes will be used to small scale work and slope preparation work. Skid steer loaders will be used for the small work where space is limited for big equipment.

Get Help With Your Essay
If you need assistance with writing your essay, our professional essay writing service is here to help!
Essay Writing Service

To ensure the equipment is used efficiently, effectively and economically I will preplan the earth moving process and schedule the work plan with allocating time for each equipment so that every equipment is not used at once wasting time. Also I will allocate specific tie limit for each equipment and the operator should be able to finish the allocated work within the given period of time. With such management mechanisms I can use the provided equipment effectively, efficiently and economically.
What methods and resources will you employ to ensure safe and productive operations in deep excavations and trenching for your project? Justify your choice. Support your answer with examples.
I will use shoring method to ensure the stability of soil while deep excavating and also a safety officer should be allocated for supervision of excavation work. Excavations will not be done on rainy days. Also the excavations will be done maintaining minimum slope angles for stability.
There are several steps that need to be taken in order to assure safe and productive opertaions in deep excavations

Preplanning of the work to be done taking following factors into account

Traffic
Proximity and physical condition of nearby structures
Soil classification
Surface and ground water
Location of the water table
Overhead and underground utilities
Weather
Quantity of shoring or protective systems that may be required
Fall protection needs
Number of ladders that may be needed
Other equipment needs

OSHA generally requires that employers protect workers from cave-ins by:  Sloping and benching the sides of the excavation; supporting the sides of the excavation; or Placing a shield between the side of the excavation and the work area.
Define types of temporary works required to deal with stability and groundwater problems in the project.
Typically during excavation process dewatering has to be done while maintaining stability of slopes. There are several practices used in industry maintain stability.
Caissons
Caisson is a structure that is developed at area if the  site is ashore, yet in the event that the venture site is seaward, it is built ashore and afterward skimmed to the site seaward. In the caisson technique for development, the unearthing is performed from inside the permanent structure. After the caisson is in position, uncovering from inside the caisson structure starts. As the unearthing is done, the caisson structure begins to sink by its own weight, or if fundamental, by forced burdens. This strategy proceeds until the coveted foundation level is accomplished. Figure demonstrates this procedure schematically.
( Wilson,1873)

Figure 7: Caissons Installing
Ground Freezing
The theory of ground solidifying is to change the water in the soil into a strong mass of ice. This mass of ice is totally impermeable. Ground solidifying is utilized for groundwater cutoff, for earth bolster, for brief supporting, for adjustment of earth for passage removal, to capture landslides and to balance out deserted mineshafts. The principals of ground solidifying are undifferentiated from pumping groundwater from wells. To solidify the ground, a column of stop channels are set vertically in the soil and warmth vitality is expelled through these funnels. Isotherms (an isotherm is a line interfacing areas with equivalent temperature) move out from the stop channels with time like groundwater forms around a well.
Once the earth temperature comes to 32 °F (0 °C), water in the soil pores swings to ice. At that point additionally cooling continues. The groundwater in the pores promptly solidifies in granular soils, for example, sands. For example, soaked sand accomplishes magnificent quality at just a couple of degrees underneath the point of solidification. On the off chance that the temperature is brought down further, the quality increments hardly. In strong soils, for example, muds, the ground water is molecularly fortified at any rate to some degree to the soil particles. On the off chance that delicate mud is chilled off to solidifying temperature, a few segments of its pore water to start to stop and it causes the earth to harden. With further decrease in temperature, more pore water solidifies and subsequently more quality pick up is accomplished. When planning for solidified earth structures in firm soils, it might be important to determine generously bring down temperatures to accomplish the required quality, than in attachment less soils. A temperature of +20 °F might be adequate in sands, though temperatures as low as -20 °F might be required in delicate soils. The outline of a solidified earth obstruction is represented by the warm properties of the fundamental oils and related reaction to the solidifying framework. Arrangement of solidified earth boundary creates at various rates relying upon the warm and water powered properties of every stratum. Ordinarily, shake and coarse-grained soils solidify quicker than muds and sediments. (Jessica Morrison ,2013)

