CLS 495 Clinical Laboratory Science Capstone


This is my decisive Course Design on Clinical Laboratory, and it has lewd tonnage to it. Attached muniment has the biased instructions on has this elimination design is going to be executed, amicable go through the muniment. Due epoch are listed below: 

Phase 1 PROJECT TOPIC: Introduction-Draft is due on 14 September 2019.

Phase 2 PROJECT TOPIC: Introduction Decisive drain, Literature Review drain, References drain (stint of 30) is due on 28 September 2019.

Phase 3 PROJECT TOPIC: Literature Review Final, References Final, Conclusion and Recommendation drain, Appendices drain is due on 10 October 2019.

Phase 4 PROJECT TOPIC: Decisive Elimination Thesis, Complete design into a decisive, Photo-ready vision, and a Power Point for verbal presentation/defend is due on 23 October 2019.

Thank you very fur for the anticipated aid.