A simple application of linear programming A country needs to produce at least 100 TWh of…


A rudimentary collision of straight programming A country needs to yield at last 100 TWh of electricity from coal and eventual gas. The maximum annual formation competency for coal-fred ability is 70 TWh, for natural-gas-fred ability 80 TWh. The CO2 emissions should be limited to 60 Mtonne per year. Further input data: CO2 emissions factor 0.80 Mtonne/TWh for coal and 0.40 Mtonne/TWh for eventual gas. Costs of electricity production: €80 million/ TWh for coal and €100 million/TWh for eventual gas. a. Create a diagram in which these disgusting constraints are depicted. b. Find the discontinuance after a while the meanest costs.