Figure 8: Ground freezing method
Dewatering Methods – Wellpoints
The wellpoint comprises of an opened or punctured pipe which is secured with a screen work. At the foot of this pipe is a hole which licenses flying of the pipe into the ground amid foundation. A well-point dewatering framework comprises of a progression of firmly set little distance across wells introduced to shallow profundities. These wells are associated with a pipe or header that encompasses the removal and is joined to a vacuum pump. The development ventures in the well point framework are:
1. The wellpoints are jetted into the ground;
2. The annulars void is filled with filter media;
3. The wellpoints are connected to a header pipe by means of a riser;
4. The header pipe is connected to suction pumps for pumping.
Powers, J. Patrick (1992).

Figure 9: Well points
What types of plant and equipment will you use in substructure and drainage activities in your project? Justify your choice. Support your answer with examples.
For the given project first thing that needs to do is providing drainage. While providing proper drainage by means of dewatering pumps and wells. Then to stabilize the earth proper shoring should be needed. Once the shoring is properly established further excavation and substructure work can be commenced.
Drainage and dewatering

Backhoes
Dewatering pumps
Drilling machines
Hoses
Generators etc.

Earth stabilizing

Shoring machines
Cranes
Welding plants
Backhoes and excavators

Substructure work

Skid Steer loader
Backhoe
Excavator
Piling machine

What techniques of installing piling systems and ground stabilization activities will you use in your project? Justify your choice. Support your answer with examples.
The foundation procedure and technique for foundations are similarly critical components as of the outline procedure of heap foundations. Pilefoundation techniques are foundation by heap mallet and exhausting by mechanical auger.In request to evade harms to the piles, amid plan, foundation Methods and foundation hardware ought to be precisely selected.If foundation is to be done utilizing pile pound, then the accompanying components ought to be taken into thought:

Size of the pile and the weight of the pile
The available head room and space
The availability of supporting equipment and machinery
The noise pollution and regulations.
The driving resistance for the designed drilling

Pile driving methods (displacement piles)
Methods of pile driving can be categorised as follows:

Dropping weight
Explosion
Vibration
Jacking (restricted to micro-pilling)
Jetting

Drop hammers   
A hammer with around the heaviness of the pile is brought a reasonable stature up in a guide and discharged to strike the pile head. This is a straightforward type of mallet utilized as a part of conjunction with light casings and test piling, where it might be uneconomical to bring a steam heater or compressor on to a site to drive extremely set number of piles.
There are two main types of drop hammers
1. Single-acting pile hammers which operates using steam or compressed-air comprise a large weight in a cylindrical container. Steam or compressed air rises it up the fixed piston rod. At the top of the blow, or at a reduced height which can be operated by the operator, the steam is cut off and the cylinder falls freely on the pile helmet.
2. Double-acting pile hammers can be run by steam or compressed air. A pilling mount is not mandatory with this mode of hammer which can be fixed to the upperpart of the pile by leg-guides, the pile being directed by a timber structure. When used with a pile mount, back directs are fastened to the hammer to engage with leaders, and only short leg-guides are used to stop the hammer from moving relatively to the top of the pile. These type of hammers are used mainly for sheet pile driving.
Pile driving by vibrating
Vibratory sledges are normally electrically fueled or using pressurized water controlled and comprises of contra-pivoting unconventional masses inside a lodging connecting to the heap head. The abundancy of the vibration is adequate to separate the skin erosion on the sides of the heap. Vibratory strategies are most appropriate to sandy or gravelly soil.
Jetting:to help the entrance of piles into sand or sandy rock, water streaming might be utilized. In any case, the strategy has exceptionally restricted impact in firm to solid muds or any dirt containing much coarse rock, cobbles, or stones.
Boring methods (non-displacement piles)
Continuous Flight Auger (CFA)
Hardware contains a portable base transporter fitted with an empty stemmed flight wood screw which is pivoted into the ground to required profundity of pilling. To shape the heap, cement is put through the flight twist drill as it is pulled back from the beginning. The twist drill is fitted with defensive top on the outlet at the base of the focal tube and is pivoted into the ground by the top mounted turning pressure driven engine which keeps running on a transporter joined to the pole. On achieving the required profundity, profoundly workable cement is pumped through the empty stem of the wood screw, and under the weight of the solid the defensive top is disconnected. While pivoting the wood screw in an indistinguishable bearing from amid the exhausting stage, the ruin is removed vertically as the twist drill is pulled back and the heap is shaped by loading with cement. In this procedure, it is essential that pivot of the wood screw and stream of cement is coordinated that fall of sides of the opening above cement on lower flight of twist drill is evaded. This may prompt to voids in loaded with soil in cement.
The strategy is particularly viable on delicate ground and empowers to introduce an assortment of exhausted heaps of different widths that can infiltrate a large number of soil conditions. Still, for fruitful operation of revolving twist drill the dirt must be sensibly free of tree roots, cobbles, and stones, and it must act naturally supporting. Amid operation little soil is brought upwards by the twist drill that horizontal burdens are kept up in the dirt and voiding or extreme slackening of the dirt limit. Be that as it may, if the pivot of the wood screw and the progress of the twist drill are not coordinated, bringing about evacuation of soil amid penetrating perhaps prompting to fall of the side of the gap.
Figure 10: Piling and Auguring
Underreaming
An extraordinary component of wood screw exhausted heaps which is here and there used to empower to misuse the bearing limit of appropriate strata by giving a developed base. The dirt must be fit for standing open unsupported to utilize this method. Firm and to hard muds, for example, the London dirt, are perfect. In its shut position, the underreaming instrument is fitted inside the straight area of a heap shaft, and after that extended at the base of the heap to create the underream appeared in fig. 3.Normally, after establishment and before cement is threw, a man conveying enclosure is brought down and the pole and the underream of the heap is reviewed. (Fleming et al, 1985,)
What methods and processes of constructing foundations including will you use in your project? Justify your choice. Describe the resources that you will use for the construction of foundations. Justify your choice.
In the event of soils having low bearing limit, overwhelming auxiliary burdens are generally bolstered by giving Raft or tangle establishments. Likewise if the structure is defenseless against subsidence on being situated in mining range or because of questionable conduct of its sub-soil water condition, flatboat or tangle establishments ought to be favored. Raft or Mat Foundations gives an efficient answer for troublesome site conditions, where heap establishment can’t be utilized profitably and free section balance gets to be distinctly impracticable.

Find Out How UKEssays.com Can Help You!
Our academic experts are ready and waiting to assist with any writing project you may have. From simple essay plans, through to full dissertations, you can guarantee we have a service perfectly matched to your needs.
View our services

Raft or tangle establishments comprises of thick fortified solid slab covering the whole range of the base of the structure like a story. The piece is strengthened with bars running at right points to each other both close base and top face of the section. Now and again it is important to convey the over the top section stack by a course of action of reversed principle shafts and auxiliary bars, cast solidly with the flatboat piece.
The Raftslab for the most part ventures for a separation of 30 cm. to 45cm. on every one of the sides of the external dividers of the structure in that capacity the region of exhuming is marginally more than the range of the structure itself. The unearthing is made to the required profundity and the whole uncovered territory is very much united. This surface, when dry, gives the base whereupon the flatboat or tangle section is laid. Every one of the precautionary measures that are important to be seen amid the strengthened solid development are entirely clung to and promote development is begun simply after the curing of the Raft has been completely done.Halpin, Daniel W.; Senior, Bolivar A. (2010).

Describe methods and resources that you will use in processes, undertaking drainage works including culverts and installing services in your project.
Culverts and drainage works
Excavation
The area of the proposed drainage will be set out on the ground by checking with paint and pegs at pit areas. Where works are along edge of existing roadway movement light or stop/go framework might be set up to do works. A trench will then be unearthed between pits utilizing an excavator with material stacked to dump truck. The trench width will differ contingent upon the measure of the pipe.
Installation
Where drains are being introduced a layer of geotextile material should be put along the framework of the trench and a layer of channel stone might then be put in base of trench to get pipe work. The pipe work should then be laid to the right line and level by utilizing a review laser
Backfilling of Ducting
The remaining stone might then be put by six ton dumper up to underside of topping where geotextile should be turned out under topping layer. The rest of the depleted might be bested up once surfacing works are done up to wearing course level. Establishment of layer of Geogrid should likewise be done at this stage. All chambers on the deplete lines might be built with pre-thrown solid catch pits and should be put as pipeline continues. (Turner-Fairbank Highway research Center ,1998)

Figure 12: Culverts
What types of plant and equipment will you use in the construction of superstructure your project? Justify your choice. Support your answer with examples.
Construction of superstructure requires lot of machinery and equipment and the uses may vary throughout the different stages of the project. Following are a list of equipment and the uses of each equipment.

Equipment

Uses

Batching plant

Concrete Production

Concrete pump

Concrete pouring to higher levels

Tower crane

Shifting materials

Elevator

Shifting materials and laborers

Formwork systems

Form the structure

Scaffolding

For higher level work

Poker vibrator

For compaction of concrete

The batching plant will produce concrete required to construction and concrete mixture truck and pump will support to pour concrete to slabs, columns and beams. Tower crane and elevator will help to move goods and laborers respectively. Scaffoldings, formwork systems and poker vibrator will be used for concrete pouring and form the columns, slabs and beams of the building.
What methods and resources will you use in undertaking the main forms of structural activities in you project? Include the use of concrete in its various forms as well as the use of structural steelwork. Provide relevant examples. Justify your choices.
Mainly concrete will be used together with steel to form the superstructure. Typically formwork will be established first and then concrete together with steel will be used to cast columns, beams and slabs of the building. For the aforementioned task concrete pumps, poker vibrators, laborers and skilled supervisors will be needed.
Concrete is typically used for this type of construction work due to its workability. Liquid state of concrete allows us to cast different required shapes and forms of structures with ease. Whereas steel is a pre-fabricated material hence steel does not provide the freedom to use for different shapes. But steel is also a very good construction material which facilitates fast construction. Structural steelwork can be used together with concrete to produce composite structures. Also steel can be used alone for buildings as well. (Concrete Association, 2013)
What methods of false work and formwork will you use in the superstructure activities in your project? Provide examples. Justify your choice. What processes of concrete production, delivery and placement will you use in your project? Justify your choice.
Formwork implies the surface of the frame and surrounding used to contain and shape wet cement until it is self-supporting.
Formwork incorporates the structures on or inside which the solid is poured and the casings and propping which give soundness. Albeit ordinarily alluded to as a component of the formwork get together, the joists, bearers, propping, establishments and footings are actually alluded to as false work. Formwork development may include high hazard exercises like working fueled portable plant like cranes, working at stature and unearthing establishments.
The outline of the last solid structure can majorly affect the simplicity of formwork development and the wellbeing and security of individuals amid development. For the most part the more essential and basic the last solid structure, the more secure it is to develop, erect and destroy the formwork.
An accomplished formwork creator ought to be counseled amid the plan of in-situ solid structures to empower the wellbeing and dangers amid formwork development and destroying to be considered in the outline. The formwork originator must be equipped in formwork configuration including reporting brief work stages and exceptional gear required for safe formwork development on location. A creator may utilize a specialized standard or a blend of gauges and building standards significant to the plan prerequisites the length of the result is an outline that meets administrative necessities.
Concrete production – Concrete Batching plant
Concrete will be produced in a batching plant to ensure the quality and strength of the concrete.
Concrete Delivery – Mixture truck
Mixture trucks will be used to deliver concrete to the site from the batching plant to prevent loss of workability and quality of concrete
Concrete Placement- Concrete pump truck
Concrete will be placed to higher levels using a concrete pumping truck. This way we can efficiently pour concrete.  (Concrete Association, 2013)
Identify and assess the hazards arising from the substructure activities.

Falling of unstabilized soil
Falling to deep excavated trenches and pits
Hazards associated with excavators
Shorings can be weak
Damages to underground electrical wires

Explain the legal framework of health, safety and welfare and the requirements of the current CDM Regulations.
The Construction (Design and Management) Regulations 2015 (CDM 2015) addresses the management of health, safety and welfare of workers in construction projects. CDM 2015 substituted the Construction (Design and Management) Regulations 2007 (CDM 2007) and the Accepted Code of Practice which is providing supporting direction on CDM 2007 was inhibited.
CDM 2015 aims to uplift health and safety in the industry by providing guidance to:

Rationally plan the work so the risks tangled are succeededthroughout.
Have the correct people for the correct job at the correct time
collaborate and organize your work
have the properinfo about the risks and how they are managed
convey information efficiently to those who need to know
consult and occupy workers for the risks management activities and educate them how they are being managed

The CDM2007 Regulations expect to lessen development mischances and sick wellbeing in Great Britain by empowering the different partners of the development business to enhance in arranging and dealing with their activities contemplating matters of security and wellbeing at an early stage in the venture definition. By beginning concentrating on these basic focuses toward the start of a venture, dangers can be recognized and supervisors can use sound judgment in front of challenges. In this new form of the directions, the HSC concentrates on correspondence and co-appointment between every one of the gatherings required in the development venture and set up a few obligations for each of the distinctive partners. It likewise highlights that the measure of printed material and all the administration brought on by the past rendition of the controls ought to be diminished and the attention put on the arranging and administration.
The CDM set up commitments for customers and fashioners. The fundamental commitment forced to the customer is to delegate the primary partners for the arranging and the acknowledgment of development work. By ‘development work’, the CDM extensively alludes to ‘the doing of building, structural designing or building development word’ .Among the dutyholders which take an interest to the doing of the venture are the Client, the Designer, the CDM-Coordinator, the Principal Contractor and the Contractors.
(The Construction (Design and Management) Regulations ,2007)
Evaluate and justify the role of the planning coordinator who has been appointed to the project.
Construction project coordinators plan, organize, and guide the actions of a construction project, under the guidance of a manager. He works on-site most of the time, over looking the day-to-day tasks of the project. He works for residential, commercial and industrial construction companies or for construction departments of companies outside the construction industry.
Generally, construction project coordinators:

Make contracts and negotiate alterations to contracts with architects, consultants, clients, suppliers, and subcontractors.
Suggest and implement QC programs.
Make progress reports for clients.
Control the acquisition of building materials and land.
Hire and supervise subcontractors and staff.

During the excavation works the contractor found that the sub-soil in a section of the site to be contaminated. All site activities were halted pending further investigations. Following the investigations it was found that the site was contaminated with caustic soda and from material linked to buried heavy fuel tanks. The client has asked for a design solution to the problem.

The contaminated ground can be treated with 5% ferric chloride treat the caustic soda contamination.
Proper waterproofing of basement can further ensure that the caustic soda intrusion is completely blocked.
Burried heavy fuel tanks should be properly sealed to prevent further leakages.
If the contaminated section can be completely removed it should be removed and disposed safely to continue construction work.

(Risk Assessment Guidance for Superfund, Human Health Evaluation Manual)
Produce a risk assessment for the above problem.
Hazard identification

What Will You Get?

We provide professional writing services to help you score straight A’s by submitting custom written assignments that mirror your guidelines.

Premium Quality

Get result-oriented writing and never worry about grades anymore. We follow the highest quality standards to make sure that you get perfect assignments.

Experienced Writers

Our writers have experience in dealing with papers of every educational level. You can surely rely on the expertise of our qualified professionals.

On-Time Delivery

Your deadline is our threshold for success and we take it very seriously. We make sure you receive your papers before your predefined time.

24/7 Customer Support

Someone from our customer support team is always here to respond to your questions. So, hit us up if you have got any ambiguity or concern.

Complete Confidentiality

Sit back and relax while we help you out with writing your papers. We have an ultimate policy for keeping your personal and order-related details a secret.

Authentic Sources

We assure you that your document will be thoroughly checked for plagiarism and grammatical errors as we use highly authentic and licit sources.

Moneyback Guarantee

Still reluctant about placing an order? Our 100% Moneyback Guarantee backs you up on rare occasions where you aren’t satisfied with the writing.

Order Tracking

You don’t have to wait for an update for hours; you can track the progress of your order any time you want. We share the status after each step.

image

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

Areas of Expertise

Although you can leverage our expertise for any writing task, we have a knack for creating flawless papers for the following document types.

image

Trusted Partner of 9650+ Students for Writing

From brainstorming your paper's outline to perfecting its grammar, we perform every step carefully to make your paper worthy of A grade.

Preferred Writer

Hire your preferred writer anytime. Simply specify if you want your preferred expert to write your paper and we’ll make that happen.

Grammar Check Report

Get an elaborate and authentic grammar check report with your work to have the grammar goodness sealed in your document.

One Page Summary

You can purchase this feature if you want our writers to sum up your paper in the form of a concise and well-articulated summary.

Plagiarism Report

You don’t have to worry about plagiarism anymore. Get a plagiarism report to certify the uniqueness of your work.

Free Features $66FREE

  • Most Qualified Writer $10FREE
  • Plagiarism Scan Report $10FREE
  • Unlimited Revisions $08FREE
  • Paper Formatting $05FREE
  • Cover Page $05FREE
  • Referencing & Bibliography $10FREE
  • Dedicated User Area $08FREE
  • 24/7 Order Tracking $05FREE
  • Periodic Email Alerts $05FREE
image

Our Services

Join us for the best experience while seeking writing assistance in your college life. A good grade is all you need to boost up your academic excellence and we are all about it.

  • On-time Delivery
  • 24/7 Order Tracking
  • Access to Authentic Sources
Academic Writing

We create perfect papers according to the guidelines.

Professional Editing

We seamlessly edit out errors from your papers.

Thorough Proofreading

We thoroughly read your final draft to identify errors.

image

Delegate Your Challenging Writing Tasks to Experienced Professionals

Work with ultimate peace of mind because we ensure that your academic work is our responsibility and your grades are a top concern for us!

Check Out Our Sample Work

Dedication. Quality. Commitment. Punctuality

Categories
All samples
Essay (any type)
Essay (any type)
The Value of a Nursing Degree
Undergrad. (yrs 3-4)
Nursing
2
View this sample

It May Not Be Much, but It’s Honest Work!

Here is what we have achieved so far. These numbers are evidence that we go the extra mile to make your college journey successful.

0+

Happy Clients

0+

Words Written This Week

0+

Ongoing Orders

0%

Customer Satisfaction Rate
image

Process as Fine as Brewed Coffee

We have the most intuitive and minimalistic process so that you can easily place an order. Just follow a few steps to unlock success.

See How We Helped 9000+ Students Achieve Success

image

We Analyze Your Problem and Offer Customized Writing

We understand your guidelines first before delivering any writing service. You can discuss your writing needs and we will have them evaluated by our dedicated team.

  • Clear elicitation of your requirements.
  • Customized writing as per your needs.

We Mirror Your Guidelines to Deliver Quality Services

We write your papers in a standardized way. We complete your work in such a way that it turns out to be a perfect description of your guidelines.

  • Proactive analysis of your writing.
  • Active communication to understand requirements.
image
image

We Handle Your Writing Tasks to Ensure Excellent Grades

We promise you excellent grades and academic excellence that you always longed for. Our writers stay in touch with you via email.

  • Thorough research and analysis for every order.
  • Deliverance of reliable writing service to improve your grades.
Place an Order Start Chat Now
image

Order your essay today and save 30% with the discount code Happy